<data>
<row _id="1"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>North of the north junction of Hwy 529, northerly, Britt</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>20.4</Project Length (kilometers)><Estimated Cost Range>$250 to $500 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="2"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>Patrol yard on Hwy 529 interchange, Pointe Au Baril</Location><Type Of Work>New facility</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="3"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>Hwy 69 connection to Sudbury Southeast Bypass, Sudbury</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>6.2</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="4"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>South junction of Hwy 529 northerly, Pointe au Baril</Location><Type Of Work>Two to four-lane widening, New bridge, New culvert</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>15</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="5"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>South of Hwy 7182 (Shebeshegong Rd.), northerly, Shawanaga</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>5</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="6"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>South of north junction of Hwy 529 northerly, Pointe au Baril</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>7.5</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="7"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>652</Highway><Location>Cochrane Bypass, extension of Hwy 652, Genier Rd. to Hwy 11, Cochrane</Location><Type Of Work>New two-lane highway</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>4.5</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="8"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>North of Hwy 559, northerly, Nobel</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>12.2</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="9"><Program Type>Expansion</Program Type><Start Year>Upcoming Expansion</Start Year><Region>North, East</Region><Highway>69</Highway><Location>North Hwy 7182 (Shebeshegong Rd.), northerly, Pointe au Baril</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>11</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="10"><Program Type>Expansion</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11, 17</Highway><Location>McGuire Rd. westerly to Coughlin Rd. including Black Sturgeon River Bridges, Red Rock</Location><Type Of Work>Two to four-lane widening, New bridge, Bridge removal, Illumination</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2029</Target Completion><Contract #>2024-6011</Contract #><Project Length (kilometers)>5</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="11"><Program Type>Expansion</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11, 17</Highway><Location>Pearl Lake easterly to west of CPKC overhead at Ouimet, Shuniah</Location><Type Of Work>Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>7.6</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="12"><Program Type>Expansion</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>West of Hwy 673 easterly including Moth Lake culverts, west of Kenora</Location><Type Of Work>Two to four-lane widening, New culvert, Illumination</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract #>2024-6013</Contract #><Project Length (kilometers)>11</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="13"><Program Type>Expansion</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11, 17</Highway><Location>East of junction Hwy 582 westerly to Dorion East Loop Rd. including Coldwater Creek and Wolf River Bridges, Dorion</Location><Type Of Work>New bridge, Two to four-lane widening</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>12.1</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="14"><Program Type>Rehab</Program Type><Start Year>2023</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Thessalon to Iron Bridge</Location><Type Of Work>Culvert replacement, Resurfacing, Intersection improvements, Culvert rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2023-5001</Contract #><Project Length (kilometers)>33.3</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Build</Delivery Method></row>
<row _id="15"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Birches Rd. overpasses and CNR overheads, south of North Bay</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-5012</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="16"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, East</Region><Highway>11</Highway><Location>ONR overhead, Earlton</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-5009</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="17"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, East</Region><Highway>101</Highway><Location>Mattawasaga River Bridge and Ghost River Bridge, east of Matheson</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-5007</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="18"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Kapuskasing easterly to west of Fauquier</Location><Type Of Work>Resurfacing, Culvert rehabilitation, Paved shoulders</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2023-5095</Contract #><Project Length (kilometers)>24.8</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="19"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, East</Region><Highway>592</Highway><Location>Little East River Bridge, north of Hwy 11, Novar</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-5014</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="20"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Earlton Fire Memorial Rest Area</Location><Type Of Work>Rest area</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-5007</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="21"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>To be assigned</Highway><Location>Spanish River Bridge, Massey</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-5075</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="22"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>69</Highway><Location>3.2 km south of Hwy 637 to 2.3 km south of Nelson Rd., Sudbury</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-5013</Contract #><Project Length (kilometers)>12.5</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="23"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>64</Highway><Location>Holdridge Creek Bridge, Martin River</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-5006</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="24"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>17, 17B</Highway><Location>Garden River to Echo Bay</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2023-5007</Contract #><Project Length (kilometers)>18</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="25"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Sault Ste. Marie to Heyden</Location><Type Of Work>Culvert rehabilitation, Resurfacing, Paved shoulders, Safety improvements</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-5114</Contract #><Project Length (kilometers)>14.5</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="26"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>69</Highway><Location>Hwy 400 northerly to north of Hwy 7182, Shawanaga southerly</Location><Type Of Work>Bridge rehabilitation, Resurfacing, Intersection improvements</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-5014</Contract #><Project Length (kilometers)>19.6</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="27"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Hwy 69 overpass, eastbound and westbound lanes, Sudbury</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-5010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="28"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, East</Region><Highway>546</Highway><Location>Kindiogami River Bridge, Camp 8 Creek Bridge, Skunk Creek Bailey Bridge, Little White River Bridge, north of Elliot Lake</Location><Type Of Work>Bridge rehabilitation, Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-5024</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="29"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>101</Highway><Location>0.3 km west of Lawson Lake Culvert to 2.2 km west of Hwy 