﻿_id	Program Type	Start Year	Region	Highway	Location	Type Of Work	Highway Program Status	Target Completion	Contract #	Project Length (kilometers)	Estimated Cost Range	Engineering Status	Delivery Method
1	Expansion	Upcoming Expansion	North, East	69	North of the north junction of Hwy 529, northerly, Britt	Two to four-lane widening	Planned	Not available		20.4	$250 to $500 million	Design underway	To be determined
2	Expansion	Upcoming Expansion	North, East	69	Patrol yard on Hwy 529 interchange, Pointe Au Baril	New facility	Planned	Not available		0	$10 to $25 million	Design upcoming	To be determined
3	Expansion	Upcoming Expansion	North, East	69	Hwy 69 connection to Sudbury Southeast Bypass, Sudbury	Two to four-lane widening	Planned	Not available		6.2	$100 to $250 million	Design upcoming	To be determined
4	Expansion	Upcoming Expansion	North, East	69	South junction of Hwy 529 northerly, Pointe au Baril	Two to four-lane widening, New bridge, New culvert	Planned	Not available		15	$100 to $250 million	Design upcoming	To be determined
5	Expansion	Upcoming Expansion	North, East	69	South of Hwy 7182 (Shebeshegong Rd.), northerly, Shawanaga	Two to four-lane widening	Planned	Not available		5	$100 to $250 million	Design upcoming	To be determined
6	Expansion	Upcoming Expansion	North, East	69	South of north junction of Hwy 529 northerly, Pointe au Baril	Two to four-lane widening	Planned	Not available		7.5	$100 to $250 million	Design upcoming	To be determined
7	Expansion	Upcoming Expansion	North, East	652	Cochrane Bypass, extension of Hwy 652, Genier Rd. to Hwy 11, Cochrane	New two-lane highway	Planned	Not available		4.5	$25 to $50 million	Design underway	To be determined
8	Expansion	Upcoming Expansion	North, East	69	North of Hwy 559, northerly, Nobel	Two to four-lane widening	Planned	Not available		12.2	$100 to $250 million	Design in procurement	To be determined
9	Expansion	Upcoming Expansion	North, East	69	North Hwy 7182 (Shebeshegong Rd.), northerly, Pointe au Baril	Two to four-lane widening	Planned	Not available		11	$100 to $250 million	Design upcoming	To be determined
10	Expansion	2026	North, West	11, 17	McGuire Rd. westerly to Coughlin Rd. including Black Sturgeon River Bridges, Red Rock	Two to four-lane widening, New bridge, Bridge removal, Illumination	Underway	2029	2024-6011	5	$50 to $100 million	Design complete	Design-Bid-Build
11	Expansion	2027	North, West	11, 17	Pearl Lake easterly to west of CPKC overhead at Ouimet, Shuniah	Two to four-lane widening	Planned	Not available		7.6	$100 to $250 million	Design underway	Design-Bid-Build
12	Expansion	2027	North, West	17	West of Hwy 673 easterly including Moth Lake culverts, west of Kenora	Two to four-lane widening, New culvert, Illumination	Planned	Not available	2024-6013	11	$100 to $250 million	Planning/EA underway	Design-Bid-Build
13	Expansion	2028-2029	North, West	11, 17	East of junction Hwy 582 westerly to Dorion East Loop Rd. including Coldwater Creek and Wolf River Bridges, Dorion	New bridge, Two to four-lane widening	Planned	Not available		12.1	$100 to $250 million	Design underway	Design-Bid-Build
14	Rehab	2023	North, East	17	Thessalon to Iron Bridge	Culvert replacement, Resurfacing, Intersection improvements, Culvert rehabilitation	Underway	2026	2023-5001	33.3	$25 to $50 million	Design complete	Design-Build
15	Rehab	2024	North, East	11	Birches Rd. overpasses and CNR overheads, south of North Bay	Bridge rehabilitation	Underway	2026	2024-5012	0	$0 to $10 million	Design complete	Design-Bid-Build
16	Rehab	2024	North, East	11	ONR overhead, Earlton	Bridge replacement	Underway	2026	2024-5009	0	$25 to $50 million	Design complete	Design-Bid-Build
17	Rehab	2024	North, East	101	Mattawasaga River Bridge and Ghost River Bridge, east of Matheson	Bridge rehabilitation	Underway	2026	2024-5007	0	$10 to $25 million	Design complete	Design-Bid-Build
18	Rehab	2024	North, East	11	Kapuskasing easterly to west of Fauquier	Resurfacing, Culvert rehabilitation, Paved shoulders	Underway	2026	2023-5095	24.8	$25 to $50 million	Design complete	Design-Bid-Build
19	Rehab	2024	North, East	592	Little East River Bridge, north of Hwy 11, Novar	Bridge replacement	Underway	2026	2024-5014	0	$0 to $10 million	Design complete	Design-Bid-Build
20	Rehab	2025	North, East	11	Earlton Fire Memorial Rest Area	Rest area	Underway	2026	2025-5007	0	$0 to $10 million	Design complete	Design-Bid-Build
21	Rehab	2025	North, East	To be assigned	Spanish River Bridge, Massey	Bridge rehabilitation	Underway	2026	2025-5075	0	$0 to $10 million	Design complete	Design-Bid-Build
22	Rehab	2025	North, East	69	3.2 km south of Hwy 637 to 2.3 km south of Nelson Rd., Sudbury	Resurfacing	Underway	2026	2025-5013	12.5	$0 to $10 million	Design complete	Design-Bid-Build
23	Rehab	2025	North, East	64	Holdridge Creek Bridge, Martin River	Bridge replacement	Underway	2026	2025-5006	0	$0 to $10 million	Design complete	Design-Bid-Build
24	Rehab	2025	North, East	17, 17B	Garden River to Echo Bay	Resurfacing	Underway	2027	2023-5007	18	$50 to $100 million	Design complete	Design-Bid-Build
25	Rehab	2025	North, East	17	Sault Ste. Marie to Heyden	Culvert rehabilitation, Resurfacing, Paved shoulders, Safety improvements	Underway	2026	2024-5114	14.5	$25 to $50 million	Design complete	Design-Bid-Build
26	Rehab	2025	North, East	69	Hwy 400 northerly to north of Hwy 7182, Shawanaga southerly	Bridge rehabilitation, Resurfacing, Intersection improvements	Underway	2027	2025-5014	19.6	$25 to $50 million	Design complete	Design-Bid-Build
27	Rehab	2025	North, East	17	Hwy 69 overpass, eastbound and westbound lanes, Sudbury	Bridge rehabilitation	Underway	2026	2025-5010	0	$0 to $10 million	Design complete	Design-Bid-Build
28	Rehab	2025	North, East	546	Kindiogami River Bridge, Camp 8 Creek Bridge, Skunk Creek Bailey Bridge, Little White River Bridge, north of Elliot Lake	Bridge rehabilitation, Bridge replacement	Underway	2026	2024-5024	0	$0 to $10 million	Design complete	Design-Bid-Build
29	Rehab	2026	North, East	101	0.3 km west of Lawson Lake Culvert to 2.2 km west of Hwy 651, Chapleau	Resurfacing	Planned	2026	2026-5013	38.6	$0 to $10 million	Design complete	Design-Bid-Build
