  "fields": [{"id":"_id","type":"int"},{"id":"Program Type","type":"text","info":{"notes":"Identifies whether the project is Rehabilitation or Expansion.","type_override":"text","frictionless_dict":[{"type":"string","name":"Program Type"}]}},{"id":"Start Year","type":"text","info":{"notes":"Year the project started or is scheduled to start.","type_override":"text","frictionless_dict":[{"type":"string","name":"Start Year"}]}},{"id":"Region","type":"text","info":{"notes":"Geographic area the project resides.","type_override":"text","frictionless_dict":[{"type":"string","name":"Region"}]}},{"id":"Highway","type":"text","info":{"notes":"Highway number(s).","type_override":"text","frictionless_dict":[{"type":"string","name":"Highway"}]}},{"id":"Location","type":"text","info":{"notes":"Where on the highway the project is occurring.","type_override":"text","frictionless_dict":[{"type":"string","name":"Location"}]}},{"id":"Type Of Work","type":"text","info":{"notes":"Kind of work being performed.\r\n","type_override":"text","frictionless_dict":[{"type":"string","name":"Type Of Work"}]}},{"id":"Highway Program Status","type":"text","info":{"notes":"Status of the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Highway Program Status"}]}},{"id":"Target Completion","type":"text","info":{"notes":"Year the project was completed or is scheduled to be completed.","type_override":"text","frictionless_dict":[{"type":"string","name":"Target Completion"}]}},{"id":"Contract #","type":"text","info":{"notes":"Contract # associated to the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Contract #"}]}},{"id":"Project Length (kilometres)","type":"text","info":{"notes":"Length of the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Project Length (kilometres)"}]}},{"id":"Estimated Cost Range","type":"text","info":{"notes":"Value of the project within defined dollar ranges.","type_override":"text","frictionless_dict":[{"type":"string","name":"Estimated Cost Range"}]}},{"id":"Engineering Status","type":"text","info":{"notes":"Status of the engineering component of the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Engineering Status"}]}},{"id":"Delivery Method","type":"text","info":{"notes":"Type of delivery method of the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Delivery Method"}]}}],
  "records": [
    [1,"Expansion","2022","West","6","0.1 km north of Maltby Rd. to 0.3 km south of Wellington Rd. 34, Wellington County","New interchange","Completed","2025","2021-3004","2.3","$25 to $100 million","Design complete","Design-Build"],
    [2,"Expansion","2023","West","3","Essex Rd. 23 to Essex Rd. 34, Essex County, Contract 2","Two to four-lane widening","Underway","2027","2022-3018","15.7","$100 to $250 million","Design complete","Public Private Partnership"],
    [3,"Expansion","2023","West","401","Hwy 4 (Colonel Talbot Rd.), Hwy 4 underpass and Glanworth Dr. underpass, County of Middlesex","Bridge replacement, Interchange improvements","Underway","2027","2022-3008","4","$25 to $100 million","Design complete","Design-Build"],
    [4,"Expansion","2024","West","7","Frederick St. underpass, Kitchener","Bridge replacement, Utility relocations","Underway","2027","2023-3030","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [5,"Expansion","2025","West","3, 4, Not applicable","Clinton Line to 1.9 km east of First Ave. (Hwy 3 Talbotville Bypass and Hwy 4 widening), County of Elgin","Two to four-lane widening, New four-lane highway","Underway","2027","2025-3007","8","$100 to $250 million","Design complete","Design-Bid-Build"],
    [6,"Expansion","2026","West","3","Ron McNeil Line to Centennial Ave., St. Thomas","Two to four-lane widening","Planned","Not available",null,"8","$100 to $250 million","Design underway","Design-Bid-Build"],
    [7,"Expansion","2026","West","401","Regional Rd. 33 (Townline Rd.)  to Wellington Rd. 32, Cambridge","Six to ten-lane widening with high occupancy vehicle lane","Planned","2027-2028","2025-3028","0.3","$10 to $25 million","Design underway","Design-Bid-Build"],
    [8,"Expansion","2027-2028","West","7P","Grand River Bridges, Kitchener","New bridge","Planned","Not available","2027-3002","0","$100 to $250 million","Design underway","To be determined"],
    [9,"Expansion","Upcoming expansion","West","6","Maltby Rd. to Speed River, Guelph","Reconstruction, New interchange","Planned","Not available",null,"11.4","$500 million to $1 billion","Planning/environmental assessment underway","To be determined"],
    [10,"Expansion","Upcoming expansion","West","7","0.1 km north of Speedvale Ave. northerly to 0.4 km north of Woodlawn Rd., Guelph","New interchange","Planned","Not available","2021-3018","0","$25 to $100 million","Design underway","To be determined"],
    [11,"Expansion","Upcoming expansion","West","40","Indian Rd. to Wellington St., Lambton","Two to four-lane widening","Planned","Not available",null,"7.1","$100 to $250 million","Planning/environmental assessment underway","To be determined"],
    [12,"Expansion","Upcoming expansion","West","401","1 km west of Hwy 4 to 0.7 km east of Wellington Rd., London to Tilbury, Contract 2","Four to six-lane widening","Planned","Not available","2023-3001","10.2","$100 to $250 million","Design underway","To be determined"],
    [13,"Expansion","Upcoming expansion","West","401","1.4 km west of Elgin Rd. 20 (Union Rd.) to 1.0 km west of Hwy 4 (Colonel Talbot Rd.), London to Tilbury, Contract 2","Four to six-lane widening","Planned","Not available","2023-3002","13.6","$100 to $250 million","Design underway","To be determined"],
    [14,"Expansion","Upcoming expansion","West","6","North of Freelton to Maltby Rd., Guelph (Morriston Bypass)","New four-lane highway, Six to ten-lane widening","Planned","Not available",null,"12","$500 million to $1 billion","Planning/environmental assessment underway","To be determined"],
    [15,"Expansion","Upcoming expansion","West","7P, 85","Kitchener to Guelph, Phase 3","New four-lane highway, New bridge","Planned","Not available",null,"18.4","Over $1 billion","Planning/environmental assessment underway","To be determined"],
    [16,"Expansion","2022","Central","QEW","Cawthra Rd. to Dixie Rd., Mississauga","New interchange, Bridge rehabilitation, Bridge replacement, Culvert rehabilitation","Underway","2026","2021-2127","0","$100 to $250 million","Design complete","Design-Bid-Build"],
    [17,"Expansion","2022","Central","400","King Rd. to Lloydtown-Aurora Rd., York","High occupancy vehicle lane expansion","Completed","2025","2022-2017","12.3","$100 to $250 million","Design complete","Design-Bid-Build"],
    [18,"Expansion","2023","Central","427, QEW","Evans Ave. and 427 and The Queensway, Toronto","Bridge rehabilitation","Completed","2025","2023-2013","0.7","$10 to $25 million","Design complete","Design-Bid-Build"],
    [19,"Expansion","2024","Central","400","Hwy 400/CR 88 interchange, Bradford-West Gwillimbury","Bridge replacement","Underway","2028","2024-2006","3.4","$25 to $100 million","Design complete","Design-Bid-Build"],
    [20,"Expansion","2024","Central","400","Langstaff Rd. to Major Mackenzie Dr., York","High occupancy vehicle lane expansion","Underway","2027","2024-2010","14.5","$100 to $250 million","Design complete","Design-Bid-Build"],
    [21,"Expansion","2025","Central","413","Hwy 401/407, Milton","Grading","Completed","2025","2025-2065","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [22,"Expansion","2025","Central","To be assigned","Bradford Bypass, 10th Sideroad advance work, Bradford West Gwillimbury, Contract 2","Grading","Completed","2025","2025-2034","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [23,"Expansion","2025","Central","404","Mulock Dr. to Queensville Side Rd., York","Intelligent transportation system","Underway","2026","2025-2012","10","$0 to $10 million","Design complete","Design-Bid-Build"],
    [24,"Expansion","2026","Central","400, To be assigned","Bradford Bypass, Hwy 400 to County Rd. 4, Bradford","New four-lane highway","Planned","Not available","2026-2005","6.5","$500 million to $1 billion","Design underway","Construction Manager General Contractor"],
    [25,"Expansion","2026","Central","413","Hwy 407 overpass, Halton","New bridge, Six to eight-lane widening","Planned","2027-2028","2026-7001","0","$25 to $100 million","Design underway","Design-Bid-Build"],
    [26,"Expansion","2026","Central","413","Bovaird Dr. underpass, Brampton","New bridge","Planned","2027-2028","2026-7002","0","$25 to $100 million","Design underway","Design-Bid-Build"],
    [27,"Expansion","2026","Central","413","Hurontario St. underpass, Caledon","New bridge","Planned","Not available","2025-2021","14.5","$25 to $100 million","Design underway","Design-Bid-Build"],
    [28,"Expansion","2026","Central","5, 6","Hwy 5/6 interchange, Hamilton","New interchange","Planned","Not available","2025-2004","9.1","$100 to $250 million","Design complete","Design-Bid-Build"],
    [29,"Expansion","2027-2028","Central","To be assigned","Bradford Bypass, County Rd. 4 to Yonge St., Bradford","New four-lane highway, New bridge","Planned","Not available","2027-2001","4.9","Over $1 billion","Design upcoming","To be determined"],
    [30,"Expansion","2027-2028","Central","404","Stouffville Rd. to Mulock Rd., York","Intelligent transportation system","Planned","Not available",null,"12","$10 to $25 million","Design underway","To be determined"],
    [31,"Expansion","2027-2028","Central","To be assigned","Bradford Bypass, Yonge St. to Hwy 404, Bradford","New four-lane highway, New interchange, New bridge","Planned","Not available",null,"4.8","Over $1 billion","Design upcoming","To be determined"],
    [32,"Expansion","2027-2028","Central","QEW","Garden City Skyway, St. Catharines, Phase 1","New bridge","Planned","Not available","2024-2008","0","$500 million to $1 billion","Design upcoming","Progressive Design-Build"],
    [33,"Expansion","Upcoming expansion","Central","7","Brock Rd. to Reesor Rd., Pickering, Markham","Two to four-lane widening","Planned","Not available",null,"0","$25 to $100 million","Design upcoming","To be determined"],