651, Chapleau</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-5013</Contract #><Project Length (kilometers)>38.6</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="30"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>17</Highway><Location>East Baldhead Bridge and West Baldhead Bridge, south of Wawa</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5017</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="31"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>144</Highway><Location>22.8 km north of Hwy 661 to Kenogamissi Falls Rd., north of Gogama</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-5048</Contract #><Project Length (kilometers)>20.5</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="32"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>101</Highway><Location>3.1 km east of former ONR crossing to 0.2 km west of Kidd Met Site Rd., Timmins</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5064</Contract #><Project Length (kilometers)>6.6</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="33"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>67</Highway><Location>Main St. to end of highway, Iroquois Falls</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-5020</Contract #><Project Length (kilometers)>0.7</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="34"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>11</Highway><Location>9.6 km south of Hwy 534 northerly 4.6 km, Trout Creek</Location><Type Of Work>Bridge rehabilitation, Resurfacing, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-5011</Contract #><Project Length (kilometers)>4.6</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="35"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>592</Highway><Location>Little East River Bridges 2, 3 and 4 north of Hwy 11, Novar</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-5141</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="36"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Jacobs Hill Rd. northerly 20.5 km, Nellie Lake</Location><Type Of Work>Culvert replacement, Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5015</Contract #><Project Length (kilometers)>20.5</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="37"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>17, 548</Highway><Location>Stobie Creek Bridge, Richardson Creek Bridge and Walker Creek Culvert, Richards Landing</Location><Type Of Work>Bridge replacement, Culvert rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2028</Target Completion><Contract #>2026-5018</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="38"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>17</Highway><Location>1 km east of Hwy 548 westerly 16.5 km, Echo Bay</Location><Type Of Work>Resurfacing, Bridge rehabilitation, Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2028</Target Completion><Contract #>2026-5019</Contract #><Project Length (kilometers)>16.5</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="39"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>559</Highway><Location>Hwy 400 westerly to end of hwy, north of Nobel</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2024-5020</Contract #><Project Length (kilometers)>17.4</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="40"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Laronde Creek Bridge to Sturgeon Falls east limits</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-5038</Contract #><Project Length (kilometers)>15.2</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="41"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>652</Highway><Location>Lawagamau River Bridge, Floodwood River Bridge and Little Abitibi River Bridge, north of Cochrane</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5001</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="42"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>575, 64</Highway><Location>Sturgeon Falls to Field</Location><Type Of Work>Resurfacing, Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2028</Target Completion><Contract #>2026-5009</Contract #><Project Length (kilometers)>22.1</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="43"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>124, 520</Highway><Location>Whitestone Lake Bridge at Dunchurch and Whitestone River Bridge at Whitestone</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-5012</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="44"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>101</Highway><Location>Hwy 547 westerly 9 km, Wawa</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2023-5096</Contract #><Project Length (kilometers)>9</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="45"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>101</Highway><Location>Hwy 144 easterly to Government Rd., Timmins westerly</Location><Type Of Work>Resurfacing, Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5008</Contract #><Project Length (kilometers)>16.1</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="46"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, East</Region><Highway>17</Highway><Location>10.2 km east of Hwy 108, easterly 22 km, Spanish</Location><Type Of Work>Resurfacing, Culvert replacement, Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-5022</Contract #><Project Length (kilometers)>22</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="47"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, West</Region><Highway>72</Highway><Location>Hwy 17 northerly to 3 km north of Kathlyn Lake Rd., south of Sioux Lookout</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-6001</Contract #><Project Length (kilometers)>35.5</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="48"><Program Type>Rehab</Program Type><Start Year>2024</Start Year><Region>North, West</Region><Highway>11, 17</Highway><Location>Polemounted variable message signs, various locations (15), Nipigon to Fort Frances, Dryden to Kenora</Location><Type Of Work>Signage rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2023-6067</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="49"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>11, 61</Highway><Location>Various intersections and locations, east of Balsam St. southerly to Harbour Expressway and Hwy 61 southerly, Thunder Bay</Location><Type Of Work>Resurfacing, Intersection improvements</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2023-6007</Contract #><Project Length (kilometers)>15.7</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="50"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>584</Highway><Location>Various locations (14), 27 km north of Hwy 11, northerly 11 km, Greenstone</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6016</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Single Source</Delivery Method></row>
<row _id="51"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>602</Highway><Location>Lyon Creek Culvert No 1, 1.0 km south of Hwy 11, Emo</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2023-6036</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="52"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>17</Highway><Location>New rest area building, Terrace Bay</Location><Type Of Work>New facility</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-6021</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="53"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>582, 589, 591</Highway><Location>Hwy 591, from Hwy 589 to end of Hwy and Hwy 589, from Goodman Lake Rd. to Two Islands Lake Rd., north of Thunder Bay</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6058</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="54"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>17, 614, 627</Highway><Location>Various locations between Nipigon and White River</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6032</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Single Source</Delivery Method></row>
<row _id="55"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>17, 614</Highway><Location>Various locations between Nipigon and White River</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6033</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Single Source</Delivery Method></row>