30	Rehab	2026	North, East	17	East Baldhead Bridge and West Baldhead Bridge, south of Wawa	Bridge replacement	Planned	2027	2026-5017	0	$10 to $25 million	Design complete	Design-Bid-Build
31	Rehab	2026	North, East	144	22.8 km north of Hwy 661 to Kenogamissi Falls Rd., north of Gogama	Resurfacing	Planned	2026	2026-5048	20.5	$0 to $10 million	Design complete	Design-Bid-Build
32	Rehab	2026	North, East	101	3.1 km east of former ONR crossing to 0.2 km west of Kidd Met Site Rd., Timmins	Resurfacing	Planned	2027	2026-5064	6.6	$0 to $10 million	Design complete	Design-Bid-Build
33	Rehab	2026	North, East	67	Main St. to end of highway, Iroquois Falls	Resurfacing	Underway	2026	2026-5020	0.7	$0 to $10 million	Design complete	Design-Bid-Build
34	Rehab	2026	North, East	11	9.6 km south of Hwy 534 northerly 4.6 km, Trout Creek	Bridge rehabilitation, Resurfacing, Culvert rehabilitation	Planned	2028-2029	2026-5011	4.6	$10 to $25 million	Design underway	Design-Bid-Build
35	Rehab	2026	North, East	592	Little East River Bridges 2, 3 and 4 north of Hwy 11, Novar	Bridge replacement	Planned	2028-2029	2025-5141	0	$10 to $25 million	Design complete	Design-Bid-Build
36	Rehab	2026	North, East	11	Jacobs Hill Rd. northerly 20.5 km, Nellie Lake	Culvert replacement, Resurfacing, Paved shoulders	Planned	2027	2026-5015	20.5	$10 to $25 million	Design complete	Design-Bid-Build
37	Rehab	2026	North, East	17, 548	Stobie Creek Bridge, Richardson Creek Bridge and Walker Creek Culvert, Richards Landing	Bridge replacement, Culvert rehabilitation	Underway	2028	2026-5018	0	$0 to $10 million	Design complete	Design-Bid-Build
38	Rehab	2026	North, East	17	1 km east of Hwy 548 westerly 16.5 km, Echo Bay	Resurfacing, Bridge rehabilitation, Bridge replacement	Underway	2028	2026-5019	16.5	$25 to $50 million	Design complete	Design-Bid-Build
39	Rehab	2026	North, East	559	Hwy 400 westerly to end of hwy, north of Nobel	Resurfacing, Paved shoulders	Underway	2027	2024-5020	17.4	$10 to $25 million	Design complete	Design-Bid-Build
40	Rehab	2026	North, East	17	Laronde Creek Bridge to Sturgeon Falls east limits	Resurfacing	Underway	2026	2026-5038	15.2	$0 to $10 million	Design complete	Design-Bid-Build
41	Rehab	2026	North, East	652	Lawagamau River Bridge, Floodwood River Bridge and Little Abitibi River Bridge, north of Cochrane	Bridge replacement	Underway	2027	2026-5001	0	$10 to $25 million	Design complete	Design-Bid-Build
42	Rehab	2026	North, East	575, 64	Sturgeon Falls to Field	Resurfacing, Culvert replacement	Underway	2028	2026-5009	22.1	$10 to $25 million	Design complete	Design-Bid-Build
43	Rehab	2026	North, East	124, 520	Whitestone Lake Bridge at Dunchurch and Whitestone River Bridge at Whitestone	Bridge rehabilitation	Planned	2027	2025-5012	0	$0 to $10 million	Design underway	Design-Bid-Build
44	Rehab	2026	North, East	101	Hwy 547 westerly 9 km, Wawa	Resurfacing	Underway	2026	2023-5096	9	$0 to $10 million	Design complete	Design-Bid-Build
45	Rehab	2026	North, East	101	Hwy 144 easterly to Government Rd., Timmins westerly	Resurfacing, Culvert replacement	Underway	2027	2026-5008	16.1	$10 to $25 million	Design complete	Design-Bid-Build
46	Rehab	2026	North, East	17	10.2 km east of Hwy 108, easterly 22 km, Spanish	Resurfacing, Culvert replacement, Bridge rehabilitation	Planned	2028-2029	2026-5022	22	$25 to $50 million	Design complete	Design-Bid-Build
47	Rehab	2024	North, West	72	Hwy 17 northerly to 3 km north of Kathlyn Lake Rd., south of Sioux Lookout	Resurfacing	Underway	2026	2024-6001	35.5	$25 to $50 million	Design complete	Design-Bid-Build
48	Rehab	2024	North, West	11, 17	Polemounted variable message signs, various locations (15), Nipigon to Fort Frances, Dryden to Kenora	Signage rehabilitation	Underway	2026	2023-6067	0	$0 to $10 million	Design complete	Design-Bid-Build
49	Rehab	2025	North, West	11, 61	Various intersections and locations, east of Balsam St. southerly to Harbour Expressway and Hwy 61 southerly, Thunder Bay	Resurfacing, Intersection improvements	Underway	2027	2023-6007	15.7	$25 to $50 million	Design complete	Design-Bid-Build
50	Rehab	2025	North, West	584	Various locations (14), 27 km north of Hwy 11, northerly 11 km, Greenstone	Culvert replacement	Underway	2026	2025-6016	0	$0 to $10 million	Design complete	Single Source
51	Rehab	2025	North, West	602	Lyon Creek Culvert No 1, 1.0 km south of Hwy 11, Emo	Culvert replacement	Underway	2026	2023-6036	0	$0 to $10 million	Design complete	Design-Bid-Build
52	Rehab	2025	North, West	17	New rest area building, Terrace Bay	New facility	Underway	2026	2024-6021	0	$0 to $10 million	Design complete	Design-Bid-Build
53	Rehab	2025	North, West	582, 589, 591	Hwy 591, from Hwy 589 to end of Hwy and Hwy 589, from Goodman Lake Rd. to Two Islands Lake Rd., north of Thunder Bay	Resurfacing	Underway	2026	2025-6058	0	$0 to $10 million	Design complete	Design-Bid-Build
54	Rehab	2025	North, West	17, 614, 627	Various locations between Nipigon and White River	Culvert replacement	Underway	2026	2025-6032	0	$0 to $10 million	Design complete	Single Source
55	Rehab	2025	North, West	17, 614	Various locations between Nipigon and White River	Culvert replacement	Underway	2026	2025-6033	0	$0 to $10 million	Design complete	Single Source
56	Rehab	2025	North, West	61	Pigeon River Bridge at Canada/USA International Border, Neebing	Bridge rehabilitation	Underway	2026	2024-6015	0	$0 to $10 million	Design complete	Design-Bid-Build
57	Rehab	2025	North, West	11	Angle Creek and Partridge Lake Culverts, 7 km east of Hwy 580 and 32 km west of Hwy 584, Greenstone	Culvert rehabilitation	Underway	2026	2025-6022	0	$0 to $10 million	Design complete	Design-Bid-Build
58	Rehab	2025	North, West	17	8 km west of Schreiber westerly including Hewitson Creek Culvert	Culvert replacement, Realignment	Underway	2027	2025-6024	3.8	$25 to $50 million	Design complete	Design-Bid-Build
59	Rehab	2026	North, West	622	Seine River Bridge, 21 km north of Hwy 11B, north of Atikokan	Bridge rehabilitation	Underway	2027	2025-6002	0	$0 to $10 million	Design complete	Design-Bid-Build
60	Rehab	2026	North, West	17	West of Schreiber and Terrace Bay municipality limit	Hazard rock removal	Underway	2026	2024-6045	0	$0 to $10 million	Design complete	Design-Bid-Build