    [34,"Expansion","2024","Eastern","417","Patrol yard, Renfrew","Facility improvements","Underway","2026","2024-4033","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [35,"Expansion","2025","Eastern","35","Patrol yard on Glenarm Rd., Kawartha Lakes","New facility","Underway","2026","2023-4010","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [36,"Expansion","Upcoming expansion","Eastern","17, 417","Scheel Dr. to 3 km west of Bruce St., Renfrew","Two to four-lane widening, New interchange, New bridge, Bridge replacement, Bridge widening","Planned","Not available",null,"22.5","$250 to $500 million","Design underway","To be determined"],
    [37,"Rehab","2021","West","401","Grand River Bridges, Kitchener","Bridge replacement, Bridge rehabilitation","Completed","2025","2020-3001","0","$100 to $250 million","Design complete","Construction Manager General Contractor"],
    [38,"Rehab","2022","West","401","CNR overhead, Pond Mills overpass, Highbury Ave. underpass, London","Bridge replacement, Interchange improvements","Underway","2027","2022-3004","0","$100 to $250 million","Design complete","Design-Build"],
    [39,"Rehab","2022","West","401","Middlesex Rd. 32 (Dorchester Rd.) underpass, Thames Centre","Interchange improvements, Resurfacing, Bridge replacement","Completed","2025","2022-3009","1.7","$25 to $100 million","Design complete","Design-Build"],
    [40,"Rehab","2022","West","401","Middlesex Rd. 30 (Putnam Rd.) overpass to Hwy 19, Ingersoll","Bridge rehabilitation, Resurfacing","Completed","2025","2021-3037","10","$25 to $100 million","Design complete","Design-Build"],
    [41,"Rehab","2023","West","6","Mckenzie Creek Bridge, Haldimand County","Bridge replacement","Completed","2025","2022-3024","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [42,"Rehab","2023","West","9","Bruce Rd. 4 to Walkerton, County of Bruce","Resurfacing, Bridge replacement, Intersection improvements","Completed","2026","2022-3025","14.6","$10 to $25 million","Design complete","Design-Bid-Build"],
    [43,"Rehab","2024","West","401","Ojibway Pkwy to North Talbot Rd., County of Essex","Intelligent transportation system","Completed","2025","2023-3033","11","$0 to $10 million","Design complete","Design-Bid-Build"],
    [44,"Rehab","2024","West","401","0.7 km east of Bloomfield Rd. to 0.5 km east of Victoria Rd., Chatham-Kent","Resurfacing","Completed","2025","2024-3026","26.8","$0 to $10 million","Design complete","Design-Bid-Build"],
    [45,"Rehab","2024","West","403","2.1 km west of Rest Acres Rd. to Garden Ave., Brantford","Intersection improvements, Guide rail improvements, Road works, Drainage improvements","Completed","2026","2022-3013","15.5","$10 to $25 million","Design complete","Design-Bid-Build"],
    [46,"Rehab","2024","West","21","Forest north limit to 0.5 km south of Lambton Rd. 7 (Lakeshore Rd.), Lambton Shores","Resurfacing","Completed","2025","2025-3003","6.7","$0 to $10 million","Design complete","Design-Bid-Build"],
    [47,"Rehab","2024","West","402","Former CNR overhead (east of Murphy Rd.), Sarnia","Bridge rehabilitation, Resurfacing","Completed","2025","2023-3009","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [48,"Rehab","2024","West","3","Haldimand Rd. 56 to Dunnville west limits, and Dunnville east limit to Wainfleet-Dunnville Townline, Haldimand County","Resurfacing, Culvert rehabilitation, Drainage improvements","Completed","2025","2024-3005","18.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [49,"Rehab","2024","West","401","Roseville Rd. underpass, Regional Municipality of Waterloo","Culvert rehabilitation, Bridge replacement","Underway","2026","2022-3005","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [50,"Rehab","2025","West","4","Elginfield to Exeter, Ilderton Rd. intersection and Medway Rd. intersection, County of Huron and Middlesex","Resurfacing","Completed","2025","2024-3002","18","$0 to $10 million","Design complete","Design-Bid-Build"],
    [51,"Rehab","2025","West","401, 402","Commercial Vehicle Inspection Facilities, Windsor, Sarnia and Putnam","Facility improvements","Completed","2025","2024-3037","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [52,"Rehab","2025","West","401","Bloomfield Rd. interchange and Seventh Line West, Chatham","Intersection improvements","Completed","2025","2025-3025","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [53,"Rehab","2025","West","6","Marden Creek Culvert, County of Wellington","Culvert rehabilitation","Completed","2025","2025-3009","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [54,"Rehab","2025","West","401","Merlin Rd. to Bloomfield Rd., Chatham","Resurfacing","Completed","2025","2025-3030","12","$0 to $10 million","Design complete","Design-Bid-Build"],
    [55,"Rehab","2025","West","6","Various intersections, Kortright/Downey Rd., Stone Rd., College Ave., Paisley Rd., Willow Rd., Speedvale Ave., and Woodlawn Rd., County of Wellington","Resurfacing","Underway","2026","2025-3017","12.3","$0 to $10 million","Design complete","Design-Bid-Build"],
    [56,"Rehab","2025","West","3","Otter Creek, Tilsonburg","Drainage Improvements","Completed","2025","2024-3025","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [57,"Rehab","2025","West","40","CNR overhead, Sarnia","Bridge replacement, Intersection improvements","Underway","2027","2022-3011","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [58,"Rehab","2025","West","40","Petrolia Line to Churchill Rd., Lambton","Resurfacing","Completed","2025","2025-3010","5.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [59,"Rehab","2025","West","402","Kerwood Rd. to 3.2 km east of Nauvoo Rd., Lambton and Middlesex County","Resurfacing","Completed","2025","2025-3024","7.9","$0 to $10 million","Design complete","Design-Bid-Build"],
    [60,"Rehab","2025","West","401","Various interchanges at Manning Rd., Puce Rd., Belle River Rd., French Line Rd. and Hwy 77, Essex County","Resurfacing","Completed","2025","2025-3033","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [61,"Rehab","2025","West","401","Wellington Rd. 32 to 3.4 km east of Watson Rd. South, Wellington County","Resurfacing","Underway","2026","2025-3008","14","$25 to $100 million","Design complete","Design-Bid-Build"],
    [62,"Rehab","2025","West","402","Wonderland Rd. interchange, City of London","Intersection improvements","Completed","2025","2025-3018","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [63,"Rehab","2025","West","40","Wellington St. to 0.5 km north of Hwy 402 and Bissel McArthur Drain Culvert, Sarnia","Resurfacing, Culvert rehabilitation","Completed","2026","2025-3012","3.1","$0 to $10 million","Design complete","Design-Bid-Build"],
    [64,"Rehab","2025","West","401, 403","Foldens Line (Oxford Rd. 6) underpass,  Dodge Line underpass, Garden Ave. underpass, Johnson Rd. underpass, Oxford County, County of Brant","Bridge rehabilitation","Underway","2026","2026-3001","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [65,"Rehab","2025","West","21","Russell St. and Kincardine Ave., Kincardine","Intersection improvements","Completed","2025","2023-3008","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [66,"Rehab","2021","Central","QEW","QEW/Credit River Bridge, Mississauga","New bridge, Bridge rehabilitation, Resurfacing, Interchange improvements","Completed","2025","2020-2150","0","$250 to $500 million","Design complete","Public Private Partnership"],
    [67,"Rehab","2022","Central","401","Eastbound collector lanes Avenue Rd. to Warden Ave., Leslie St. interchange, ramp to southbound Don Valley Pkwy, Phase 2, Toronto","Bridge rehabilitation, Bridge replacement, Resurfacing","Underway","2026","2022-2013","10.5","$100 to $250 million","Design complete","Design-Bid-Build"],
    [68,"Rehab","2022","Central","401, 403","Hwy 401/403/410 interchange, Eglinton Ave., Phase 4A Mississauga","Bridge rehabilitation, Culvert rehabilitation","Completed","2025","2021-2002","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [69,"Rehab","2022","Central","400","Essa Rd. overpass, Barrie","Bridge replacement, Interchange improvements","Completed","2025","2022-2008","3.8","$100 to $250 million","Design complete","Design-Bid-Build"],
    [70,"Rehab","2022","Central","400","Innisfil Beach Rd., CNR overhead, Innisfil","Bridge rehabilitation, Bridge replacement","Underway","2026","2020-2121","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [71,"Rehab","2023","Central","403","Trinity Rd.,  Shaver Rd., Alberton Rd., Sunnyridge Rd., Hamilton","Roundabout, Bridge rehabilitation","Completed","2025","2023-2006","0.5","$10 to $25 million","Design complete","Design-Bid-Build"],
    [72,"Rehab","2023","Central","401","Avenue Rd. to Jane St. westbound express lanes, Wilson Ave., Bathurst St., Dufferin St., CNR overhead, Toronto","Reconstruction, Bridge rehabilitation, Resurfacing","Completed","2025","2023-2015","7.4","$25 to $100 million","Design complete","Design-Bid-Build"],
    [73,"Rehab","2023","Central","QEW","Garden City Skyway, Niagara","Intelligent transportation system, Safety improvements","Underway","2031","2023-2034","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [74,"Rehab","2023","Central","405","Queenston-Lewiston Bridge to QEW, Niagara Falls","Resurfacing","Completed","2025","2023-2009","16.7","$25 to $100 million","Design complete","Design-Bid-Build"],
    [75,"Rehab","2023","Central","427","Dixon Rd., Campus Rd., Renforth Dr., overpass west of Hwy 27, Toronto","Bridge rehabilitation","Completed","2025","2022-2022","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [76,"Rehab","2024","Central","401","Hwy 35/115 overpass, Clarington","Bridge rehabilitation","Completed","2025","2024-2004","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [77,"Rehab","2024","Central","403","King Rd., underpass, Burlington","Bridge rehabilitation","Underway","2026","2024-2031","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [78,"Rehab","2024","Central","QEW","Gilmore Rd. to Netherby Rd., Fort Erie","Resurfacing","Completed","2025","2024-2019","16.9","$10 to $25 million","Design complete","Design-Bid-Build"],
    [79,"Rehab","2024","Central","400","Various locations, Simcoe","Culvert replacement","Completed","2025","2024-2025","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [80,"Rehab","2024","Central","QEW","Truck Inspection Station, Oakville north recessed lanes, Oakville","Commercial vehicle inspection facility","Completed","2025","2024-2057","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [81,"Rehab","2024","Central","400","Fesserton Rd. underpass, Quarry Rd. underpass, Port Severn Rd. underpass, Simcoe","Bridge rehabilitation","Completed","2025","2024-2002","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [82,"Rehab","2024","Central","QEW","Niagara St. to Seventh St., St. Catharines","Resurfacing","Completed","2025","2024-2016","16.6","$25 to $100 million","Design complete","Design-Bid-Build"],