<row _id="56"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>61</Highway><Location>Pigeon River Bridge at Canada/USA International Border, Neebing</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-6015</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="57"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Angle Creek and Partridge Lake Culverts, 7 km east of Hwy 580 and 32 km west of Hwy 584, Greenstone</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6022</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="58"><Program Type>Rehab</Program Type><Start Year>2025</Start Year><Region>North, West</Region><Highway>17</Highway><Location>8 km west of Schreiber westerly including Hewitson Creek Culvert</Location><Type Of Work>Culvert replacement, Realignment</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6024</Contract #><Project Length (kilometers)>3.8</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="59"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>622</Highway><Location>Seine River Bridge, 21 km north of Hwy 11B, north of Atikokan</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6002</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="60"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>17</Highway><Location>West of Schreiber and Terrace Bay municipality limit</Location><Type Of Work>Hazard rock removal</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-6045</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="61"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>61</Highway><Location>Slate River Tributary Culvert, 2.0 km south of Hwy 130, Neebing</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6065</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="62"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>527, 582</Highway><Location>Hwy 527 from Kopka River Bridge northerly and Hwy 582 from Hwy 11/17 west junction easterly, north of Shuniah,  east of Dorion</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6031</Contract #><Project Length (kilometers)>43.9</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="63"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>671</Highway><Location>24 km north of Hwy 17A northerly, north of Kenora</Location><Type Of Work>Safety improvements, Guide rail improvements, Realignment</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6054</Contract #><Project Length (kilometers)>1.5</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="64"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>17</Highway><Location>East of Hwy 631 westerly, White River</Location><Type Of Work>Resurfacing, Paved Shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-6003</Contract #><Project Length (kilometers)>52.3</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="65"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>130</Highway><Location>Twin City Cross Rd. and Arthur St. intersection, Oliver Paipoonge</Location><Type Of Work>Intersection improvements</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2023-6019</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="66"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Windy Point Bridge, 11 km west of Hwy 502, east of Fort Frances</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-6033</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="67"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Schreiber to Terrace Bay</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-6020</Contract #><Project Length (kilometers)>16.2</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="68"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Nipigon River Bridge at Nipigon</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-6014</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="69"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Millers Creek Culvert, 9 km west of Hwy 621, Rainy River</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2026-6061</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="70"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Wild Goose Creek and Blind Creek Culverts - eastbound lane, 6 and 7 km east of Hwy 527, Shuniah</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="71"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>599</Highway><Location>Medcalf Lake Narrows Bridge, 85 km north of Hwy 516, south of Pickle Lake</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2025-6009</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="72"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>61</Highway><Location>Slate River Bridges, 1.0 and 7.0 km north of Hwy 608, Oliver Paipoonge, Neebing</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2023-6010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="73"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>17</Highway><Location>CPKC overhead at Martin, 9 km west of English River, east of Ignace</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6011</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="74"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>17</Highway><Location>CPKC overhead, Terrace Bay</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2022-6010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="75"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>17</Highway><Location>McKellar and Ripple Creek Culverts, 36 and 38 km west of Marathon</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2026</Target Completion><Contract #>2024-6004</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="76"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>664, 72</Highway><Location>36 km north of Hwy 17 northerly to Sioux Lookout including Ariano Bypass and Hwy 664 westerly to Hudson, Sioux Lookout</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2024-6005</Contract #><Project Length (kilometers)>49.3</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="77"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>502</Highway><Location>47 km north of Hwy 11 northerly, east of Fort Frances</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6008</Contract #><Project Length (kilometers)>19</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="78"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>Not applicable</Highway><Location>Fort Severn Modular Bridge, Fort Severn Remote Northern Airport</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2024-6008</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="79"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11, 17, 628</Highway><Location>Hwy 628 from Hwy 11/17 easterly, Red Rock, Hwy 11/17 from 2.0 km west of Hwy 11 westerly, Nipigon and Hwy 17 from 48 km east of Hwy 11 easterly, west of Schreiber</Location><Type Of Work>Resurfacing, Paved shoulders, Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6012</Contract #><Project Length (kilometers)>10.5</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="80"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>102</Highway><Location>CPKC Kaministiquia and CNR overheads, 4 km east of Hwy 17 at Sistonen's Corners, west of Oliver-Paipoonge</Location><Type Of Work>Bridge rehabilitation, Bridge removal</Type Of Work><Highway Program Status>Underway</Highway Program Status><Target Completion>2028</Target Completion><Contract #>2024-6017</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="81"><Program Type>Rehab</Program Type><Start Year>2026</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Oliver Rd., Kakabeka to Hwy 11, Shabaqua, Oliver Paipoonge, Conmee, west of Conmee</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-6021</Contract #><Project Length (kilometers)>38.2</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="82"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>553, 810</Highway><Location>River aux Sables Bridges, Cameron Creek Bridge, north of Hwy 17, north of Massey</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2023-5009</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="83"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>West junction Municipal Rd. 55, west of Sudbury</Location><Type Of Work>Intersection improvements</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2022-5036</Contract #><Project Length (kilometers)>0.1</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="84"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Rest area at Hwy 11, Marten River</Location><Type Of Work>New facility</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2023-5010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="85"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>560</Highway><Location>West