61	Rehab	2026	North, West	61	Slate River Tributary Culvert, 2.0 km south of Hwy 130, Neebing	Culvert replacement	Underway	2026	2025-6065	0	$0 to $10 million	Design complete	Design-Bid-Build
62	Rehab	2026	North, West	527, 582	Hwy 527 from Kopka River Bridge northerly and Hwy 582 from Hwy 11/17 west junction easterly, north of Shuniah,  east of Dorion	Resurfacing	Planned	2027	2026-6031	43.9	$0 to $10 million	Design complete	Design-Bid-Build
63	Rehab	2026	North, West	671	24 km north of Hwy 17A northerly, north of Kenora	Safety improvements, Guide rail improvements, Realignment	Underway	2026	2025-6054	1.5	$0 to $10 million	Design complete	Design-Bid-Build
64	Rehab	2026	North, West	17	East of Hwy 631 westerly, White River	Resurfacing, Paved Shoulders	Planned	2028-2029	2025-6003	52.3	$25 to $50 million	Design underway	Design-Bid-Build
65	Rehab	2026	North, West	130	Twin City Cross Rd. and Arthur St. intersection, Oliver Paipoonge	Intersection improvements	Planned	2027	2023-6019	0	$0 to $10 million	Design underway	Design-Bid-Build
66	Rehab	2026	North, West	11	Windy Point Bridge, 11 km west of Hwy 502, east of Fort Frances	Bridge rehabilitation	Underway	2026	2026-6033	0	$0 to $10 million	Design complete	Design-Bid-Build
67	Rehab	2026	North, West	17	Schreiber to Terrace Bay	Resurfacing	Planned	2026	2026-6020	16.2	$0 to $10 million	Design complete	Design-Bid-Build
68	Rehab	2026	North, West	11	Nipigon River Bridge at Nipigon	Bridge rehabilitation	Planned	2026	2026-6014	0	$0 to $10 million	Design complete	Design-Bid-Build
69	Rehab	2026	North, West	11	Millers Creek Culvert, 9 km west of Hwy 621, Rainy River	Culvert replacement	Underway	2026	2026-6061	0	$0 to $10 million	Design complete	Design-Bid-Build
70	Rehab	2026	North, West	11	Wild Goose Creek and Blind Creek Culverts - eastbound lane, 6 and 7 km east of Hwy 527, Shuniah	Culvert rehabilitation	Underway	2026	2025-6010	0	$0 to $10 million	Design complete	Design-Bid-Build
71	Rehab	2026	North, West	599	Medcalf Lake Narrows Bridge, 85 km north of Hwy 516, south of Pickle Lake	Bridge rehabilitation	Underway	2026	2025-6009	0	$0 to $10 million	Design complete	Design-Bid-Build
72	Rehab	2026	North, West	61	Slate River Bridges, 1.0 and 7.0 km north of Hwy 608, Oliver Paipoonge, Neebing	Bridge rehabilitation	Underway	2026	2023-6010	0	$0 to $10 million	Design complete	Design-Bid-Build
73	Rehab	2026	North, West	17	CPKC overhead at Martin, 9 km west of English River, east of Ignace	Bridge replacement	Underway	2027	2025-6011	0	$10 to $25 million	Design complete	Design-Bid-Build
74	Rehab	2026	North, West	17	CPKC overhead, Terrace Bay	Bridge replacement	Planned	2028-2029	2022-6010	0	$10 to $25 million	Design complete	Design-Bid-Build
75	Rehab	2026	North, West	17	McKellar and Ripple Creek Culverts, 36 and 38 km west of Marathon	Culvert rehabilitation	Underway	2026	2024-6004	0	$0 to $10 million	Design complete	Design-Bid-Build
76	Rehab	2026	North, West	664, 72	36 km north of Hwy 17 northerly to Sioux Lookout including Ariano Bypass and Hwy 664 westerly to Hudson, Sioux Lookout	Resurfacing	Planned	2028-2029	2024-6005	49.3	$50 to $100 million	Design complete	Design-Bid-Build
77	Rehab	2026	North, West	502	47 km north of Hwy 11 northerly, east of Fort Frances	Resurfacing	Planned	2027	2025-6008	19	$10 to $25 million	Design underway	Design-Bid-Build
78	Rehab	2026	North, West	Not applicable	Fort Severn Modular Bridge, Fort Severn Remote Northern Airport	Bridge replacement	Underway	2027	2024-6008	0	$0 to $10 million	Design complete	Design-Bid-Build
79	Rehab	2026	North, West	11, 17, 628	Hwy 628 from Hwy 11/17 easterly, Red Rock, Hwy 11/17 from 2.0 km west of Hwy 11 westerly, Nipigon and Hwy 17 from 48 km east of Hwy 11 easterly, west of Schreiber	Resurfacing, Paved shoulders, Bridge rehabilitation	Planned	2027	2025-6012	10.5	$10 to $25 million	Design underway	Design-Bid-Build
80	Rehab	2026	North, West	102	CPKC Kaministiquia and CNR overheads, 4 km east of Hwy 17 at Sistonen's Corners, west of Oliver-Paipoonge	Bridge rehabilitation, Bridge removal	Underway	2028	2024-6017	0	$10 to $25 million	Design complete	Design-Bid-Build
81	Rehab	2026	North, West	11	Oliver Rd., Kakabeka to Hwy 11, Shabaqua, Oliver Paipoonge, Conmee, west of Conmee	Resurfacing, Paved shoulders	Planned	2028-2029	2025-6021	38.2	$50 to $100 million	Design underway	Design-Bid-Build
82	Rehab	2027	North, East	553, 810	River aux Sables Bridges, Cameron Creek Bridge, north of Hwy 17, north of Massey	Bridge replacement	Planned	2028-2029	2023-5009	0	$10 to $25 million	Design underway	Design-Bid-Build
83	Rehab	2027	North, East	17	West junction Municipal Rd. 55, west of Sudbury	Intersection improvements	Planned	2028-2029	2022-5036	0.1	$0 to $10 million	Design underway	Design-Bid-Build
84	Rehab	2027	North, East	11	Rest area at Hwy 11, Marten River	New facility	Planned	2028-2029	2023-5010	0	$10 to $25 million	Design underway	Design-Bid-Build
85	Rehab	2027	North, East	560	West of west junction of Hwy 65, west of Elk Lake	Culvert replacement	Planned	2027	2022-5009	0	$0 to $10 million	Design underway	Design-Bid-Build
86	Rehab	2027	North, East	11	Straight Creek Culvert, south of Latchford	Culvert replacement	Planned	2027	2024-5002	0	$0 to $10 million	Design underway	Design-Bid-Build
87	Rehab	2027	North, East	69	Richard Lake Creek, Sudbury	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
88	Rehab	2027	North, East	522	Commanda Creek Bridge, Commanda	Bridge replacement	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
89	Rehab	2027	North, East	11, 65	Hwy 11, Hwy 11B to Roland Rd., south of New Liskeard northerly and Hwy 65, Armstrong St. northerly to north junction Hwy 11/65 at New Liskeard	Resurfacing	Planned	2028-2029		18.9	$10 to $25 million	Design underway	Design-Bid-Build
90	Rehab	2027	North, East	655	Algonquin Blvd. to 11.3 km north of Hwy 101, Timmins	Resurfacing	Planned	2027		11.3	$0 to $10 million	Design underway	Design-Bid-Build
91	Rehab	2027	North, East	101, 17	0.1 km east of Watsons Skyways Rd. to 9 km west of Hwy 547,  Catfish Creek Culvert #2 and Wawa Lake Culvert, Wawa	Resurfacing, Culvert rehabilitation	Planned	2028-2029	2027-5002	9	$25 to $50 million	Design underway	Design-Bid-Build