    [83,"Rehab","2024","Central","48","Mount Albert Rd. CNR , Black River, Baldwin River, Pefferlaw Brook, CNR at Hwy 48, tributary crossing to Pefferlaw Brook, Georgina","Bridge rehabilitation, Culvert rehabilitation","Underway","2027","2024-2022","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [84,"Rehab","2024","Central","401","Wilson Rd. overpass, Oshawa","Bridge replacement","Underway","2026","2024-2023","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [85,"Rehab","2024","Central","9","Hwy 27 to Tottenham Rd., west of Regional Rd. 50 to west of Airport Rd., CNR, CPR overhead, Humber River, New Tecumseth, Caledon","Resurfacing, Culvert rehabilitation, Bridge rehabilitation, Intersection improvements, Traffic signals","Underway","2027","2024-2024","18.6","$25 to $100 million","Design complete","Design-Bid-Build"],
    [86,"Rehab","2024","Central","401","Westney Rd., Duffin's Creek eastbound, Durham","Bridge rehabilitation","Completed","2025","2024-2005","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [87,"Rehab","2024","Central","QEW","Burlington Bay Skyway, Niagara bound, Hamilton","Bridge rehabilitation","Underway","2026","2024-2011","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [88,"Rehab","2024","Central","400","Hwy 12 overpass, CNR overhead, Matchedash Bay Bridge, Simcoe","Bridge rehabilitation","Completed","2025","2023-2003","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [89,"Rehab","2024","Central","404","Stouffville Rd. to Mulock Dr., Whitchurch-Stouffville","Bridge replacement, Culvert rehabilitation, Bridge rehabilitation, Resurfacing","Underway","2026","2024-2012","16.5","$25 to $100 million","Design complete","Design-Bid-Build"],
    [90,"Rehab","2025","Central","400","Hwy 9 to North Canal Rd., Holland River, Bradford-West Gwillimbury","Bridge replacement","Underway","2027","2024-2003","2.4","$25 to $100 million","Design complete","Design-Bid-Build"],
    [91,"Rehab","2025","Central","89","Nottawasaga River Bridge to Essa 5th Line, eastbound lanes, and Nicolston Culvert, New Tecumseth","Bridge widening, Intersection improvements, Resurfacing","Underway","2026","2025-2020","0.4","$0 to $10 million","Design complete","Design-Bid-Build"],
    [92,"Rehab","2025","Central","58","Thorold Tunnel, Thorold, Contract 2","Tunnel rehabilitation","Completed","2025","2024-2020","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [93,"Rehab","2025","Central","5, 8","Hwy 5/Middletown Rd., Hwy 8/Woodhill Rd., Peter's Corners","Intersection improvements","Underway","2027","2025-2019","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [94,"Rehab","2025","Central","QEW","Central Ave. to Bowen Rd., Fort Erie","Resurfacing, Noise barriers","Underway","2026","2025-2005","8.8","$10 to $25 million","Design complete","Design-Bid-Build"],
    [95,"Rehab","2025","Central","QEW","Victoria Ave. to Casablanca Blvd., Toronto bound, Niagara","Resurfacing","Underway","2026","2025-2008","17.3","$10 to $25 million","Design complete","Design-Bid-Build"],
    [96,"Rehab","2025","Central","403","Glen Erin Dr., Hurontario St., Mavis Rd., Central Pkwy to Winston Churchill Blvd., Mississauga","Bridge rehabilitation, Culvert rehabilitation, Resurfacing, Noise barriers","Underway","2027","2024-2014","21.8","$25 to $100 million","Design complete","Design-Bid-Build"],
    [97,"Rehab","2025","Central","9","The Gore Rd., Caledon","Traffic signals","Underway","2026","2024-2007","0.4","$0 to $10 million","Design complete","Design-Bid-Build"],
    [98,"Rehab","2025","Central","401","Whites Rd. to Neilson Rd., westbound express and collector lanes, Pickering, Toronto","Bridge rehabilitation, Resurfacing, Bridge coating","Underway","2029","2025-2007","9.1","$25 to $100 million","Design complete","Design-Bid-Build"],
    [99,"Rehab","2025","Central","401","CNR overhead at Brock Rd., Pickering","Bridge rehabilitation","Underway","2026","2024-2036","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [100,"Rehab","2025","Central","10","Hwy 410 to Peel Regional Rd. 11, Caledon","Resurfacing","Underway","2026","2025-2014","14.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [101,"Rehab","2025","Central","400","Dunlop St. underpass, Barrie","Bridge replacement, Interchange improvements","Underway","2028","2024-2013","2.7","$100 to $250 million","Design complete","Design-Bid-Build"],
    [102,"Rehab","2025","Central","QEW","Various locations, Niagara","Intelligent transportation system","Underway","2026","2024-2062","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [103,"Rehab","2025","Central","93","Regional Rd. 27 to Hwy 12/Simcoe Rd. 93, Wye River Bridge, Tay","Resurfacing, Bridge rehabilitation","Underway","2026","2025-2002","11.2","$0 to $10 million","Design complete","Design-Bid-Build"],
    [104,"Rehab","2025","Central","QEW","Various locations, Peel, Halton, Hamilton, Niagara","Culvert rehabilitation","Underway","2026","2025-2015","10.2","$0 to $10 million","Design complete","Design-Bid-Build"],
    [105,"Rehab","2025","Central","410","Bovaird Dr. to Mayfield and  Countryside Dr. underpass,  Brampton","Resurfacing, Bridge rehabilitation","Underway","2026","2025-2016","4.4","$10 to $25 million","Design complete","Design-Bid-Build"],
    [106,"Rehab","2025","Central","410","Derry Rd., Mayfield Rd., Mississauga","Bridge rehabilitation, Culvert rehabilitation","Underway","2026","2025-2017","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [107,"Rehab","2025","Central","401","Eastbound lanes Courtice Rd. to Stevenson Rd., Park Rd., Cubert St., Oshawa","Bridge replacement, Resurfacing, Bridge rehabilitation, Culvert rehabilitation","Underway","2028","2025-2001","9.5","$25 to $100 million","Design complete","Design-Bid-Build"],
    [108,"Rehab","2023","North, East","17","West of North Bay","Environmental cleanup","Underway","2026","2022-5011","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [109,"Rehab","2024","North, East","118","East of Hwy 11 easterly to Haliburton County and Muskoka District boundary, Bracebridge","Paved shoulders, Resurfacing","Completed","2025","2022-5007","26.6","$25 to $100 million","Design complete","Design-Bid-Build"],
    [110,"Rehab","2024","North, East","400","Hwy 400 south of Muskoka Rd. 34/48 interchange northerly to Crooked Bay, south of Crooked Bay","Resurfacing, Bridge rehabilitation","Completed","2025","2024-5045","7.8","$10 to $25 million","Design complete","Design-Bid-Build"],
    [111,"Rehab","2024","North, East","118, 35","South of Hwy 118 northerly, Carnarvon","Bridge rehabilitation, Resurfacing, Paved shoulders","Completed","2025","2023-5136","10.6","$10 to $25 million","Design complete","Design-Bid-Build"],
    [112,"Rehab","2025","North, East","35","North junction of Haliburton Rd. 121 northerly, Minden","Resurfacing, Paved shoulders","Completed","2025","2025-5015","11.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [113,"Rehab","2025","North, East","11","Hwy 11/Muskoka Rd. 117 interchange in Bracebridge and Beaver Creek Culvert in Gravenhurst","Culvert rehabilitation","Completed","2030","2020-5161","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [114,"Rehab","2025","North, East","17","Santala Rd. underpass, 2.3 km east of Hwy 144, Sudbury","Intelligent transportation system","Underway","2028","2024-5157","0.1","$0 to $10 million","Design complete","Design-Bid-Build"],
    [115,"Rehab","2020","Eastern","Not applicable","Wolfe Island Ferry Service, shoreline infrastructure upgrades, Kingston","Dock replacements","Underway","2027","2020-4037","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [116,"Rehab","2021","Eastern","417","Mid-Town Bridges, Ottawa","Bridge replacement, Interchange improvements, Noise barriers","Underway","2026","2020-4075","0","$100 to $250 million","Design complete","Construction Manager General Contractor"],
    [117,"Rehab","2022","Eastern","417","Aviation Bridge and Walkley Rd, Ottawa","Bridge rehabilitation, Culvert rehabilitation, Culvert replacement","Completed","2025","2022-4009","5.1","$25 to $100 million","Design complete","Design-Bid-Build"],
    [118,"Rehab","2022","Eastern","401","Moulinette to Cornwall, United Counties of Stormont, Dundas and Glengarry","Resurfacing, Culvert rehabilitation","Underway","2026","2022-4003","19.6","$25 to $100 million","Design complete","Design-Bid-Build"],
    [119,"Rehab","2023","Eastern","7","Lindsay, Hwy 7  to Hwy 35, Kawartha Lakes","Two to four-lane widening, Culvert rehabilitation","Underway","2026","2022-4008","2.9","$25 to $100 million","Design complete","Design-Bid-Build"],
    [120,"Rehab","2023","Eastern","17","Forester Falls Rd. and Astrolabe Rd., Cobden","Culvert replacement","Completed","2025","2022-4014","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [121,"Rehab","2024","Eastern","28","Lily Creek, McArthurs Mills, Hastings County","Culvert rehabilitation","Underway","2026","2023-4012","2","$0 to $10 million","Design complete","Design-Bid-Build"],
    [122,"Rehab","2024","Eastern","401","Gully Rd., Lyle St. underpass, Township of Alnwick/Haldimand","Bridge rehabilitation","Completed","2025","2024-4048","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [123,"Rehab","2024","Eastern","401","Wyman Rd. to County Rd. 6, United Lennox and Addington","Resurfacing","Completed","2025","2023-4030","30.3","$10 to $25 million","Design complete","Design-Bid-Build"],
    [124,"Rehab","2024","Eastern","401","Hwy 2  to Mallorytown Rd., United Counties of Leeds and Grenville","Resurfacing","Underway","2026","2024-4005","14","$25 to $100 million","Design complete","Design-Bid-Build"],
    [125,"Rehab","2024","Eastern","138","Cornwall to Monkland, United Counties of Stormont, Dundas and Glengarry","Resurfacing, Intersection improvements","Underway","2026","2023-4006","18.1","$10 to $25 million","Design complete","Design-Bid-Build"],
    [126,"Rehab","2024","Eastern","60","Wilno to Nipissing District boundary, County of Renfrew","Resurfacing, Culvert rehabilitation","Completed","2025","2024-4016","7.8","$10 to $25 million","Design complete","Design-Bid-Build"],