of west junction of Hwy 65, west of Elk Lake</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2022-5009</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="86"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Straight Creek Culvert, south of Latchford</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2024-5002</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="87"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>69</Highway><Location>Richard Lake Creek, Sudbury</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="88"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>522</Highway><Location>Commanda Creek Bridge, Commanda</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="89"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>11, 65</Highway><Location>Hwy 11, Hwy 11B to Roland Rd., south of New Liskeard northerly and Hwy 65, Armstrong St. northerly to north junction Hwy 11/65 at New Liskeard</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>18.9</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="90"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>655</Highway><Location>Algonquin Blvd. to 11.3 km north of Hwy 101, Timmins</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>11.3</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="91"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>101, 17</Highway><Location>0.1 km east of Watsons Skyways Rd. to 9 km west of Hwy 547,  Catfish Creek Culvert #2 and Wawa Lake Culvert, Wawa</Location><Type Of Work>Resurfacing, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2027-5002</Contract #><Project Length (kilometers)>9</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="92"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>65</Highway><Location>Elk Lake northerly 18.5 km</Location><Type Of Work>Resurfacing, Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-5003</Contract #><Project Length (kilometers)>18.5</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="93"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Montreal River Bridge, Montreal River</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract #>2025-5005</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Build</Delivery Method></row>
<row _id="94"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>0.7 km north of Frater Rd. northerly 25.3 km, Montreal River</Location><Type Of Work>Resurfacing, Culvert replacement, Paved shoulders, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>25.3</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="95"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Everett Lake Tributary Culvert, Iron Bridge</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5012</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="96"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>To be assigned</Highway><Location>Root River #1 Culvert and Root River #2 Culvert, Sault Ste. Marie</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-5072</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="97"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>638</Highway><Location>Bar River Bridge #1, Bar River Bridge #2 and Bar River Bridge #3, Echo Bay</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="98"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Depew River Bridge, Chain Lake Culvert, CPR overhead, South White River and South White River Bridge, south of White River</Location><Type Of Work>Bridge replacement, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract #>2026-5070</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="99"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Spanish River Bridge, 8.2 km east of Hwy 6, east of McKerrow</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="100"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>White River Rest Area</Location><Type Of Work>Rest area</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="101"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Fern Glen Rd. underpass, 4.2 km south of Hwy 518, Emsdale</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-5001</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="102"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Wawa Truck Rest Area</Location><Type Of Work>Rest area</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="103"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>144</Highway><Location>North of Hwy 661 northerly, north of Gogama</Location><Type Of Work>Resurfacing, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-5071</Contract #><Project Length (kilometers)>28.1</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="104"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>60</Highway><Location>Opeongo River Bridge, Madawaska River Bridge and Poverty Creek Culvert, Madawaska</Location><Type Of Work>Bridge replacement, Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="105"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>South of Hwy 101 southerly, including the Old Woman River Bridge, south of Wawa</Location><Type Of Work>Resurfacing, Bridge rehabilitation, Paved shoulders, Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>21.6</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="106"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>17</Highway><Location>West of Markstay easterly to Hagar</Location><Type Of Work>Resurfacing, Paved shoulders, Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-5016</Contract #><Project Length (kilometers)>20.4</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="107"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>579</Highway><Location>Clute Creek Culverts, north of Cochrane</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2024-5019</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="108"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>11</Highway><Location>0.1 km south of Lakeshore Dr. northerly 0.7 km, Temagami</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-5021</Contract #><Project Length (kilometers)>0.7</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="109"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>519</Highway><Location>Magpie River Bridge, Dubreuilville</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="110"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>144</Highway><Location>10.2 km south of Hwy 560 to 9.9 km north of Hwy 560, Westree</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>20.1</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="111"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, East</Region><Highway>129</Highway><Location>Mississagi River Bridge, Wharncliffe</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="112"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>CNR Rainy Lake overhead, 2 km east of Hwy 502, east of Fort Frances</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2023-6016</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="113"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Boom Creek Culvert, 14.0 km north of Hwy 17, north of Nipigon</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6022</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="114"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17, 17A, 525, 596, 641, 658, 671, To be assigned</Highway><Location>Various locations, Hwy 17, 17A, 71, 525, 596, 641, 658, 671 and 7059, Kenora, east/west/north of Kenora, north of Sioux Narrows-Nestor Falls</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6023</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="115"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11, 502, 601, 605, 665</Highway><Location>Various locations, Hwy 11, 17, 502, 594, 601, 665 and 605, Machin, east/west/south of Dryden, east of Fort Frances</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6018</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="116"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>105, 17, 594</Highway><Location>Various locations, Hwy 105, 125, 609, 618, 657, 647, and 804, Machin, north of Machin, Ear Falls, west/north/south of Earfalls, Red Lake</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6019</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="117"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11, 600, 602, 611, 613, 615, 617, 619, 621, 71</Highway><Location>Various locations, Hwy 11, 71, 600, 602, 611, 613, 615, 617, 619 and 621, Sioux