92	Rehab	2027	North, East	65	Elk Lake northerly 18.5 km	Resurfacing, Culvert replacement	Planned	2028-2029	2026-5003	18.5	$10 to $25 million	Design underway	Design-Bid-Build
93	Rehab	2027	North, East	17	Montreal River Bridge, Montreal River	Bridge replacement	Planned	Not available	2025-5005	0	$10 to $25 million	Design complete	Design-Build
94	Rehab	2027	North, East	17	0.7 km north of Frater Rd. northerly 25.3 km, Montreal River	Resurfacing, Culvert replacement, Paved shoulders, Culvert rehabilitation	Planned	2028-2029		25.3	$50 to $100 million	Design underway	Design-Bid-Build
95	Rehab	2027	North, East	17	Everett Lake Tributary Culvert, Iron Bridge	Culvert replacement	Planned	2027	2026-5012	0	$0 to $10 million	Design underway	Design-Bid-Build
96	Rehab	2027	North, East	To be assigned	Root River #1 Culvert and Root River #2 Culvert, Sault Ste. Marie	Culvert replacement	Planned	2027	2026-5072	0	$0 to $10 million	Design underway	Design-Bid-Build
97	Rehab	2027	North, East	638	Bar River Bridge #1, Bar River Bridge #2 and Bar River Bridge #3, Echo Bay	Bridge replacement	Planned	2028-2029		0	$10 to $25 million	Design underway	Design-Bid-Build
98	Rehab	2027	North, East	17	Depew River Bridge, Chain Lake Culvert, CPR overhead, South White River and South White River Bridge, south of White River	Bridge replacement, Culvert rehabilitation	Planned	Not available	2026-5070	0	$25 to $50 million	Design underway	Design-Bid-Build
99	Rehab	2027	North, East	17	Spanish River Bridge, 8.2 km east of Hwy 6, east of McKerrow	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
100	Rehab	2027	North, East	17	White River Rest Area	Rest area	Planned	2027		0	$0 to $10 million	Design underway	Design-Bid-Build
101	Rehab	2027	North, East	11	Fern Glen Rd. underpass, 4.2 km south of Hwy 518, Emsdale	Bridge rehabilitation	Planned	2027	2027-5001	0	$0 to $10 million	Design underway	Design-Bid-Build
102	Rehab	2027	North, East	17	Wawa Truck Rest Area	Rest area	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
103	Rehab	2027	North, East	144	North of Hwy 661 northerly, north of Gogama	Resurfacing, Culvert rehabilitation	Planned	2028-2029	2026-5071	28.1	$50 to $100 million	Design underway	Design-Bid-Build
104	Rehab	2027	North, East	60	Opeongo River Bridge, Madawaska River Bridge and Poverty Creek Culvert, Madawaska	Bridge replacement, Culvert replacement	Planned	2028-2029		0	$50 to $100 million	Planning/EA underway	To be determined
105	Rehab	2027	North, East	17	South of Hwy 101 southerly, including the Old Woman River Bridge, south of Wawa	Resurfacing, Bridge rehabilitation, Paved shoulders, Culvert replacement	Planned	2028-2029		21.6	$25 to $50 million	Design underway	Design-Bid-Build
106	Rehab	2027	North, East	17	West of Markstay easterly to Hagar	Resurfacing, Paved shoulders, Bridge rehabilitation	Planned	2028-2029	2026-5016	20.4	$25 to $50 million	Design underway	Design-Bid-Build
107	Rehab	2027	North, East	579	Clute Creek Culverts, north of Cochrane	Culvert replacement	Planned	2027	2024-5019	0	$0 to $10 million	Design underway	Design-Bid-Build
108	Rehab	2027	North, East	11	0.1 km south of Lakeshore Dr. northerly 0.7 km, Temagami	Resurfacing	Planned	2028-2029	2025-5021	0.7	$0 to $10 million	Design underway	Design-Bid-Build
109	Rehab	2027	North, East	519	Magpie River Bridge, Dubreuilville	Bridge rehabilitation	Planned	2027		0	$0 to $10 million	Design upcoming	Design-Bid-Build
110	Rehab	2027	North, East	144	10.2 km south of Hwy 560 to 9.9 km north of Hwy 560, Westree	Resurfacing	Planned	2028-2029		20.1	$25 to $50 million	Design underway	Design-Bid-Build
111	Rehab	2027	North, East	129	Mississagi River Bridge, Wharncliffe	Bridge replacement	Planned	2028-2029		0	$25 to $50 million	Design underway	Design-Bid-Build
112	Rehab	2027	North, West	11	CNR Rainy Lake overhead, 2 km east of Hwy 502, east of Fort Frances	Bridge rehabilitation	Planned	2027	2023-6016	0	$0 to $10 million	Design underway	Design-Bid-Build
113	Rehab	2027	North, West	11	Boom Creek Culvert, 14.0 km north of Hwy 17, north of Nipigon	Culvert replacement	Planned	2027	2026-6022	0	$0 to $10 million	Design underway	Design-Bid-Build
114	Rehab	2027	North, West	17, 17A, 525, 596, 641, 658, 671, To be assigned	Various locations, Hwy 17, 17A, 71, 525, 596, 641, 658, 671 and 7059, Kenora, east/west/north of Kenora, north of Sioux Narrows-Nestor Falls	Culvert replacement	Planned	2027	2026-6023	0	$0 to $10 million	Design upcoming	Design-Bid-Build
115	Rehab	2027	North, West	11, 502, 601, 605, 665	Various locations, Hwy 11, 17, 502, 594, 601, 665 and 605, Machin, east/west/south of Dryden, east of Fort Frances	Culvert replacement	Planned	2027	2025-6018	0	$0 to $10 million	Design in procurement	Design-Bid-Build
116	Rehab	2027	North, West	105, 17, 594	Various locations, Hwy 105, 125, 609, 618, 657, 647, and 804, Machin, north of Machin, Ear Falls, west/north/south of Earfalls, Red Lake	Culvert replacement	Planned	2027	2025-6019	0	$0 to $10 million	Design underway	Design-Bid-Build
117	Rehab	2027	North, West	11, 600, 602, 611, 613, 615, 617, 619, 621, 71	Various locations, Hwy 11, 71, 600, 602, 611, 613, 615, 617, 619 and 621, Sioux Narrows-Nestor Falls, Lake of the Woods, Dawson, Morley, Chapple, Emo, La Vallee, Alberton	Culvert replacement	Planned	2027	2025-6020	0	$0 to $10 million	Design underway	Design-Bid-Build
118	Rehab	2027	North, West	17	13 km west of Hwy 11 at Shabaqua Corners westerly, west of Conmee	Resurfacing, Paved shoulders	Planned	2028-2029	2027-6002	26.4	$25 to $50 million	Design in procurement	Design-Bid-Build
119	Rehab	2027	North, West	642	Hwy 72 and 516 Junction easterly to Sturgeon River Bridge, Sioux Lookout	Resurfacing	Planned	2028-2029	2026-6032	9.9	$0 to $10 million	Design complete	Design-Bid-Build
120	Rehab	2027	North, West	17, 71	West limit of Kenora westerly to Hwy 17A west connection, and 11.0 km east of Hwy 71 westerly to east limit of Kenora including Hwy 71 junction	Resurfacing	Planned	2028-2029	2026-6001	26	$25 to $50 million	Design underway	Design-Bid-Build