    [127,"Rehab","2024","Eastern","28","Eels Creek Bridge depot, Woodview, County of Peterborough","Bridge replacement","Completed","2025","2021-4090","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [128,"Rehab","2025","Eastern","401","Stewart Blvd. underpass, North Augusta Rd., underpass, Brockville","Bridge rehabilitation","Underway","2026","2024-4050","0.1","$0 to $10 million","Design complete","Design-Bid-Build"],
    [129,"Rehab","2025","Eastern","28","Apsley to Bancroft, Peterborough County","Culvert replacement, Culvert rehabilitation","Underway","2026","2022-4005","42","$10 to $25 million","Design complete","Design-Bid-Build"],
    [130,"Rehab","2025","Eastern","416","Fallowfield Rd., Ottawa","Bridge rehabilitation","Completed","2025","2025-4002","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [131,"Rehab","2025","Eastern","15","CNR Bridge at Hwy 15, Kingston","Bridge rehabilitation","Underway","2026","2023-4025","0.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [132,"Rehab","2025","Eastern","417","Panmure Rd. to east of Campbell Dr., Ottawa","Resurfacing","Completed","2025","2024-4052","15","$10 to $25 million","Design complete","Design-Bid-Build"],
    [133,"Rehab","2025","Eastern","15","County Rd. 42, United Counties of Leeds and Grenville","Intersection improvements","Underway","2026","2023-4098","0.8","$0 to $10 million","Design complete","Design-Bid-Build"],
    [134,"Rehab","2025","Eastern","41","Madawaska River Bridge to south of County Rd. 512, County of Renfrew","Resurfacing, Culvert replacement","Completed","2025","2024-4009","42","$0 to $10 million","Design complete","Design-Bid-Build"],
    [135,"Rehab","2025","Eastern","33","Glenora Ferry to Bath, County of Lennox and Addington","Culvert rehabilitation","Completed","2025","2025-4003","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [136,"Rehab","2025","Eastern","401","Westbound east of Belleville CNR to Wyman Rd., County of Hastings","Paved shoulders, Reconstruction, Bridge rehabilitation","Underway","2026","2024-4004","14.5","$25 to $100 million","Design complete","Design-Bid-Build"],
    [137,"Rehab","2025","Eastern","17","Various locations, County of Renfrew","Culvert replacement, Culvert rehabilitation","Completed","2025","2025-4028","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [138,"Rehab","2025","Eastern","401","County Rd. 28 to County Rd. 2, County of Northumberland","Bridge replacement, Resurfacing","Underway","2030","2024-4057","0","$25 to $100 million","Design complete","Design-Bid-Build"],
    [139,"Rehab","2025","Eastern","Not applicable","Howe Island Ferry Service, Kingston and County of Frontenac, Howe Island","Dock improvements","Underway","2026","2022-4030","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [140,"Rehab","2025","Eastern","7","Black River and Skootamata River, Actinolite, Hastings County","Bridge replacement","Underway","2027","2022-4010","0","$10 to $25 million","Design complete","Design-Build"],
    [141,"Rehab","2025","Eastern","401","Rockport Rd., Leeds and Grenville County","Bridge rehabilitation","Underway","2026","2024-4049","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [142,"Rehab","2025","Eastern","401","County Rd. 32 underpass, Gananoque","Bridge rehabilitation, Culvert replacement","Underway","2026","2025-4012","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [143,"Rehab","2025","Eastern","416","County Rd. 43 to Century Rd., United Counties of Leeds and Grenville","Culvert rehabilitation","Completed","2025","2025-4011","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [144,"Rehab","2025","Eastern","416","Knoxdale Rd., Cedarview Rd., North Gower, CPR overhead, Raycroft, Ottawa","Bridge rehabilitation, Culvert rehabilitation","Underway","2026","2024-4056","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [145,"Rehab","2025","Eastern","28","Hwy 7 to Strickland St., County of Peterborough","Resurfacing","Underway","2026","2024-4015","13.7","$0 to $10 million","Design complete","Design-Bid-Build"],
    [146,"Rehab","2025","Eastern","115","Boundary Rd. to Hwy 7 and Hwy 115, Kawartha Lakes, County of Peterborough","Resurfacing","Underway","2026","2025-4009","20","$10 to $25 million","Design complete","Design-Bid-Build"],
    [147,"Rehab","2025","Eastern","118","West of Hwy 28, County of Hastings","Culvert replacement","Underway","2026","2025-4051","0","$0 to $10 million","Design complete","Design-Build"],
    [148,"Rehab","2025","Eastern","7","Hwy 28 to Norwood, County of Peterborough","Resurfacing","Underway","2026","2025-4006","19","$10 to $25 million","Design complete","Design-Bid-Build"],
    [149,"Rehab","2025","Eastern","62","Ivanhoe to Madoc, County of Hastings","Resurfacing","Underway","2026","2024-4055","11.6","$0 to $10 million","Design complete","Design-Bid-Build"],
    [150,"Rehab","2026","West","402","Front St. to 0.1 km east of Uttoxeter Rd., Sarnia and Plympton-Wyoming, Lambton County","Intelligent transportation system","Planned","2027-2028","2026-3008","23","$10 to $25 million","Design underway","Design-Bid-Build"],
    [151,"Rehab","2026","West","6","Rocky Saugeen River Bridge, Culvert 451 and Culvert 453, Grey County","Bridge rehabilitation, Culvert replacement","Planned","2026","2025-3014","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [152,"Rehab","2026","West","85","University Ave. interchange, Laurel Creek Culvert, Waterloo","Culvert replacement","Planned","2027-2028","2025-3016","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [153,"Rehab","2026","West","21","Eighteen Mile Creek Bridge, Amberly and Cashore Creek Culvert, Allenford","Bridge rehabilitation, Culvert rehabilitation","Planned","2026","2025-3029","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [154,"Rehab","2026","West","403","1.4 km east of West Quarter Townline to 2.1 km west of Rest Acres Rd. and Rest Acres Rd. interchange, County of Brant","Interchange improvements, Guide rail improvements, Roundabout","Planned","2027-2028","2025-3023","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [155,"Rehab","2026","West","401","Tremblay Creek Culvert and Gracey Side Rd. underpass, Lakeshore","Bridge rehabilitation, Culvert rehabilitation","Planned","2027-2028","2026-3003","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [156,"Rehab","2026","West","23","Perth County Line 20, Russeldale","Roundabout","Planned","2026","2024-3032","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [157,"Rehab","2026","West","7, 8","Fairway Rd. underpass to  Hwy 7 interchange, Kitchener","Overhead signage","Planned","2026","2024-3007","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [158,"Rehab","2026","West","7","Perth East Rd. 111, County of Perth","Intersection improvements","Planned","2026","2025-3011","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [159,"Rehab","2026","West","85","Lancaster St. to Regional Rd. 15, Regional Municipality of Waterloo","Resurfacing","Planned","2027-2028","2026-3011","7.5","$10 to $25 million","Design underway","Design-Bid-Build"],
    [160,"Rehab","2026","West","6","Wellington Rd. 22, Centre Wellington","Intersection improvements","Planned","2026","2022-3022","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [161,"Rehab","2026","West","7","Courtland Ave. to Victoria St., Kitchener","Resurfacing","Planned","2027-2028","2026-3010","4.2","$0 to $10 million","Design underway","Design-Bid-Build"],
    [162,"Rehab","2026","West","401","Chatham-Kent Rd. 27 (Bloomfield Rd.) underpass, Chatham","Bridge replacement, Interchange improvements","Planned","2027-2028","2025-3015","0","$25 to $100 million","Design underway","Design-Bid-Build"],
    [163,"Rehab","2026","West","401","Norwich Ave. (Oxford Rd. 59) to 1.0 km east of Oxford Hwy 2, Woodstock","Resurfacing","Planned","2026","2026-3009","3.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [164,"Rehab","2026","West","6","Ferndale to Lindsay Rd. 20, Bruce Peninsula","Resurfacing","Planned","2026","2023-3013","15.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [165,"Rehab","2026","Central","401","Eastbound lanes, Courtice Rd. to Hwy 35/115, Clarington","Resurfacing","Planned","2027-2028","2026-2018","11.5","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [166,"Rehab","2026","Central","7, 7A","Durham Rd. 57 to Nesbitt Line Rd. and East Cross Creek Culvert, Scugog","Culvert rehabilitation, Resurfacing","Planned","2026","2026-2019","7.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [167,"Rehab","2026","Central","401","0.3 km east of McLaughlin Rd. to Hwy 410/403 interchange, Mississauga","Resurfacing","Planned","2027-2028","2025-2018","3.2","$10 to $25 million","Design complete","Design-Bid-Build"],
    [168,"Rehab","2026","Central","140","Lyons Creek Culvert, Niagara","Culvert rehabilitation","Planned","2027-2028","2024-2029","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [169,"Rehab","2026","Central","QEW","Toronto bound, Van Wagner's Beach Rd. to Renfrew, Hamilton","Noise barriers","Planned","2027-2028","2026-2020","2.9","$10 to $25 million","Design underway","Design-Bid-Build"],
    [170,"Rehab","2026","Central","403","Waterdown  Rd. and Lemonville Rd., Burlington","Bridge rehabilitation","Planned","2027-2028","2025-2013","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [171,"Rehab","2026","Central","412, 418","Hwy 401 to Hwy 407E, Whitby","Safety improvements","Planned","2027-2028","2026-2021","9","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [172,"Rehab","2026","Central","407","Brock Rd. to Hwy 35/115, Pickering, Clarington","Safety improvements","Planned","2027-2028","2026-2022","43","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [173,"Rehab","2026","Central","QEW","QEW/403/407, Fairview St. interchanges, Phase 2, Burlington","Bridge rehabilitation","Planned","Not available","2025-2011","8.1","$25 to $100 million","Design underway","Design-Bid-Build"],
    [174,"Rehab","2026","Central","QEW","Oakville Creek Bridge, Toronto Bound, Oakville","Bridge rehabilitation","Planned","2027-2028","2025-2006","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [175,"Rehab","2026","Central","QEW","0.3 km east of  Victoria Ave. to 1.5 km east of  Casablanca Blvd., Niagara bound, Niagara","Culvert rehabilitation, Resurfacing, Noise barriers","Planned","2027-2028","2026-2010","15.5","$25 to $100 million","Design underway","Design-Bid-Build"],