Narrows-Nestor Falls, Lake of the Woods, Dawson, Morley, Chapple, Emo, La Vallee, Alberton</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6020</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="118"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>13 km west of Hwy 11 at Shabaqua Corners westerly, west of Conmee</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2027-6002</Contract #><Project Length (kilometers)>26.4</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="119"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>642</Highway><Location>Hwy 72 and 516 Junction easterly to Sturgeon River Bridge, Sioux Lookout</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6032</Contract #><Project Length (kilometers)>9.9</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="120"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17, 71</Highway><Location>West limit of Kenora westerly to Hwy 17A west connection, and 11.0 km east of Hwy 71 westerly to east limit of Kenora including Hwy 71 junction</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6001</Contract #><Project Length (kilometers)>26</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="121"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Coldwater Creek Bridge, 6 km west of south junction Hwy 582, Dorion</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="122"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>619</Highway><Location>Pinewood River Bridge, 2 km north of Hwy 11, Dawson</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2024-6014</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="123"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>588</Highway><Location>Silver Creek Culvert, 10 km south of Hwy 11/17, O'Connor</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6027</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="124"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Revell River No. 3 Bridge, 1 km east of Hwy 622, west of Ignace</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6002</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="125"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>6.0 km east of Hwy 102 easterly, Thunder Bay, Shuniah</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6003</Contract #><Project Length (kilometers)>29.3</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="126"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Crocker Lake East Culvert, 8 km west of Hwy 631, west of White River</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6003</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="127"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>597</Highway><Location>Moores Creek Modular Bridge, 9 km south of Hwy 608, Neebing</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6004</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="128"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Bullrush Lake Culvert, 30 km north of Hwy 17, south of Greenstone</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6005</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="129"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>808</Highway><Location>Pineimuta River Modular Bridge, 141 km north of Hwy 599, Central Patricia</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6007</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="130"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Oskondaga River Bridge, east of Hwy 11/17 west junction at Shabaqua Corners, west of Conmee</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6008</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="131"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Gulliver River Bridge, 10 km east of Hwy 599, east of Ignace</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6009</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="132"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Beaver Creek Bridge, 9 km west of Hwy 605, Machin</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6011</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="133"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>105</Highway><Location>English River Bridge, Ear Falls and Perrault Falls Culvert, south of Ear Falls</Location><Type Of Work>Bridge rehabilitation, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2024-6003</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="134"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>2 km west of Hwy 614 westerly, east of Marathon</Location><Type Of Work>Reconstruction, Paved shoulders, Hazard rock removal, Safety improvements</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6006</Contract #><Project Length (kilometers)>20.8</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="135"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>125</Highway><Location>Hwy 105 northerly to north limit of Cochenour, Red Lake</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>13.6</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="136"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Melgund Creek, Osaquan River, Shoshowae Creek East and Sisson Creek Culverts, west of Hwy 603, 11 km west of Hwy 599, 8 km west of Hwy 665 and 66 km east of Hwy 599, east and west of Ignace</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6015</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="137"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>502</Highway><Location>Marguerite St. Bridge, west of Hwy 17, Dryden</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6006</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="138"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>502</Highway><Location>Rattlesnake Creek Culvert, 56 km south of Hwy 594, south of Dryden</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6001</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="139"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>811</Highway><Location>Gull River Culverts, 17 km west of Hwy 527, north of Thunder Bay</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6023</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="140"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>588</Highway><Location>2 km south of Hwy 11/17 westerly, Oliver Paipoonge, O'Connor, Gillies</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2026-6021</Contract #><Project Length (kilometers)>13.4</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="141"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Rest Creek Culvert, 24 km west of Raith, west of Conmee</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="142"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Corbett Creek Culverts and McIntyre Creek Drainage Culverts,  5.0 km west of Hwy 130 and 1.0 km west of Hwy 102, Thunder Bay, Oliver Paipoonge</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6008</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="143"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Little Pic River Bridge westerly, west of Marathon</Location><Type Of Work>Realignment, Truck climbing lane, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2027-6009</Contract #><Project Length (kilometers)>4.5</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="144"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17A</Highway><Location>CPKC overhead, 2 km east of Hwy 671, east of Kenora</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6007</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="145"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Steel River Bridge westerly, east of Terrace Bay</Location><Type Of Work>Realignment, Truck climbing lane, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2023-6038</Contract #><Project Length (kilometers)>4.1</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="146"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>599</Highway><Location>Hwy 642 at Silver Dollar northerly, north of Ignace</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-6026</Contract #><Project Length (kilometers)>41</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="147"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>125</Highway><Location>Chukuni River Bridge, 4 km east of Hwy 105, south of Balmertown, Red Lake</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2027-6010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="148"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>600</Highway><Location>Lathe