121	Rehab	2027	North, West	11	Coldwater Creek Bridge, 6 km west of south junction Hwy 582, Dorion	Bridge rehabilitation	Planned	2027		0	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
122	Rehab	2027	North, West	619	Pinewood River Bridge, 2 km north of Hwy 11, Dawson	Bridge rehabilitation	Planned	2027	2024-6014	0	$0 to $10 million	Design underway	Design-Bid-Build
123	Rehab	2027	North, West	588	Silver Creek Culvert, 10 km south of Hwy 11/17, O'Connor	Culvert rehabilitation	Planned	2027	2025-6027	0	$0 to $10 million	Planning/EA underway	Design-Bid-Build
124	Rehab	2027	North, West	17	Revell River No. 3 Bridge, 1 km east of Hwy 622, west of Ignace	Bridge rehabilitation	Planned	2027	2026-6002	0	$0 to $10 million	Design underway	Design-Bid-Build
125	Rehab	2027	North, West	11	6.0 km east of Hwy 102 easterly, Thunder Bay, Shuniah	Resurfacing, Paved shoulders	Planned	2028-2029	2026-6003	29.3	$10 to $25 million	Planning/EA underway	Design-Bid-Build
126	Rehab	2027	North, West	17	Crocker Lake East Culvert, 8 km west of Hwy 631, west of White River	Culvert replacement	Planned	2027	2027-6003	0	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
127	Rehab	2027	North, West	597	Moores Creek Modular Bridge, 9 km south of Hwy 608, Neebing	Bridge replacement	Planned	2027	2027-6004	0	$0 to $10 million	Planning/EA upcoming	To be determined
128	Rehab	2027	North, West	11	Bullrush Lake Culvert, 30 km north of Hwy 17, south of Greenstone	Culvert replacement	Planned	2027	2027-6005	0	$0 to $10 million	Design upcoming	Design-Bid-Build
129	Rehab	2027	North, West	808	Pineimuta River Modular Bridge, 141 km north of Hwy 599, Central Patricia	Bridge replacement	Planned	2028-2029	2026-6007	0	$0 to $10 million	Design underway	Design-Bid-Build
130	Rehab	2027	North, West	11	Oskondaga River Bridge, east of Hwy 11/17 west junction at Shabaqua Corners, west of Conmee	Bridge rehabilitation	Planned	2027	2026-6008	0	$0 to $10 million	Design underway	Design-Bid-Build
131	Rehab	2027	North, West	17	Gulliver River Bridge, 10 km east of Hwy 599, east of Ignace	Bridge rehabilitation	Planned	2027	2026-6009	0	$0 to $10 million	Design underway	Design-Bid-Build
132	Rehab	2027	North, West	17	Beaver Creek Bridge, 9 km west of Hwy 605, Machin	Bridge rehabilitation	Planned	2027	2026-6011	0	$0 to $10 million	Design underway	Design-Bid-Build
133	Rehab	2027	North, West	105	English River Bridge, Ear Falls and Perrault Falls Culvert, south of Ear Falls	Bridge rehabilitation, Culvert rehabilitation	Planned	2028-2029	2024-6003	0	$0 to $10 million	Design underway	Design-Bid-Build
134	Rehab	2027	North, West	17	2 km west of Hwy 614 westerly, east of Marathon	Reconstruction, Paved shoulders, Hazard rock removal, Safety improvements	Planned	2027	2025-6006	20.8	$10 to $25 million	Design underway	Design-Bid-Build
135	Rehab	2027	North, West	125	Hwy 105 northerly to north limit of Cochenour, Red Lake	Reconstruction	Planned	2027		13.6	$10 to $25 million	Design underway	Design-Bid-Build
136	Rehab	2027	North, West	17	Melgund Creek, Osaquan River, Shoshowae Creek East and Sisson Creek Culverts, west of Hwy 603, 11 km west of Hwy 599, 8 km west of Hwy 665 and 66 km east of Hwy 599, east and west of Ignace	Culvert rehabilitation	Planned	2027	2026-6015	0	$0 to $10 million	Design underway	Design-Bid-Build
137	Rehab	2027	North, West	502	Marguerite St. Bridge, west of Hwy 17, Dryden	Bridge rehabilitation	Planned	2027	2027-6006	0	$0 to $10 million	Design underway	Design-Bid-Build
138	Rehab	2027	North, West	502	Rattlesnake Creek Culvert, 56 km south of Hwy 594, south of Dryden	Culvert replacement	Planned	2027	2027-6001	0	$0 to $10 million	Design underway	Design-Bid-Build
139	Rehab	2027	North, West	811	Gull River Culverts, 17 km west of Hwy 527, north of Thunder Bay	Culvert replacement	Planned	2027	2025-6023	0	$0 to $10 million	Design underway	Design-Bid-Build
140	Rehab	2027	North, West	588	2 km south of Hwy 11/17 westerly, Oliver Paipoonge, O'Connor, Gillies	Reconstruction	Planned	2027	2026-6021	13.4	$0 to $10 million	Design in procurement	Design-Bid-Build
141	Rehab	2027	North, West	17	Rest Creek Culvert, 24 km west of Raith, west of Conmee	Culvert rehabilitation	Planned	2027		0	$0 to $10 million	Planning/EA underway	Design-Bid-Build
142	Rehab	2027	North, West	11	Corbett Creek Culverts and McIntyre Creek Drainage Culverts,  5.0 km west of Hwy 130 and 1.0 km west of Hwy 102, Thunder Bay, Oliver Paipoonge	Culvert rehabilitation	Planned	2027	2027-6008	0	$0 to $10 million	Design underway	Design-Bid-Build
143	Rehab	2027	North, West	17	Little Pic River Bridge westerly, west of Marathon	Realignment, Truck climbing lane, Paved shoulders	Planned	2028-2029	2027-6009	4.5	$50 to $100 million	Design underway	Design-Bid-Build
144	Rehab	2027	North, West	17A	CPKC overhead, 2 km east of Hwy 671, east of Kenora	Bridge rehabilitation	Planned	2027	2025-6007	0	$0 to $10 million	Design underway	Design-Bid-Build
145	Rehab	2027	North, West	17	Steel River Bridge westerly, east of Terrace Bay	Realignment, Truck climbing lane, Paved shoulders	Planned	2028-2029	2023-6038	4.1	$25 to $50 million	Design underway	Design-Bid-Build
146	Rehab	2027	North, West	599	Hwy 642 at Silver Dollar northerly, north of Ignace	Reconstruction	Planned	2028-2029	2025-6026	41	$10 to $25 million	Design in procurement	Design-Bid-Build
147	Rehab	2027	North, West	125	Chukuni River Bridge, 4 km east of Hwy 105, south of Balmertown, Red Lake	Bridge replacement	Planned	2028-2029	2027-6010	0	$10 to $25 million	Design underway	Design-Bid-Build
148	Rehab	2027	North, West	600	Lathe Mill Culvert, west of Hwy 621, Lake of the Woods	Culvert replacement	Planned	2027		0	$0 to $10 million	Planning/EA underway	Design-Bid-Build
149	Rehab	2027	North, West	Not applicable	Kasabonika Modular Bridge, Kasabonika Remote Northern Airport	Bridge replacement	Planned	2027	2024-6007	0	$0 to $10 million	Design underway	Design-Bid-Build
150	Rehab	2027	North, West	808	Otoskwin River Bridge, 60 km north of Hwy 599, north of Pickle Lake	Bridge replacement	Planned	2027	2027-6011	0	$10 to $25 million	Planning/EA upcoming	Design-Bid-Build