    [176,"Rehab","2026","Central","26","Wyant Rd. to north of Nottawasaga Rd. 30/31, Clearview","Resurfacing","Planned","2026","2026-2008","3.5","$0 to $10 million","Design underway","Design-Bid-Build"],
    [177,"Rehab","2026","Central","11","Old Barrie Rd. and Coldwater Rd., Orillia","Bridge replacement","Planned","Not available","2026-2002","0","$100 to $250 million","Design complete","Design-Build"],
    [178,"Rehab","2026","Central","401","Eastbound core and collector lanes west of Victoria Park Ave. to east of Neilson Rd., Toronto","Bridge replacement, Bridge rehabilitation, Resurfacing","Planned","Not available","2026-2004","9.5","$250 to $500 million","Design underway","Design-Bid-Build"],
    [179,"Rehab","2026","Central","6","Hwy 6/York Rd., Peter's Corners","Intersection improvements","Planned","2026","2026-2006","1.1","$0 to $10 million","Design underway","Design-Bid-Build"],
    [180,"Rehab","2026","Central","QEW","1.0 km west of Netherby Rd., to Lyons Creek Rd., Niagara","Resurfacing","Planned","2027-2028","2026-2023","19.7","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [181,"Rehab","2026","Central","58, 58A, To be assigned","Various locations, Niagara","Resurfacing, Bridge rehabilitation, Culvert rehabilitation, Culvert replacement","Planned","Not available","2026-2007","13.8","$25 to $100 million","Design upcoming","Design-Bid-Build"],
    [182,"Rehab","2026","Central","401","Bennett Rd. underpass, Clarington","Bridge replacement","Planned","2027-2028","2026-2009","0","$25 to $100 million","Design underway","Design-Bid-Build"],
    [183,"Rehab","2026","Central","QEW","Centennial Pkwy to Burlington Skwy south end, Redhill Creek, Hamilton","Bridge rehabilitation, Resurfacing","Planned","2027-2028","2026-2024","8.6","$10 to $25 million","Design underway","Design-Bid-Build"],
    [184,"Rehab","2026","Central","400","Hwy 12 north junction/Simcoe Rd. 16 to Severn River Bridge northbound, Severn","Resurfacing","Planned","2026","2026-2011","7.1","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [185,"Rehab","2026","Central","401","Hwy 400 to Kipling Ave. westbound collector lanes, Weston Rd underpass, Toronto","Resurfacing, Bridge rehabilitation","Planned","Not available","2026-2012","4.1","$25 to $100 million","Design underway","Design-Bid-Build"],
    [186,"Rehab","2026","Central","409","Hwy 427 to Hwy 401, Toronto","Bridge rehabilitation, Resurfacing","Planned","2027-2028","2026-2013","5.4","$25 to $100 million","Design underway","Design-Bid-Build"],
    [187,"Rehab","2026","Central","409, 427","Carlingview Dr., Mimico Creek, Hwy 427 northbound tunnel, Turning Rd., Toronto","Bridge rehabilitation, Bridge replacement, Culvert replacement, Culvert rehabilitation, Bridge removal","Planned","2027-2028","2020-2133","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [188,"Rehab","2026","North, East","11, 144, 17","Various locations, variable message signs","Intelligent transportation system","Planned","2026","2025-5105","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [189,"Rehab","2026","North, East","35","South of south junction Haliburton Rd. 121 southerly, Moore Falls","Resurfacing","Planned","2027-2028","2026-5014","18.6","$25 to $100 million","Design underway","Design-Bid-Build"],
    [190,"Rehab","2026","North, East","11","Muskoka Rd. 169 to Muskoka Rd. 6 interchange, Gravenhurst","Resurfacing","Planned","2026","2026-5010","4.5","$10 to $25 million","Design underway","Design-Bid-Build"],
    [191,"Rehab","2026","North, East","11","Severn River Bridge to South Kashe Lake Rd., Severn River","Resurfacing","Planned","2027-2028","2026-5021","7.8","$25 to $100 million","Design underway","Design-Bid-Build"],
    [192,"Rehab","2026","Eastern","148","Pembroke to Greenwood Rd., County of Renfrew","Reconstruction, Intersection improvements","Planned","Not available","2022-4004","3.8","$25 to $100 million","Design complete","Design-Bid-Build"],
    [193,"Rehab","2026","Eastern","401","Carmen Rd. to Hwy 16, Township of South Dundas","Resurfacing","Planned","2027-2028","2026-4019","7.8","$10 to $25 million","Design in procurement","Design-Bid-Build"],
    [194,"Rehab","2026","Eastern","17","Rolphton to 7 km west of Brent Rd., Renfrew","Culvert rehabilitation","Planned","2026","2026-4020","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [195,"Rehab","2026","Eastern","115","Larmer Line underpass and County Rd. 10, Peterborough","Bridge rehabilitation","Planned","2027-2028","2025-4005","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [196,"Rehab","2026","Eastern","416","McKenna Casey/CNR (Strandherd) and Jock River, Ottawa","Bridge rehabilitation","Planned","2027-2028","2019-4099","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [197,"Rehab","2026","Eastern","118","Hadlington Rd. to Loon Lake Rd., County of Haliburton","Culvert rehabilitation","Planned","2026","2026-4002","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [198,"Rehab","2026","Eastern","401","Commercial vehicle inspection facility, Port Hope","Commercial vehicle inspection facility","Planned","2027-2028","2026-4021","0","$25 to $100 million","Design underway","Design-Bid-Build"],
    [199,"Rehab","2026","Eastern","33","County Rd. 8 to Collins Bay Rd., County of Lennox and Addington","Erosion control","Planned","2026","2026-4022","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [200,"Rehab","2026","Eastern","7","Monaghan Pkwy to Fowlers Corners, County of Peterborough","Resurfacing","Planned","2026","2025-4007","6.6","$0 to $10 million","Design underway","Design-Bid-Build"],
    [201,"Rehab","2026","Eastern","35, 7","Hwy 7 and Hwy 35, Haliburton-Kawartha Lakes-Brock","Culvert rehabilitation","Planned","2027-2028","2025-4014","10","$0 to $10 million","Design underway","Design-Bid-Build"],
    [202,"Rehab","2026","Eastern","35","Gull River Bridges, Coboconk","Bridge rehabilitation","Planned","2027-2028","2023-4004","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [203,"Rehab","2026","Eastern","17","Chalk River to Point Alexander, Buchanan/Rolph","Resurfacing","Planned","2026","2025-4049","15.9","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [204,"Rehab","2026","Eastern","34","Hwy 417 to Hawkesbury, United Counties of Prescott and Russell","Resurfacing","Planned","2026","2026-4023","14.2","$0 to $10 million","Design underway","Design-Bid-Build"],
    [205,"Rehab","2026","Eastern","7","Hwy 37 to 1.1 km west of County of Lennox and Addington / Hastings Line","Resurfacing","Planned","2026","2026-4024","8","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [206,"Rehab","2026","Eastern","417","CPR and Cyrville Rd. Bridges, Ottawa","Bridge rehabilitation","Planned","2027-2028","2022-4011","1","$25 to $100 million","Design underway","Design-Bid-Build"],
    [207,"Rehab","2026","Eastern","15","Franktown to Carleton Place, County of Lanark","Resurfacing","Planned","2027-2028","2025-4048","10.2","$10 to $25 million","Design underway","Design-Bid-Build"],
    [208,"Rehab","2026","Eastern","17","Greenwood Rd. westerly to White Water Rd., County of Renfrew","Culvert replacement","Planned","2026","2023-4077","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [209,"Rehab","2026","Eastern","416","Century Rd. to Hwy 417 interchange, Ottawa","Culvert rehabilitation, Culvert replacement","Planned","2027-2028","2026-4025","13","$0 to $10 million","Design underway","Design-Bid-Build"],
    [210,"Rehab","2026","Eastern","401","Moulinette Rd. to County Rd. 8, United Counties Stormont, Dundas and Glengarry","Resurfacing","Planned","2027-2028","2025-4050","19.6","$25 to $100 million","Design underway","Design-Bid-Build"],
    [211,"Rehab","2026","Eastern","33","Collins Bay, Parrott Bay and Millhaven Creek Bridges, Kingston","Bridge rehabilitation","Planned","2027-2028","2026-4026","3","$0 to $10 million","Design underway","Design-Bid-Build"],
    [212,"Rehab","2026","Eastern","401","1.0 km west of County Rd. 38 to Maitland Rd., United Counties of Leeds and Grenville","Drainage Improvements","Planned","2026","2026-4027","213","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [213,"Rehab","2026","Eastern","35","Thunder Bridge Rd. to County Rd. 121, Powles Corners, Kawartha Lakes","Resurfacing","Planned","2026","2026-4028","16.9","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [214,"Rehab","2026","Eastern","41","Cloyne to Machesney Lake Rd., Lennox and Addington County","Resurfacing","Planned","2027-2028",null,"21","$0 to $10 million","Design underway","Design-Bid-Build"],
    [215,"Rehab","2026","Eastern","17","Storyland Rd. to Renfrew Rd. 40 Pembroke, County of Renfrew","Resurfacing","Planned","2027-2028","2026-4017","35.1","$10 to $25 million","Design underway","Design-Bid-Build"],
    [216,"Rehab","2026","Eastern","416","County Rd. 43 to Century Rd., United Counties of Leeds and Grenville","Resurfacing","Planned","2027-2028","2026-4008","19","$10 to $25 million","Design underway","Design-Bid-Build"],
    [217,"Rehab","2026","Eastern","417","Hwy 416 to Maitland Ave., Ottawa","Bridge replacement, Resurfacing","Planned","2027-2028","2024-4053","0","$25 to $100 million","Design underway","Design-Bid-Build"],
    [218,"Rehab","2026","Eastern","416","Glen Smail Rd., United Counties of Leeds and Grenville","Bridge rehabilitation","Planned","2026","2026-4007","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [219,"Rehab","2026","Eastern","417","Scotch River Bridge,  United Counties of Stormont, Dundas and Glengarry","Bridge rehabilitation","Planned","2027-2028","2026-4012","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [220,"Rehab","2026","Eastern","401","Westbrook Rd., Joyceville Rd., Hwy 15., Montreal St., Division St., Kingston","Culvert rehabilitation","Planned","2027-2028","2024-4010","0.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [221,"Rehab","2026","Eastern","417","Limoges to Casselman and South Nation underpass, United Counties of Prescott and Russell, Ottawa","Resurfacing, Bridge rehabilitation","Planned","2027-2028","2026-4014","14","$10 to $25 million","Design underway","Design-Bid-Build"],
    [222,"Rehab","2026","Eastern","33","Glenora Ferry to  Bath, County of Lennox and Addington","Resurfacing","Planned","2026","2026-4016","28","$10 to $25 million","Design underway","Design-Bid-Build"],