Mill Culvert, west of Hwy 621, Lake of the Woods</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="149"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>Not applicable</Highway><Location>Kasabonika Modular Bridge, Kasabonika Remote Northern Airport</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2024-6007</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="150"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>808</Highway><Location>Otoskwin River Bridge, 60 km north of Hwy 599, north of Pickle Lake</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6011</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="151"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Ruby and Fire Hill Creek Culverts, 4 and 10 km east of Hwy 11, east of Nipigon</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2027-6012</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="152"><Program Type>Rehab</Program Type><Start Year>2027</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Omer Lake Culvert, 46 km north of Hwy 17, Greenstone</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2027</Target Completion><Contract #>2025-6013</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design complete</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="153"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>534</Highway><Location>Steels Creek Culvert, 11.8 km west of Hwy 654, Nipissing</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="154"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>533</Highway><Location>11 km north of the junction of Hwy 656, northerly, Mattawa</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="155"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>518</Highway><Location>Kearney Rd. to Star Lake Rd., Emsdale</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>8.1</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="156"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>141, 632</Highway><Location>4.4 km west of Rosseau River Bridge westerly, Rosseau</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>19.1</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="157"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Rest area, Agawa Bay</Location><Type Of Work>New facility</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="158"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>124</Highway><Location>North junction of Hwy 11 to Goreville Rd., north of South River</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>5.2</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="159"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>6</Highway><Location>Wakawagami Creek, Manitowaning</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="160"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>805</Highway><Location>Azen Creek Culvert and Mud Lake Culvert, north of Hwy 539, River Valley</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="161"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>522</Highway><Location>8.2 km west of Hwy 524 to 26.2 km west of Hwy 524, Commanda</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>18</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="162"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>624, 66</Highway><Location>Quebec-Ontario provincial border to 2.3 km west of Hwy 624, Virginiatown</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>21</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="163"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>17.2 km north of Hwy 64 to 0.2 km south of Wilson Lake Rd., north of Marten River</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>10.2</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="164"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Junction Creek Bridge, 8.9 km west of Sudbury Municipal Rd. 80 Middle Interchange</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract #>2026-5023</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="165"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>To be assigned</Highway><Location>Portage Creek Bridge, north of MacTier</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="166"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>400, To be assigned</Highway><Location>Mill Lake Bridge northerly 16.3 km, Parry Sound</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>17.9</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="167"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>637, To be assigned</Highway><Location>Wanapitei River Bridge and Mahzenazing River Bridge, Wanup</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="168"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101</Highway><Location>Groundhog River and Cripple Creek, east of Foleyet</Location><Type Of Work>Bridge replacement, Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="169"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>579</Highway><Location>Clute Creek Culvert #2 13 km north of Hwy 11 and culvert 3.3 km north of Hwy 11, Cochrane</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="170"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Root River Culverts, north of Hwy 7045, Sault Ste. Marie</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="171"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11, 520</Highway><Location>1 km north of Hwy 520 northerly 8.7 km, Burk's Falls</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>8.7</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="172"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>535, 64</Highway><Location>Hwy 528 northerly 21.7 km and Hwy 535 from Hwy 64 northerly 2.1 km, Noelville</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>23.8</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="173"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>631</Highway><Location>Nagagamisis Lake Bridge northerly 31.2 km, Hornepayne</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>31.2</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="174"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>400</Highway><Location>CNR Overhead Bridges 0.9 km south of Hwy 141,  Humphrey</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="175"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101</Highway><Location>Black River Bridge, 0.7 km north of Hwy 11, Matheson</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="176"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>63</Highway><Location>North Bay to 16.8 km south of Hwy 533, North Bay</Location><Type Of Work>Culvert replacement, Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>18.7</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="177"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Mattawa to 7.9 km east of Hwy 630, Mattawa</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>12.2</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="178"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Hwy 66 to 3.5 km south of Hwy 570, Kenogami Lake</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>11.4</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="179"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Sand Dam Rd. northerly to Ellsmere Rd., North Bay</Location><Type Of Work>Safety improvements, Resurfacing, Passing lane, Paved shoulders, New bridge, New culvert</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>13.8</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="180"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101</Highway><Location>East of north junction Hwy 101 easterly, east of Chapleau</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>21.8</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="181"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>520</Highway><Location>North Creek Bridge, 3 km west of Hwy 11, Magnetawan</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="182"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11, To be assigned</Highway><Location>1 km north of Stirling Creek Rd. to Muskoka Rd. overpass, Sundridge</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>9</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="183"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>124</Highway><Location>West junction of Hwy 520 to McKellar</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>17.8</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="184"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>518, 