151	Rehab	2027	North, West	17	Ruby and Fire Hill Creek Culverts, 4 and 10 km east of Hwy 11, east of Nipigon	Culvert rehabilitation	Planned	2027	2027-6012	0	$0 to $10 million	Design underway	Design-Bid-Build
152	Rehab	2027	North, West	11	Omer Lake Culvert, 46 km north of Hwy 17, Greenstone	Culvert replacement	Planned	2027	2025-6013	0	$0 to $10 million	Design complete	Design-Bid-Build
153	Rehab	2028-2029	North, East	534	Steels Creek Culvert, 11.8 km west of Hwy 654, Nipissing	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
154	Rehab	2028-2029	North, East	533	11 km north of the junction of Hwy 656, northerly, Mattawa	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
155	Rehab	2028-2029	North, East	518	Kearney Rd. to Star Lake Rd., Emsdale	Resurfacing	Planned	2028-2029		8.1	$0 to $10 million	Design upcoming	Design-Bid-Build
156	Rehab	2028-2029	North, East	141, 632	4.4 km west of Rosseau River Bridge westerly, Rosseau	Resurfacing	Planned	2028-2029		19.1	$25 to $50 million	Design in procurement	Design-Bid-Build
157	Rehab	2028-2029	North, East	17	Rest area, Agawa Bay	New facility	Planned	2028-2029		0	$0 to $10 million	Design upcoming	Design-Bid-Build
158	Rehab	2028-2029	North, East	124	North junction of Hwy 11 to Goreville Rd., north of South River	Resurfacing	Planned	2028-2029		5.2	$0 to $10 million	Design upcoming	Design-Bid-Build
159	Rehab	2028-2029	North, East	6	Wakawagami Creek, Manitowaning	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design upcoming	Design-Bid-Build
160	Rehab	2028-2029	North, East	805	Azen Creek Culvert and Mud Lake Culvert, north of Hwy 539, River Valley	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
161	Rehab	2028-2029	North, East	522	8.2 km west of Hwy 524 to 26.2 km west of Hwy 524, Commanda	Resurfacing	Planned	2028-2029		18	$10 to $25 million	Design in procurement	Design-Bid-Build
162	Rehab	2028-2029	North, East	624, 66	Quebec-Ontario provincial border to 2.3 km west of Hwy 624, Virginiatown	Resurfacing	Planned	2028-2029		21	$10 to $25 million	Design in procurement	Design-Bid-Build
163	Rehab	2028-2029	North, East	11	17.2 km north of Hwy 64 to 0.2 km south of Wilson Lake Rd., north of Marten River	Resurfacing	Planned	Not available		10.2	$10 to $25 million	Design upcoming	Design-Bid-Build
164	Rehab	2028-2029	North, East	17	Junction Creek Bridge, 8.9 km west of Sudbury Municipal Rd. 80 Middle Interchange	Bridge replacement	Planned	Not available	2026-5023	0	$10 to $25 million	Design underway	Design-Bid-Build
165	Rehab	2028-2029	North, East	To be assigned	Portage Creek Bridge, north of MacTier	Bridge replacement	Planned	2028-2029		0	$10 to $25 million	Design underway	Design-Bid-Build
166	Rehab	2028-2029	North, East	400, To be assigned	Mill Lake Bridge northerly 16.3 km, Parry Sound	Resurfacing	Planned	2028-2029		17.9	$25 to $50 million	Design in procurement	Design-Bid-Build
167	Rehab	2028-2029	North, East	637, To be assigned	Wanapitei River Bridge and Mahzenazing River Bridge, Wanup	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
168	Rehab	2028-2029	North, East	101	Groundhog River and Cripple Creek, east of Foleyet	Bridge replacement, Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
169	Rehab	2028-2029	North, East	579	Clute Creek Culvert #2 13 km north of Hwy 11 and culvert 3.3 km north of Hwy 11, Cochrane	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
170	Rehab	2028-2029	North, East	17	Root River Culverts, north of Hwy 7045, Sault Ste. Marie	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design upcoming	To be determined
171	Rehab	2028-2029	North, East	11, 520	1 km north of Hwy 520 northerly 8.7 km, Burk's Falls	Resurfacing	Planned	2028-2029		8.7	$10 to $25 million	Design underway	Design-Bid-Build
172	Rehab	2028-2029	North, East	535, 64	Hwy 528 northerly 21.7 km and Hwy 535 from Hwy 64 northerly 2.1 km, Noelville	Resurfacing, Paved shoulders	Planned	2028-2029		23.8	$10 to $25 million	Design underway	Design-Bid-Build
173	Rehab	2028-2029	North, East	631	Nagagamisis Lake Bridge northerly 31.2 km, Hornepayne	Resurfacing	Planned	2028-2029		31.2	$0 to $10 million	Design underway	Design-Bid-Build
174	Rehab	2028-2029	North, East	400	CNR Overhead Bridges 0.9 km south of Hwy 141,  Humphrey	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design upcoming	Design-Bid-Build
175	Rehab	2028-2029	North, East	101	Black River Bridge, 0.7 km north of Hwy 11, Matheson	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design upcoming	Design-Bid-Build
176	Rehab	2028-2029	North, East	63	North Bay to 16.8 km south of Hwy 533, North Bay	Culvert replacement, Resurfacing	Planned	2028-2029		18.7	$10 to $25 million	Design upcoming	Design-Bid-Build
177	Rehab	2028-2029	North, East	17	Mattawa to 7.9 km east of Hwy 630, Mattawa	Resurfacing	Planned	2028-2029		12.2	$0 to $10 million	Design upcoming	Design-Bid-Build
178	Rehab	2028-2029	North, East	11	Hwy 66 to 3.5 km south of Hwy 570, Kenogami Lake	Resurfacing	Planned	2028-2029		11.4	$10 to $25 million	Design upcoming	Design-Bid-Build
179	Rehab	2028-2029	North, East	11	Sand Dam Rd. northerly to Ellsmere Rd., North Bay	Safety improvements, Resurfacing, Passing lane, Paved shoulders, New bridge, New culvert	Planned	Not available		13.8	$100 to $250 million	Design underway	Design-Bid-Build
180	Rehab	2028-2029	North, East	101	East of north junction Hwy 101 easterly, east of Chapleau	Resurfacing	Planned	2028-2029		21.8	$10 to $25 million	Design underway	Design-Bid-Build
181	Rehab	2028-2029	North, East	520	North Creek Bridge, 3 km west of Hwy 11, Magnetawan	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
182	Rehab	2028-2029	North, East	11, To be assigned	1 km north of Stirling Creek Rd. to Muskoka Rd. overpass, Sundridge	Resurfacing	Planned	2028-2029		9	$0 to $10 million	Design underway	Design-Bid-Build
183	Rehab	2028-2029	North, East	124	West junction of Hwy 520 to McKellar	Resurfacing	Planned	2028-2029		17.8	$25 to $50 million	Design upcoming	Design-Bid-Build
184	Rehab	2028-2029	North, East	518, 592	Star Lake Rd. to the junction of Hwy 11/518 and Deer Lake Rd. to the north junction of Hwy 11, Emsdale	Resurfacing	Planned	2028-2029		4.3	$0 to $10 million	Design upcoming	Design-Bid-Build