    [223,"Rehab","2026","Eastern","416","Roger Stevens Dr., Ottawa","Culvert replacement","Planned","2027-2028","2026-4013","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [224,"Rehab","2026","Eastern","401, 49","Selby Creek Bridge to  6.4 km north of County Rd. 35, County of Hastings","Bridge replacement, Culvert rehabilitation","Planned","2027-2028","2024-4073","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [225,"Rehab","2026","Eastern","401","Fraser Rd., United Counties of Stormont, Dundas and Glengarry","Bridge replacement","Planned","2027-2028","2025-4017","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [226,"Rehab","2027-2028","West","3","St. Thomas to Aylmer, Elgin County","Resurfacing","Planned","2027-2028",null,"12.2","$0 to $10 million","Design underway","To be determined"],
    [227,"Rehab","2027-2028","West","23","Listowel to Palmerston, North Perth","Resurfacing, Intersection improvements","Planned","2027-2028",null,"12","$10 to $25 million","Design in procurement","To be determined"],
    [228,"Rehab","2027-2028","West","10","Margaret St. to 0.5 km north of Grey Highlands Rd. 130, and Boyne River Bridge, Flesherton","Culvert replacement, Resurfacing","Planned","2027-2028","2026-3002","4.2","$0 to $10 million","Design underway","To be determined"],
    [229,"Rehab","2027-2028","West","6","Greens Rd. Intersection, Caledonia","Intersection improvements","Planned","2027-2028","2026-3004","0","$0 to $10 million","Design underway","To be determined"],
    [230,"Rehab","2027-2028","West","401","Former CNR overpass Lawrence Station, Elgin County","Bridge removal, Reconstruction","Planned","2027-2028","2027-3001","0","$10 to $25 million","Design underway","To be determined"],
    [231,"Rehab","2027-2028","West","23","Monkton to Newry, North Perth","Resurfacing","Planned","2027-2028",null,"8.5","$0 to $10 million","Design in procurement","To be determined"],
    [232,"Rehab","2027-2028","West","85","Hwy 7 to Lancaster St., Regional Municipality of Waterloo","Resurfacing","Planned","2027-2028",null,"2","$0 to $10 million","Design underway","To be determined"],
    [233,"Rehab","2027-2028","West","3","North Creek at Lehmans Pond, Norfolk County","Culvert replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [234,"Rehab","2027-2028","West","401","Waterloo Reg. Rd. 97 (Cedar Creek Rd.), North Dumfries","Bridge replacement","Planned","Not available","2025-3001","0","$25 to $100 million","Design underway","To be determined"],
    [235,"Rehab","2027-2028","West","3","Nineteen Mile Creek Culvert and Culvert 271, Central Elgin","Culvert replacement","Planned","Not available",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [236,"Rehab","2027-2028","West","6","Speedvale Creek Culvert, Guelph","Culvert rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [237,"Rehab","2027-2028","West","6","Swan Creek Culvert, Fergus","Culvert replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [238,"Rehab","2027-2028","West","6","Dornoch to Chatsworth, Grey County","Resurfacing","Planned","2027-2028",null,"16.1","$0 to $10 million","Design upcoming","To be determined"],
    [239,"Rehab","2027-2028","West","21","Maple Grove Branch Drain Culvert, Grand Bend","Culvert replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [240,"Rehab","2027-2028","West","9","Mildmay to Clifford, Bruce and Huron County","Reconstruction, Culvert replacement, Culvert rehabilitation","Planned","Not available","2025-3004","11.4","$25 to $100 million","Design underway","To be determined"],
    [241,"Rehab","2027-2028","West","19","Mount Elgin to Hwy 401, South West Oxford","Resurfacing","Planned","2027-2028",null,"8.6","$0 to $10 million","Design upcoming","To be determined"],
    [242,"Rehab","2027-2028","West","24","Glen Morris Rd. to Myers Rd., Cambridge","Resurfacing","Planned","2027-2028",null,"6.6","$0 to $10 million","Design upcoming","To be determined"],
    [243,"Rehab","2027-2028","West","7","Bleams Rd. (Waterloo Reginal Rd. 4) to Fisher Hallman Rd., Waterloo Region","Resurfacing","Planned","2027-2028",null,"14.5","$10 to $25 million","Design underway","To be determined"],
    [244,"Rehab","2027-2028","West","7","Culvert 474 and Culvert 475, County of Wellington","Culvert replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [245,"Rehab","2027-2028","West","8","Seaforth to Clinton, County of Huron","Resurfacing","Planned","2027-2028",null,"12","$0 to $10 million","Design upcoming","To be determined"],
    [246,"Rehab","2027-2028","West","8","Goderich to Clinton, Central Huron","Resurfacing","Planned","2027-2028",null,"16.6","$0 to $10 million","Design upcoming","To be determined"],
    [247,"Rehab","2027-2028","West","40","Stanley Line to Courtright Line, County of Lambton","Resurfacing","Planned","2027-2028",null,"6.8","$0 to $10 million","Design upcoming","To be determined"],
    [248,"Rehab","2027-2028","West","7, 8","Trussler Rd. overpass, Regional Municipality of Waterloo","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [249,"Rehab","2027-2028","West","89","Shelburne to Primrose, Dufferin County","Resurfacing","Planned","2027-2028",null,"5","$0 to $10 million","Design upcoming","To be determined"],
    [250,"Rehab","2027-2028","West","23","Newry to Listowel, County of Perth","Resurfacing, Bridge rehabilitation, Intersection improvements","Planned","2027-2028",null,"10.1","$10 to $25 million","Design in procurement","To be determined"],
    [251,"Rehab","2027-2028","West","89","Mount Forest to Conn, Southgate and Wellington County","Resurfacing","Planned","2027-2028",null,"12","$0 to $10 million","Design upcoming","To be determined"],
    [252,"Rehab","2027-2028","West","26","Grey Rd. 21 (Osler Bluff Rd.), County of Grey","Intersection improvements","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [253,"Rehab","2027-2028","West","402","2.9 km east of Oil Heritage Rd (Lambton Rd. 30) to 3.2 km east of Nauvoo Rd. including Bear Creek Bridges and Herbert Drain Culvert, Lambton County","Resurfacing, Bridge rehabilitation, Culvert replacement","Planned","2027-2028",null,"19.7","$10 to $25 million","Design underway","To be determined"],
    [254,"Rehab","2027-2028","West","401","Various interchanges, at Furnival Rd., Graham Rd., Iona Rd., and Union Rd., Elgin","Resurfacing","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [255,"Rehab","2027-2028","West","401","Currie Rd. interchange, County of Elgin","Bridge replacement, Interchange improvements","Planned","Not available",null,"0","$25 to $100 million","Design underway","To be determined"],
    [256,"Rehab","2027-2028","West","7","Waterloo Reg. Rd. 51 (Foundry St.) overpasses, Regional Municipality of Waterloo","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [257,"Rehab","2027-2028","West","7","Township Rd. 16 (Sandhills Rd.) underpass, Regional Municipality of Waterloo","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [258,"Rehab","2027-2028","West","7","Waterloo Reg. Rd. 12 (Queen St.) underpass, Regional Municipality of Waterloo","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [259,"Rehab","2027-2028","West","401","Drake Rd. underpass, Chatham-Kent","Bridge replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design in procurement","To be determined"],
    [260,"Rehab","2027-2028","West","21","Huron Rd. 31 (Salford Rd./Tiger Dunlop Rd.), Goderich","Intersection improvements","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [261,"Rehab","2027-2028","West","6","Nichol 2nd Line, Centre Wellington","Intersection improvements","Planned","2027-2028","2022-3023","0","$0 to $10 million","Design underway","To be determined"],
    [262,"Rehab","2027-2028","West","401","Dillon Rd. underpass, Chatham-Kent","Bridge replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design in procurement","To be determined"],
    [263,"Rehab","2027-2028","West","26","Grey Rd. 2, Grey Rd. 113/10th Line, and Culvert 473, Thornbury","Intersection improvements, Culvert rehabilitation","Planned","2027-2028","2025-3013","0","$0 to $10 million","Design underway","To be determined"],
    [264,"Rehab","2027-2028","West","6, To be assigned","Argyle St. Grand River Bridge, Caledonia","Bridge replacement","Planned","Not available","2020-3012","0","$25 to $100 million","Design underway","To be determined"],
    [265,"Rehab","2027-2028","Central","12","Hwy 12 west ramp terminal/Pine St. ramp, Tay","Intersection improvements","Planned","2027-2028","2026-2015","0","$0 to $10 million","Design underway","To be determined"],
    [266,"Rehab","2027-2028","Central","12","Hwy 12/Park St., Simcoe","Intersection improvements","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [267,"Rehab","2027-2028","Central","12","Orchard Point Rd., Orillia","Intersection improvements","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [268,"Rehab","2027-2028","Central","6","Haldibrook Rd., Haldimand County","Intersection improvements","Planned","Not available",null,"0","$0 to $10 million","Design underway","To be determined"],
    [269,"Rehab","2027-2028","Central","410","Mayfield Rd. to Hwy 10, Brampton","Resurfacing, Culvert rehabilitation, Illumination","Planned","2027-2028",null,"3.2","$10 to $25 million","Design underway","To be determined"],
    [270,"Rehab","2027-2028","Central","9","0.5 km west of Airport Rd., Caledon","Intersection improvements","Planned","Not available",null,"0.1","$0 to $10 million","Design upcoming","To be determined"],
    [271,"Rehab","2027-2028","Central","400","Hwy 11 to 0.5 km north of Horseshoe Valley Rd., Springwater","Safety improvements","Planned","2027-2028","2026-2016","13.4","$0 to $10 million","Design upcoming","To be determined"],
    [272,"Rehab","2027-2028","Central","58","CNR overpass, Welland","Bridge rehabilitation","Planned","2027-2028","2025-2040","0","$0 to $10 million","Design underway","To be determined"],
    [273,"Rehab","2027-2028","Central","401","0.3 km east of McLaughlin Rd. to Creditview Rd., Mississauga","Resurfacing","Planned","2027-2028",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [274,"Rehab","2027-2028","Central","400","North Canal, Bradford-West Gwillimbury","Drainage Improvements","Planned","Not available",null,"0","$0 to $10 million","Design underway","To be determined"],