592</Highway><Location>Star Lake Rd. to the junction of Hwy 11/518 and Deer Lake Rd. to the north junction of Hwy 11, Emsdale</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>4.3</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="185"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>To be assigned</Highway><Location>Pickeral River Bridge, Bigwood</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="186"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>17, To be assigned</Highway><Location>East junction of Regional Rd. 55 to Hwy 69, Sudbury</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>12.5</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="187"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>6</Highway><Location>South Baymouth northerly 23.8 km</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>23.8</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="188"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101</Highway><Location>Salve (Painkiller) Creek Bridge, Matheson</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="189"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101</Highway><Location>ONR crossing easterly, Timmins</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>17.3</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="190"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>112</Highway><Location>Murdock Creek and unnamed culvert, 5.8 km south of Hwy 66, Kirkland Lake</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA in procurement</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="191"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Unnamed culvert, 3.4 km north of Hwy 560, Englehart</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="192"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>569</Highway><Location>Moose Creek Culvert, Couttsville</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="193"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101, 129</Highway><Location>Hwy 129 from north junction of Hwy 101 northerly to Chapleau and Hwy 101 from the south junction of Hwy 129 easterly and Poulin Creek Culvert, Chapleau</Location><Type Of Work>Culvert replacement, Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>35.1</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="194"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Net Lake Bridge, Temagami</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="195"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>655</Highway><Location>14 km south of Hwy 11 to Hwy 11, Driftwood</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>14</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="196"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>6.5 km to 18.3 km north of Hwy 570, Sesekinika</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>11.8</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="197"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Driftwood to 2.9 km north of Hwy 634, Smooth Rock Falls</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>25.9</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="198"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Hwy 663 to 7.7 km east of Hwy 631, Calstock</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>21.1</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="199"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>69</Highway><Location>North junction of Hwy 529 to 3.4 km north of Hwy 522, Still River</Location><Type Of Work>Resurfacing, Intersection improvements</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>18</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="200"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>60</Highway><Location>Renfrew-Nipissing boundary to Hwy 523, Madawaska</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>13.5</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="201"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>6</Highway><Location>CPR Swing Bridge (North Channel), north of Little Current</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$100 to $250 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Construction Manager General Contractor</Delivery Method></row>
<row _id="202"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>63</Highway><Location>16.7 km south of Hwy 533 northerly, Balsam Creek</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>17.8</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="203"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>562</Highway><Location>Unknown creek culvert, 4.9 km west of Hwy 11, Earlton</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="204"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>11</Highway><Location>Poplar Rapids River Bridge, 13.5 km west of Hwy 634, Smooth Rock Falls</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2024-5008</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Build</Delivery Method></row>
<row _id="205"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>17</Highway><Location>Garden River Bridge, Root River Bridge, Echo Bay Bridge, Garden River</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="206"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, East</Region><Highway>101, 129</Highway><Location>South junction of Hwy 129 westerly to Lawson Lake, Chapleau</Location><Type Of Work>Resurfacing, Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>27</Project Length (kilometers)><Estimated Cost Range>$25 to $50 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="207"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>71</Highway><Location>10 km south of Hwy 17 southerly, Sioux Narrows - Nestor Falls</Location><Type Of Work>Reconstruction, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-6001</Contract #><Project Length (kilometers)>27.9</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="208"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>502</Highway><Location>Hwy 17 southerly to Hwy 594, Dryden</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>3</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="209"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>West of Peninsula Rd. easterly, Marathon</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>17.8</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="210"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>71</Highway><Location>Nestor Falls Bridge, 36.0 km north of Hwys 600 and 615, Sioux Narrows - Nestor Falls</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="211"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>5.0 km west of Little Pic River Bridge westerly, east of Terrace Bay</Location><Type Of Work>Resurfacing, Truck climbing lane, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>Not available</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>25.9</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="212"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Postagoni River Culvert, 26 km west of Hwy 580, Greenstone</Location><Type Of Work>New bridge</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="213"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Hwy 17, from 1.0 km east of Hwy 72 at Dinorwic westerly, Dryden</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6004</Contract #><Project Length (kilometers)>30</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="214"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11, 17, 595, 614</Highway><Location>Hawk Lake Subway, Sitch Creek Culvert # 3, Maki Creek Culvert, Little Ozone Creek Culvert, Barbara Creek Culvert, east of Kenora, Gillies, north and east of Nipigon, south of Manitouwadge</Location><Type Of Work>Bridge rehabilitation, Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="215"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Noden Causeway structures, 20, 21 and 22 km west of Hwy 502, east of Fort Frances</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="216"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11, 11B, 622</Highway><Location>West of Hwy 11B easterly, Hwy 11B and Hwy 622 northerly, Atikokan</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>28.4</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="217"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>582</Highway><Location>Bruner Creek Culvert, 5 km south of Hwy 11/17 east junction, north of