185	Rehab	2028-2029	North, East	To be assigned	Pickeral River Bridge, Bigwood	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
186	Rehab	2028-2029	North, East	17, To be assigned	East junction of Regional Rd. 55 to Hwy 69, Sudbury	Resurfacing	Planned	Not available		12.5	$10 to $25 million	Design upcoming	Design-Bid-Build
187	Rehab	2028-2029	North, East	6	South Baymouth northerly 23.8 km	Resurfacing	Planned	2028-2029		23.8	$10 to $25 million	Design underway	Design-Bid-Build
188	Rehab	2028-2029	North, East	101	Salve (Painkiller) Creek Bridge, Matheson	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
189	Rehab	2028-2029	North, East	101	ONR crossing easterly, Timmins	Resurfacing	Planned	2028-2029		17.3	$10 to $25 million	Design upcoming	Design-Bid-Build
190	Rehab	2028-2029	North, East	112	Murdock Creek and unnamed culvert, 5.8 km south of Hwy 66, Kirkland Lake	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Planning/EA in procurement	To be determined
191	Rehab	2028-2029	North, East	11	Unnamed culvert, 3.4 km north of Hwy 560, Englehart	Culvert rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
192	Rehab	2028-2029	North, East	569	Moose Creek Culvert, Couttsville	Culvert rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design underway	Design-Bid-Build
193	Rehab	2028-2029	North, East	101, 129	Hwy 129 from north junction of Hwy 101 northerly to Chapleau and Hwy 101 from the south junction of Hwy 129 easterly and Poulin Creek Culvert, Chapleau	Culvert replacement, Resurfacing	Planned	2028-2029		35.1	$25 to $50 million	Design underway	Design-Bid-Build
194	Rehab	2028-2029	North, East	11	Net Lake Bridge, Temagami	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
195	Rehab	2028-2029	North, East	655	14 km south of Hwy 11 to Hwy 11, Driftwood	Resurfacing	Planned	Not available		14	$10 to $25 million	Design underway	Design-Bid-Build
196	Rehab	2028-2029	North, East	11	6.5 km to 18.3 km north of Hwy 570, Sesekinika	Resurfacing	Planned	2028-2029		11.8	$10 to $25 million	Design upcoming	To be determined
197	Rehab	2028-2029	North, East	11	Driftwood to 2.9 km north of Hwy 634, Smooth Rock Falls	Resurfacing, Paved shoulders	Planned	Not available		25.9	$25 to $50 million	Design underway	Design-Bid-Build
198	Rehab	2028-2029	North, East	11	Hwy 663 to 7.7 km east of Hwy 631, Calstock	Resurfacing, Paved shoulders	Planned	2028-2029		21.1	$10 to $25 million	Design underway	Design-Bid-Build
199	Rehab	2028-2029	North, East	69	North junction of Hwy 529 to 3.4 km north of Hwy 522, Still River	Resurfacing, Intersection improvements	Planned	Not available		18	$25 to $50 million	Design underway	Design-Bid-Build
200	Rehab	2028-2029	North, East	60	Renfrew-Nipissing boundary to Hwy 523, Madawaska	Resurfacing, Paved shoulders	Planned	Not available		13.5	$10 to $25 million	Design upcoming	Design-Bid-Build
201	Rehab	2028-2029	North, East	6	CPR Swing Bridge (North Channel), north of Little Current	Bridge replacement	Planned	Not available		0	$100 to $250 million	Design underway	Construction Manager General Contractor
202	Rehab	2028-2029	North, East	63	16.7 km south of Hwy 533 northerly, Balsam Creek	Resurfacing	Planned	2028-2029		17.8	$0 to $10 million	Design upcoming	Design-Bid-Build
203	Rehab	2028-2029	North, East	562	Unknown creek culvert, 4.9 km west of Hwy 11, Earlton	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Design in procurement	Design-Bid-Build
204	Rehab	2028-2029	North, East	11	Poplar Rapids River Bridge, 13.5 km west of Hwy 634, Smooth Rock Falls	Bridge replacement	Planned	2028-2029	2024-5008	0	$10 to $25 million	Design underway	Design-Build
205	Rehab	2028-2029	North, East	17	Garden River Bridge, Root River Bridge, Echo Bay Bridge, Garden River	Bridge rehabilitation	Planned	2028-2029		0	$10 to $25 million	Design underway	Design-Bid-Build
206	Rehab	2028-2029	North, East	101, 129	South junction of Hwy 129 westerly to Lawson Lake, Chapleau	Resurfacing, Culvert replacement	Planned	2028-2029		27	$25 to $50 million	Design underway	Design-Bid-Build
207	Rehab	2028-2029	North, West	71	10 km south of Hwy 17 southerly, Sioux Narrows - Nestor Falls	Reconstruction, Paved shoulders	Planned	2028-2029	2025-6001	27.9	$10 to $25 million	Design underway	Design-Bid-Build
208	Rehab	2028-2029	North, West	502	Hwy 17 southerly to Hwy 594, Dryden	Reconstruction	Planned	2028-2029		3	$0 to $10 million	Planning/EA underway	Design-Bid-Build
209	Rehab	2028-2029	North, West	17	West of Peninsula Rd. easterly, Marathon	Resurfacing, Paved shoulders	Planned	2028-2029		17.8	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
210	Rehab	2028-2029	North, West	71	Nestor Falls Bridge, 36.0 km north of Hwys 600 and 615, Sioux Narrows - Nestor Falls	Bridge replacement	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
211	Rehab	2028-2029	North, West	17	5.0 km west of Little Pic River Bridge westerly, east of Terrace Bay	Resurfacing, Truck climbing lane, Paved shoulders	Planned	Not available		25.9	$10 to $25 million	Planning/EA upcoming	To be determined
212	Rehab	2028-2029	North, West	11	Postagoni River Culvert, 26 km west of Hwy 580, Greenstone	New bridge	Planned	2028-2029		0	$10 to $25 million	Planning/EA underway	To be determined
213	Rehab	2028-2029	North, West	17	Hwy 17, from 1.0 km east of Hwy 72 at Dinorwic westerly, Dryden	Resurfacing	Planned	2028-2029	2026-6004	30	$10 to $25 million	Planning/EA underway	Design-Bid-Build
214	Rehab	2028-2029	North, West	11, 17, 595, 614	Hawk Lake Subway, Sitch Creek Culvert # 3, Maki Creek Culvert, Little Ozone Creek Culvert, Barbara Creek Culvert, east of Kenora, Gillies, north and east of Nipigon, south of Manitouwadge	Bridge rehabilitation, Culvert rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	To be determined
215	Rehab	2028-2029	North, West	11	Noden Causeway structures, 20, 21 and 22 km west of Hwy 502, east of Fort Frances	Bridge rehabilitation	Planned	2028-2029		0	$10 to $25 million	Planning/EA upcoming	Design-Bid-Build
216	Rehab	2028-2029	North, West	11, 11B, 622	West of Hwy 11B easterly, Hwy 11B and Hwy 622 northerly, Atikokan	Resurfacing, Paved shoulders	Planned	2028-2029		28.4	$10 to $25 million	Planning/EA upcoming	Design-Bid-Build