    [275,"Rehab","2027-2028","Central","QEW","Lyons Creek Rd. to Hwy 420, Niagara Falls","Culvert rehabilitation, Resurfacing","Planned","2027-2028",null,"7.4","$10 to $25 million","Design upcoming","To be determined"],
    [276,"Rehab","2027-2028","Central","QEW","Guelph Line to Third Line, Burlington","Resurfacing","Planned","Not available",null,"5.1","$25 to $100 million","Design upcoming","To be determined"],
    [277,"Rehab","2027-2028","Central","10","South junction Peel Rd. 11 to south junction Peel Rd. 24 Main St., Caledon","Resurfacing","Planned","Not available",null,"4.2","$10 to $25 million","Design upcoming","To be determined"],
    [278,"Rehab","2027-2028","Central","140","Hwy 3/Main St. to Forkes Rd., Port Colborne","Resurfacing","Planned","Not available",null,"5.7","$0 to $10 million","Design upcoming","To be determined"],
    [279,"Rehab","2027-2028","Central","403","Hwy 401/410 to Central Pk., Mississauga","Resurfacing","Planned","Not available",null,"4.4","$25 to $100 million","Design upcoming","To be determined"],
    [280,"Rehab","2027-2028","Central","406","Hwy 58 to Geneva St., Thorold","Resurfacing, Noise barriers","Planned","2027-2028",null,"5.5","$10 to $25 million","Design upcoming","To be determined"],
    [281,"Rehab","2027-2028","Central","9","1.0 km west of Airport Rd. to Hwy 10, Caledon","Resurfacing","Planned","2027-2028",null,"8.1","$0 to $10 million","Design upcoming","To be determined"],
    [282,"Rehab","2027-2028","Central","11","Laclie St. interchange to County Rd. 28, Severn","Culvert rehabilitation, Resurfacing","Planned","Not available",null,"10.7","$10 to $25 million","Design upcoming","To be determined"],
    [283,"Rehab","2027-2028","Central","401, 427","Hwy 401 east to Hwy 427 south ramps, Toronto","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [284,"Rehab","2027-2028","Central","48","0.5 km south of York Rd. 9 to 4 km north of York Rd., Sutton","Resurfacing","Planned","2027-2028",null,"4.4","$0 to $10 million","Design upcoming","To be determined"],
    [285,"Rehab","2027-2028","Central","48","Old Homestead Rd., Sutton","Traffic signals","Planned","Not available",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [286,"Rehab","2027-2028","Central","401","Whites Rd. to Hardwood Ave. express and collector, Pickering, Ajax","Resurfacing","Planned","2027-2028",null,"8.5","$25 to $100 million","Design upcoming","To be determined"],
    [287,"Rehab","2027-2028","Central","12","Atherley Narrows Bridge, Orillia","Bridge rehabilitation","Planned","Not available",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [288,"Rehab","2027-2028","Central","420, QEW","Hwy 420 to Hwy 405  , Niagara Falls","Bridge rehabilitation, Resurfacing","Planned","Not available",null,"0","$25 to $100 million","Design upcoming","To be determined"],
    [289,"Rehab","2027-2028","Central","QEW","0.60 km west of Seventh St. to 0.3 km east of Victoria Ave., St. Catharines, Lincoln","Culvert rehabilitation, Bridge rehabilitation, Resurfacing","Planned","Not available",null,"0","$25 to $100 million","Design upcoming","To be determined"],
    [290,"Rehab","2027-2028","Central","6","1.0 km north of Hamilton Rd. 97 to 0.3 km north of Hamilton/Wellington boundary, Campbellville Rd., Hamilton","Resurfacing, Intersection improvements","Planned","Not available",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [291,"Rehab","2027-2028","Central","406","0.7 km south of Beaverdams Rd. to Hwy 58 interchange , Thorold","Resurfacing","Planned","Not available",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [292,"Rehab","2027-2028","Central","410","Williams Parkway, Brampton","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [293,"Rehab","2027-2028","Central","58","Biederman Drain and Biederman Drain Tributary,  Port Colborne","Culvert replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [294,"Rehab","2027-2028","Central","QEW","Third line interchange 113 to 0.8 km east of Trafalgar Rd., interchange 118, Oakville","Culvert replacement, Resurfacing","Planned","Not available",null,"0","$25 to $100 million","Design upcoming","To be determined"],
    [295,"Rehab","2027-2028","Central","QEW","1.2 km east of Winston Churchill Blvd. interchange to Mississauga Rd. interchange 130, Mississauga","Bridge rehabilitation, Resurfacing","Planned","Not available",null,"0","$25 to $100 million","Design upcoming","To be determined"],
    [296,"Rehab","2027-2028","Central","403","1.0 km west of Winston Churchill Blvd. to Ford Dr. interchange, QEW interchange, Peel","Culvert rehabilitation, Bridge rehabilitation, Resurfacing","Planned","Not available",null,"0","$25 to $100 million","Design upcoming","To be determined"],
    [297,"Rehab","2027-2028","Central","410","Queen St. to Bovaird Dr., Brampton","Resurfacing","Planned","Not available",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [298,"Rehab","2027-2028","Central","401, Not applicable","Bloor St., Oshawa","Bridge replacement","Planned","Not available",null,"0","$100 to $250 million","Design underway","To be determined"],
    [299,"Rehab","2027-2028","Central","7","Main St. north intersection,  Acton","Intersection improvements","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [300,"Rehab","2027-2028","Central","400","Bayfield St. underpass, Barrie","Bridge replacement","Planned","Not available",null,"0","$25 to $100 million","Design underway","To be determined"],
    [301,"Rehab","2027-2028","Central","11","Grouse Creek, Oro-Medonte","Culvert replacement","Planned","2027-2028",null,"0","$10 to $25 million","Design underway","To be determined"],
    [302,"Rehab","2027-2028","Central","To be assigned","East Main Tunnel, Welland","Tunnel rehabilitation","Planned","Not available",null,"0","$10 to $25 million","Design underway","To be determined"],
    [303,"Rehab","2027-2028","Central","403","QEW/403/407 interchange Guelph Rd. to Hwy 6, Burlington","Resurfacing","Planned","2027-2028","2024-2017","26.9","$25 to $100 million","Design underway","To be determined"],
    [304,"Rehab","2027-2028","Central","QEW","Mountain Rd. underpass, Niagara Falls","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [305,"Rehab","2027-2028","Central","420","Dorchester Rd., underpass, Niagara","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [306,"Rehab","2027-2028","Central","QEW","Hurontario St. to Cawthra Rd., Mississauga","Resurfacing, Bridge rehabilitation","Planned","2027-2028",null,"3.2","$25 to $100 million","Design upcoming","To be determined"],
    [307,"Rehab","2027-2028","Central","11","County Rd. 93 to Memorial Ave., Oro-Medonte, Orillia","Culvert rehabilitation, Resurfacing","Planned","2027-2028",null,"23.6","$25 to $100 million","Design upcoming","To be determined"],
    [308,"Rehab","2027-2028","Central","12","Gamebridge-Durham Rd. 50 to Orillia east limits and Memorial Ave., Ramara, Orillia","Culvert rehabilitation, Resurfacing","Planned","2027-2028",null,"25.8","$10 to $25 million","Design upcoming","To be determined"],
    [309,"Rehab","2027-2028","Central","401","Kipling Ave. to Hwy 400 eastbound collector lanes,  CPR overpass, Toronto","Resurfacing, Bridge rehabilitation","Planned","Not available",null,"4.1","$10 to $25 million","Design upcoming","To be determined"],
    [310,"Rehab","2027-2028","Central","27, 401","Renforth Dr. to Hwy 427, Toronto","Culvert rehabilitation, Bridge rehabilitation, Resurfacing","Planned","2027-2028",null,"1.8","$25 to $100 million","Design upcoming","To be determined"],
    [311,"Rehab","2027-2028","Central","427","QEW to Hwy 401, northbound and southbound express lanes, Toronto","Resurfacing","Planned","Not available",null,"7.3","$25 to $100 million","Design upcoming","To be determined"],
    [312,"Rehab","2027-2028","Central","400A","Hwy 400/11 interchange to Hwy 11/93 interchange, Hwy 93 overpass, Oro-Medonte","Bridge replacement, Resurfacing","Planned","Not available",null,"1.1","$25 to $100 million","Design underway","To be determined"],
    [313,"Rehab","2027-2028","Central","401","Eastbound express lanes Avenue Rd. to Warden Ave., Leslie St./Bayview Ave. interchanges., Phase 3, Toronto","Realignment, Interchange improvements, Bridge replacement, Bridge rehabilitation","Planned","Not available",null,"10.4","$100 to $250 million","Design underway","To be determined"],
    [314,"Rehab","2027-2028","North, East","11","South Kahshe Lake Rd. to Muskoka Rd. 169, Kilworthy","Resurfacing","Planned","Not available",null,"8.6","$25 to $100 million","Design underway","To be determined"],
    [315,"Rehab","2027-2028","North, East","11","Severn River Bridge, Severn Bridge","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [316,"Rehab","2027-2028","North, East","11","1.9 km north of Hwy 60, northerly 10.7 km, Huntsville","Resurfacing","Planned","2027-2028",null,"4.6","$10 to $25 million","Design upcoming","To be determined"],
    [317,"Rehab","2027-2028","North, East","118, 35","Unnamed culvert, 3.2 km west of Hwy 35 and Hwy 35 culvert 0.5 km south of Hwy 118, Carnarvan","Culvert replacement","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [318,"Rehab","2027-2028","North, East","400","Musquash River Bridge to north of Muskoka Rd. 12 interchange, north of Crooked Bay","Resurfacing","Planned","2027-2028",null,"7.7","$10 to $25 million","Design underway","To be determined"],
    [319,"Rehab","2027-2028","North, East","400","Muskoka Rd. 34/48 interchange and Muskoka Rd. 33 interchange, south and north of Crooked Bay","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [320,"Rehab","2027-2028","North, East","35, 60","Muskoka Rd. 117 to Hwy 60, Boyne Creek Culvert #3, Ballantyne Creek Culvert and Coopers Creek Culvert, Dwight","Culvert replacement, Resurfacing","Planned","2027-2028",null,"17.7","$10 to $25 million","Design upcoming","To be determined"],
    [321,"Rehab","2027-2028","Eastern","401","County Rd. 33 to east of Northumberland Rd., City of Quinte West","Resurfacing","Planned","2027-2028",null,"12.3","$10 to $25 million","Design upcoming","To be determined"],
    [322,"Rehab","2027-2028","Eastern","28","Peterborough County Rd. 504, Burleigh St. to Glacial Till Trail, County of Peterborough","Resurfacing","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [323,"Rehab","2027-2028","Eastern","401","County Rd. 38 to Camden East Rd., County of Lennox and Addington","Resurfacing","Planned","2027-2028",null,"13.6","$10 to $25 million","Design upcoming","To be determined"],