Dorion</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6010</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="218"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>105</Highway><Location>26 km north of Hwy 657 northerly, Ear Falls, north of Ear Falls</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>25.9</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="219"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Little Firesteel River Bridge, 13 km west of Upsala, east of Ignace</Location><Type Of Work>Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="220"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Gravel River Bridge, 24 km west of Rossport, east of Nipigon</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="221"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Blackwater River Bridge westerly, Greentstone</Location><Type Of Work>Paved shoulders, Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>29</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="222"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>West of Hwy 613 westerly, La Vallee, Emo, Chapple</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6012</Contract #><Project Length (kilometers)>24</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="223"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Hwy 622 westerly to 3 km east of Hwy 603, west of Ignace</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>19.2</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="224"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>East of Hwy 105 at Vermilion Bay westerly, Machin</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2026-6013</Contract #><Project Length (kilometers)>35.1</Project Length (kilometers)><Estimated Cost Range>$50 to $100 million</Estimated Cost Range><Engineering Status>Design upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="225"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>61</Highway><Location>Kaministiquia River Bridge, 7 km south of Hwy 11/17, Thunder Bay</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="226"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>102, 11</Highway><Location>West of Hwy 589 westerly to Hwy 11/17, Thunder Bay, Oliver Paipoonge, north of Conmee</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>26.1</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="227"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Wolf River Bridge, 4.0 km west of Hwy 582 south junction, Dorion</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="228"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>71</Highway><Location>Nestor Falls southerly, Sioux Narrows - Nestor Falls, Chapple</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>28.6</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="229"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>CPKC and Hwy 641 overhead, west of Kenora</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="230"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>26 km east of Hwy 11 easterly including Dublin Creek Culvert, east of Nipigon</Location><Type Of Work>Realignment, Culvert replacement, Safety improvements</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>1.6</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="231"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>593</Highway><Location>Little Whitefish River Modular and Arrow River Bridges, 16 and 19 km south of Hwy 588, west of Neebing</Location><Type Of Work>Bridge rehabilitation, Bridge replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="232"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>West junction of 17/17A westerly to Rush Bay Rd., west of Kenora</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>24</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="233"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>582</Highway><Location>Morrow Creek Culvert, 3.0 km east of Hwy 11/17 &amp; 582 west junction, north of Dorion</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="234"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>525</Highway><Location>Pistol Lake Culvert, north of Hwy 596, northwest of Kenora</Location><Type Of Work>Culvert replacement</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="235"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Cochrane/Thunder Bay District Boundary westerly, east of Greenstone</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>45.3</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="236"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>595</Highway><Location>Pine River Bridge, west of Hwy 597, Neebing</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2027-6007</Contract #><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="237"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>23 km east of Hwy 580 at Beardmore easterly, Greenstone</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>27.4</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="238"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>12 km west Hwy 802 westerly, east of Atikokan</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>29.8</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="239"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>11</Highway><Location>Mine Centre westerly to Hwy 502, east of Fort Frances</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>36.4</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="240"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>Baker Creek and English River Culverts, 26 and 30 km west of Upsala, east of Ignace</Location><Type Of Work>Culvert rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="241"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>105</Highway><Location>Hwy 618 southerly, Red Lake</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract #>2025-6025</Contract #><Project Length (kilometers)>17</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="242"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>599</Highway><Location>Hwy 17 at Ignace northerly to English River Bridge, north of Ignace</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>32.5</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="243"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>599</Highway><Location>Savant Lake CNR crossing northerly, north of Ignace</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>38</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="244"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>599</Highway><Location>North limit of Mishkeegogamang First Nation northerly to Pickle Lake</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>24</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Design in procurement</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="245"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>584</Highway><Location>10 km north of Geraldton northerly, Greenstone</Location><Type Of Work>Reconstruction</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>27</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA underway</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
<row _id="246"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>614</Highway><Location>Manitouwadge southerly</Location><Type Of Work>Resurfacing</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>25.8</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="247"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>17</Highway><Location>13 km west of Upsala westerly, east of Ignace</Location><Type Of Work>Resurfacing, Paved shoulders</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>35.3</Project Length (kilometers)><Estimated Cost Range>$10 to $25 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>To be determined</Delivery Method></row>
<row _id="248"><Program Type>Rehab</Program Type><Start Year>2028-2029</Start Year><Region>North, West</Region><Highway>811</Highway><Location>Mooseland River Bridge, 31 km west of Hwy 527, north of Thunder Bay</Location><Type Of Work>Bridge rehabilitation</Type Of Work><Highway Program Status>Planned</Highway Program Status><Target Completion>2028-2029</Target Completion><Contract # xsi:nil="true" /><Project Length (kilometers)>0</Project Length (kilometers)><Estimated Cost Range>$0 to $10 million</Estimated Cost Range><Engineering Status>Planning/EA upcoming</Engineering Status><Delivery Method>Design-Bid-Build</Delivery Method></row>
</data>