217	Rehab	2028-2029	North, West	582	Bruner Creek Culvert, 5 km south of Hwy 11/17 east junction, north of Dorion	Culvert replacement	Planned	2028-2029	2026-6010	0	$0 to $10 million	Planning/EA underway	To be determined
218	Rehab	2028-2029	North, West	105	26 km north of Hwy 657 northerly, Ear Falls, north of Ear Falls	Resurfacing	Planned	2028-2029		25.9	$10 to $25 million	Planning/EA underway	Design-Bid-Build
219	Rehab	2028-2029	North, West	17	Little Firesteel River Bridge, 13 km west of Upsala, east of Ignace	Bridge replacement	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
220	Rehab	2028-2029	North, West	17	Gravel River Bridge, 24 km west of Rossport, east of Nipigon	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA underway	Design-Bid-Build
221	Rehab	2028-2029	North, West	11	Blackwater River Bridge westerly, Greentstone	Paved shoulders, Resurfacing	Planned	2028-2029		29	$10 to $25 million	Planning/EA upcoming	Design-Bid-Build
222	Rehab	2028-2029	North, West	11	West of Hwy 613 westerly, La Vallee, Emo, Chapple	Resurfacing, Paved shoulders	Planned	2028-2029	2026-6012	24	$10 to $25 million	Design upcoming	Design-Bid-Build
223	Rehab	2028-2029	North, West	17	Hwy 622 westerly to 3 km east of Hwy 603, west of Ignace	Resurfacing	Planned	2028-2029		19.2	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
224	Rehab	2028-2029	North, West	17	East of Hwy 105 at Vermilion Bay westerly, Machin	Resurfacing	Planned	2028-2029	2026-6013	35.1	$50 to $100 million	Design upcoming	Design-Bid-Build
225	Rehab	2028-2029	North, West	61	Kaministiquia River Bridge, 7 km south of Hwy 11/17, Thunder Bay	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA underway	Design-Bid-Build
226	Rehab	2028-2029	North, West	102, 11	West of Hwy 589 westerly to Hwy 11/17, Thunder Bay, Oliver Paipoonge, north of Conmee	Resurfacing	Planned	2028-2029		26.1	$0 to $10 million	Planning/EA underway	To be determined
227	Rehab	2028-2029	North, West	11	Wolf River Bridge, 4.0 km west of Hwy 582 south junction, Dorion	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA underway	Design-Bid-Build
228	Rehab	2028-2029	North, West	71	Nestor Falls southerly, Sioux Narrows - Nestor Falls, Chapple	Resurfacing, Paved shoulders	Planned	2028-2029		28.6	$10 to $25 million	Planning/EA upcoming	To be determined
229	Rehab	2028-2029	North, West	17	CPKC and Hwy 641 overhead, west of Kenora	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
230	Rehab	2028-2029	North, West	17	26 km east of Hwy 11 easterly including Dublin Creek Culvert, east of Nipigon	Realignment, Culvert replacement, Safety improvements	Planned	2028-2029		1.6	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
231	Rehab	2028-2029	North, West	593	Little Whitefish River Modular and Arrow River Bridges, 16 and 19 km south of Hwy 588, west of Neebing	Bridge rehabilitation, Bridge replacement	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	To be determined
232	Rehab	2028-2029	North, West	17	West junction of 17/17A westerly to Rush Bay Rd., west of Kenora	Resurfacing	Planned	2028-2029		24	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
233	Rehab	2028-2029	North, West	582	Morrow Creek Culvert, 3.0 km east of Hwy 11/17 & 582 west junction, north of Dorion	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	To be determined
234	Rehab	2028-2029	North, West	525	Pistol Lake Culvert, north of Hwy 596, northwest of Kenora	Culvert replacement	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	To be determined
235	Rehab	2028-2029	North, West	11	Cochrane/Thunder Bay District Boundary westerly, east of Greenstone	Resurfacing, Paved shoulders	Planned	2028-2029		45.3	$10 to $25 million	Planning/EA upcoming	Design-Bid-Build
236	Rehab	2028-2029	North, West	595	Pine River Bridge, west of Hwy 597, Neebing	Bridge rehabilitation	Planned	2028-2029	2027-6007	0	$0 to $10 million	Design in procurement	Design-Bid-Build
237	Rehab	2028-2029	North, West	11	23 km east of Hwy 580 at Beardmore easterly, Greenstone	Resurfacing, Paved shoulders	Planned	2028-2029		27.4	$10 to $25 million	Planning/EA upcoming	To be determined
238	Rehab	2028-2029	North, West	11	12 km west Hwy 802 westerly, east of Atikokan	Resurfacing, Paved shoulders	Planned	2028-2029		29.8	$10 to $25 million	Planning/EA upcoming	To be determined
239	Rehab	2028-2029	North, West	11	Mine Centre westerly to Hwy 502, east of Fort Frances	Resurfacing, Paved shoulders	Planned	2028-2029		36.4	$10 to $25 million	Planning/EA upcoming	Design-Bid-Build
240	Rehab	2028-2029	North, West	17	Baker Creek and English River Culverts, 26 and 30 km west of Upsala, east of Ignace	Culvert rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	To be determined
241	Rehab	2028-2029	North, West	105	Hwy 618 southerly, Red Lake	Reconstruction	Planned	2028-2029	2025-6025	17	$0 to $10 million	Planning/EA underway	Design-Bid-Build
242	Rehab	2028-2029	North, West	599	Hwy 17 at Ignace northerly to English River Bridge, north of Ignace	Reconstruction	Planned	2028-2029		32.5	$0 to $10 million	Planning/EA underway	Design-Bid-Build
243	Rehab	2028-2029	North, West	599	Savant Lake CNR crossing northerly, north of Ignace	Reconstruction	Planned	2028-2029		38	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build
244	Rehab	2028-2029	North, West	599	North limit of Mishkeegogamang First Nation northerly to Pickle Lake	Reconstruction	Planned	2028-2029		24	$0 to $10 million	Design in procurement	Design-Bid-Build
245	Rehab	2028-2029	North, West	584	10 km north of Geraldton northerly, Greenstone	Reconstruction	Planned	2028-2029		27	$10 to $25 million	Planning/EA underway	Design-Bid-Build
246	Rehab	2028-2029	North, West	614	Manitouwadge southerly	Resurfacing	Planned	2028-2029		25.8	$0 to $10 million	Planning/EA upcoming	To be determined
247	Rehab	2028-2029	North, West	17	13 km west of Upsala westerly, east of Ignace	Resurfacing, Paved shoulders	Planned	2028-2029		35.3	$10 to $25 million	Planning/EA upcoming	To be determined
248	Rehab	2028-2029	North, West	811	Mooseland River Bridge, 31 km west of Hwy 527, north of Thunder Bay	Bridge rehabilitation	Planned	2028-2029		0	$0 to $10 million	Planning/EA upcoming	Design-Bid-Build