    [324,"Rehab","2027-2028","Eastern","35","Durham Regional Rd. 20 to south junction, and junction with Hwy 7A, Regional Municipality of Durham","Resurfacing","Planned","2027-2028",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [325,"Rehab","2027-2028","Eastern","401","Montreal St. to Sydenham Rd., Kingston","Resurfacing","Planned","2027-2028",null,"6","$0 to $10 million","Design upcoming","To be determined"],
    [326,"Rehab","2027-2028","Eastern","115","Regional boundary to Hwy 7 junction interchange,  County of Peterborough","Resurfacing","Planned","2027-2028",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [327,"Rehab","2027-2028","Eastern","417","Campbell Dr. to Scheel Dr., County of Rentrew","Resurfacing","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [328,"Rehab","2027-2028","Eastern","417","Prescott and Russell County Rd. 17 to Dunvegan Rd., United Counties of Prescott and Russell","Resurfacing","Planned","2027-2028",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [329,"Rehab","2027-2028","Eastern","401","Camden East Rd. to Wyman Rd. underpass, County of Hastings","Resurfacing","Planned","Not available",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [330,"Rehab","2027-2028","Eastern","401","Nash Creek, United Counties of Stormont, Dundas and Glengarry","Bridge replacement","Planned","Not available",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [331,"Rehab","2027-2028","Eastern","138","Hwy 401 to Hwy 417, United Counties of Stormont, Dundas and Glengarry","Centre turn lane, Passing lane","Planned","2027-2028",null,"0","$10 to $25 million","Design in procurement","To be determined"],
    [332,"Rehab","2027-2028","Eastern","132","Stone Rd., 3.9 km east to Riverview Dr., County of Renfrew","Culvert replacement, Resurfacing, Culvert rehabilitation","Planned","2027-2028",null,"3.9","$10 to $25 million","Design upcoming","To be determined"],
    [333,"Rehab","2027-2028","Eastern","60","Renfrew Rd. to 0.4 km south of Dillabough Rd., County of Renfrew","Resurfacing","Planned","Not available",null,"21.1","$10 to $25 million","Design upcoming","To be determined"],
    [334,"Rehab","2027-2028","Eastern","15","Morton Creek Bridge, United Counties of Leeds and Grenville","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [335,"Rehab","2027-2028","Eastern","7","Drummond Line Rd. to Lansdowne St., County of Peterborough","Resurfacing","Planned","2027-2028",null,"3","$0 to $10 million","Design upcoming","To be determined"],
    [336,"Rehab","2027-2028","Eastern","17","CPR overhead, County of Renfrew","Culvert rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [337,"Rehab","2027-2028","Eastern","416","County Rd. 44 to Vanburen St., United Counties of Leeds and Grenville","Bridge rehabilitation","Planned","Not available",null,"5","$0 to $10 million","Design in procurement","To be determined"],
    [338,"Rehab","2027-2028","Eastern","416","Rideau River Rd. to Dilworth Rd., Ottawa","Bridge rehabilitation","Planned","Not available",null,"6","$10 to $25 million","Design in procurement","To be determined"],
    [339,"Rehab","2027-2028","Eastern","118","Hwy 28 to Hadlington Rd., County of Haliburton","Culvert rehabilitation","Planned","2027-2028","2026-4001","0","$0 to $10 million","Design underway","To be determined"],
    [340,"Rehab","2027-2028","Eastern","115","Cavanville Creek, County of Peterborough","Bridge rehabilitation","Planned","Not available",null,"0","$0 to $10 million","Planning/environmental assessment underway","To be determined"],
    [341,"Rehab","2027-2028","Eastern","417","Holland Ave. Bridge, Parkdale Ave. Bridge, Fairmont Ave. Bridge, Bayswater overpass, City of Ottawa","Bridge rehabilitation","Planned","2027-2028",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [342,"Rehab","2027-2028","Eastern","417","East of Walkley Rd. to east of Hunt Club Rd., Ottawa","Bridge replacement","Planned","Not available",null,"0","$25 to $100 million","Design underway","To be determined"],
    [343,"Rehab","2027-2028","Eastern","17","Bissett Creek Bridge, County of Renfrew","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [344,"Rehab","2027-2028","Eastern","7","Belmont 2nd Line to Sama Park Rd., Peterborough","Intersection improvements","Planned","2027-2028",null,"0.5","$0 to $10 million","Design underway","To be determined"],
    [345,"Rehab","2027-2028","Eastern","7","Belmont 6th Line Rd., Havelock","Intersection improvements","Planned","2027-2028",null,"0.5","$0 to $10 million","Design underway","To be determined"],
    [346,"Rehab","2027-2028","Eastern","417","Rockdale Rd. underpass, Ottawa","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design underway","To be determined"],
    [347,"Rehab","2027-2028","Eastern","401","County Rd. 4, 0.6 km south of Hwy 401, County of Lennox and Addington","Building, Patrol yard","Planned","Not available",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [348,"Rehab","2027-2028","Eastern","401","1.0 km east of Marysville Rd., Belleville Rd., County of Hastings","Patrol yard, Building","Planned","Not available",null,"0","$0 to $10 million","Design underway","To be determined"],
    [349,"Rehab","2027-2028","Eastern","41","Madawaska River, Griffith Bridge, County of Renfrew","Bridge replacement","Planned","Not available",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [350,"Rehab","2027-2028","Eastern","417","Dunvegan to Hwy 17, United Counties of Stormont, Dundas and Glengarry, and United Counties of Prescott and Russell","Resurfacing","Planned","2027-2028","2025-4016","34.6","$10 to $25 million","Design underway","To be determined"],
    [351,"Rehab","2027-2028","Eastern","62","Hwy 62 and Prince Edward County Rd. 1, Prince Edward County","Intersection improvements","Planned","2027-2028",null,"0","$0 to $10 million","Design in procurement","To be determined"],
    [352,"Rehab","2027-2028","Eastern","7","Hwy 15 to McNeely Ave., Carleton Place, County of Lanark","Intersection improvements, Resurfacing","Planned","2027-2028","2024-4013","1.6","$25 to $100 million","Design underway","To be determined"],
    [353,"Rehab","2027-2028","Eastern","401","Power Dam Interchange 786, United Counties of Stormont, Dundas and Glengarry","Bridge replacement","Planned","Not available",null,"0","$25 to $100 million","Planning/environmental assessment underway","To be determined"],
    [354,"Rehab","2027-2028","Eastern","7","Hwy 35 to Slanted Rd. and CPR overhead, Kawartha Lakes","Bridge replacement, Resurfacing, Intersection improvements","Planned","2027-2028","2025-4013","5.6","$10 to $25 million","Design underway","To be determined"],
    [355,"Rehab","2027-2028","Eastern","401","Wyman Rd. to Hwy 37,   County of Hastings","Resurfacing","Planned","2027-2028",null,"17.5","$10 to $25 million","Design upcoming","To be determined"],
    [356,"Rehab","2027-2028","Eastern","62","Bannockburn Rd. to Cleveland Rd., County of Hastings","Resurfacing","Planned","2026",null,"15.6","$0 to $10 million","Design underway","To be determined"],
    [357,"Rehab","2027-2028","Eastern","417","Hwy 416/417  to Eagleson Rd., Ottawa","Resurfacing","Planned","2027-2028","2025-4010","4.5","$0 to $10 million","Design underway","To be determined"],
    [358,"Rehab","2027-2028","Eastern","7A","Hwy 115 to Bethany Longfield Dr., County of Peterborough","Resurfacing","Planned","2027-2028",null,"10.9","$0 to $10 million","Design upcoming","To be determined"],
    [359,"Rehab","2027-2028","Eastern","17","Renfrew Rd. 24, Whitewater Rd. to Renfrew Rd. 26, County of Renfrew","Resurfacing","Planned","2027-2028",null,"35.9","$10 to $25 million","Design upcoming","To be determined"],
    [360,"Rehab","2027-2028","Eastern","118","County Rd. 648, County of Haliburton","Resurfacing","Planned","2027-2028",null,"11.6","$0 to $10 million","Design upcoming","To be determined"],
    [361,"Rehab","2027-2028","Eastern","416","Regional Rd. 6 underpass and Mud Creek Bridge, Carlton","Bridge rehabilitation","Planned","2027-2028",null,"5.3","$0 to $10 million","Design in procurement","To be determined"],
    [362,"Rehab","2027-2028","Eastern","416","County Rd. 21 underpass, United Counties of Leeds and Grenville","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design in procurement","To be determined"],
    [363,"Rehab","2027-2028","Eastern","416, 417","Hwy 416/417 interchanges and Log Farm Rd., Ottawa","Bridge rehabilitation","Planned","Not available","2026-4015","0","$10 to $25 million","Design underway","To be determined"],
    [364,"Rehab","2027-2028","Eastern","15","Hwy 401 to Joyceville Rd., Kingston","Resurfacing","Planned","2027-2028","2024-4054","9.1","$0 to $10 million","Design underway","To be determined"],
    [365,"Rehab","2027-2028","Eastern","416","County Rd. 43 underpass, Ottawa","Bridge rehabilitation","Planned","2027-2028",null,"0","$0 to $10 million","Design in procurement","To be determined"],
    [366,"Rehab","2027-2028","Eastern","7","Airport Rd. to Lansdowne St., Pkwy interchange and Bensfort Rd., Peterborough","Bridge rehabilitation, Resurfacing","Planned","Not available",null,"4.5","$10 to $25 million","Design in procurement","To be determined"],
    [367,"Rehab","2027-2028","Eastern","401","Palace Rd., County of Lennox and Addington","Bridge replacement, Interchange improvements","Planned","Not available",null,"4","$25 to $100 million","Design underway","To be determined"],
    [368,"Rehab","2027-2028","Eastern","34","Hawkesbury Creek and CNR bridge, United Counties of Prescott and Russell","Bridge replacement","Planned","Not available","2021-4091","0","$25 to $100 million","Design upcoming","To be determined"],
    [369,"Rehab","2027-2028","Eastern","401","Nudell Bush Rd., west of Ingleside, United Counties of Stormont, Dundas and Glengarry","Bridge replacement","Planned","2027-2028","2024-4017","0","$0 to $10 million","Design underway","To be determined"],
    [370,"Rehab","2027-2028","Eastern","7","Paul's Rd. to Carleton Place, County of Lanark","Resurfacing, Culvert replacement, Culvert rehabilitation","Planned","2027-2028","2024-4018","19.1","$10 to $25 million","Design underway","To be determined"],
    [371,"Rehab","2027-2028","Eastern","7","Glen Tay Rd. to Lanark Rd., County of Lanark","Reconstruction","Planned","Not available",null,"4.4","$10 to $25 million","Design underway","To be determined"]
]}