  "fields": [{"id":"_id","type":"int"},{"id":"Program Type","type":"text","info":{"notes":"Identifies whether the project is Rehabilitation or Expansion.\r\n","type_override":"text","frictionless_dict":[{"type":"string","name":"Program Type"}]}},{"id":"Start Year","type":"text","info":{"notes":"Year the project started or is scheduled to start.","type_override":"text","frictionless_dict":[{"type":"string","name":"Start Year"}]}},{"id":"Region","type":"text","info":{"notes":"Geographic area the project resides.","type_override":"text","frictionless_dict":[{"type":"string","name":"Region"}]}},{"id":"Highway","type":"text","info":{"notes":"Highway number(s).","type_override":"text","frictionless_dict":[{"type":"string","name":"Highway"}]}},{"id":"Location","type":"text","info":{"notes":"Where on the highway the project is occurring.","type_override":"text","frictionless_dict":[{"type":"string","name":"Location"}]}},{"id":"Type Of Work","type":"text","info":{"notes":"Kind of work being performed.","type_override":"text","frictionless_dict":[{"type":"string","name":"Type Of Work"}]}},{"id":"Highway Program Status","type":"text","info":{"notes":"Status of the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Highway Program Status"}]}},{"id":"Target Completion","type":"text","info":{"notes":"Year the project was completed or is scheduled to be completed.","type_override":"text","frictionless_dict":[{"type":"string","name":"Target Completion"}]}},{"id":"Contract #","type":"text","info":{"notes":"Contract # associated to the project.\r\n","type_override":"text","frictionless_dict":[{"type":"string","name":"Contract #"}]}},{"id":"Project Length (kilometers)","type":"text"},{"id":"Estimated Cost Range","type":"text","info":{"notes":"Value of the project within defined dollar ranges.","type_override":"text","frictionless_dict":[{"type":"string","name":"Estimated Cost Range"}]}},{"id":"Engineering Status","type":"text","info":{"notes":"Status of the engineering component of the project.","type_override":"text","frictionless_dict":[{"type":"string","name":"Engineering Status"}]}},{"id":"Delivery Method","type":"text","info":{"notes":"Type of delivery method of the project.","type_override":"","frictionless_dict":[{"type":"string","name":"Delivery Method"}]}}],
  "records": [
    [1,"Expansion","Upcoming Expansion","North, East","69","North of the north junction of Hwy 529, northerly, Britt","Two to four-lane widening","Planned","Not available",null,"20.4","$250 to $500 million","Design underway","To be determined"],
    [2,"Expansion","Upcoming Expansion","North, East","69","Patrol yard on Hwy 529 interchange, Pointe Au Baril","New facility","Planned","Not available",null,"0","$10 to $25 million","Design upcoming","To be determined"],
    [3,"Expansion","Upcoming Expansion","North, East","69","Hwy 69 connection to Sudbury Southeast Bypass, Sudbury","Two to four-lane widening","Planned","Not available",null,"6.2","$100 to $250 million","Design upcoming","To be determined"],
    [4,"Expansion","Upcoming Expansion","North, East","69","South junction of Hwy 529 northerly, Pointe au Baril","Two to four-lane widening, New bridge, New culvert","Planned","Not available",null,"15","$100 to $250 million","Design upcoming","To be determined"],
    [5,"Expansion","Upcoming Expansion","North, East","69","South of Hwy 7182 (Shebeshegong Rd.), northerly, Shawanaga","Two to four-lane widening","Planned","Not available",null,"5","$100 to $250 million","Design upcoming","To be determined"],
    [6,"Expansion","Upcoming Expansion","North, East","69","South of north junction of Hwy 529 northerly, Pointe au Baril","Two to four-lane widening","Planned","Not available",null,"7.5","$100 to $250 million","Design upcoming","To be determined"],
    [7,"Expansion","Upcoming Expansion","North, East","652","Cochrane Bypass, extension of Hwy 652, Genier Rd. to Hwy 11, Cochrane","New two-lane highway","Planned","Not available",null,"4.5","$25 to $50 million","Design underway","To be determined"],
    [8,"Expansion","Upcoming Expansion","North, East","69","North of Hwy 559, northerly, Nobel","Two to four-lane widening","Planned","Not available",null,"12.2","$100 to $250 million","Design in procurement","To be determined"],
    [9,"Expansion","Upcoming Expansion","North, East","69","North Hwy 7182 (Shebeshegong Rd.), northerly, Pointe au Baril","Two to four-lane widening","Planned","Not available",null,"11","$100 to $250 million","Design upcoming","To be determined"],
    [10,"Expansion","2026","North, West","11, 17","McGuire Rd. westerly to Coughlin Rd. including Black Sturgeon River Bridges, Red Rock","Two to four-lane widening, New bridge, Bridge removal, Illumination","Underway","2029","2024-6011","5","$50 to $100 million","Design complete","Design-Bid-Build"],
    [11,"Expansion","2027","North, West","11, 17","Pearl Lake easterly to west of CPKC overhead at Ouimet, Shuniah","Two to four-lane widening","Planned","Not available",null,"7.6","$100 to $250 million","Design underway","Design-Bid-Build"],
    [12,"Expansion","2027","North, West","17","West of Hwy 673 easterly including Moth Lake culverts, west of Kenora","Two to four-lane widening, New culvert, Illumination","Planned","Not available","2024-6013","11","$100 to $250 million","Planning/EA underway","Design-Bid-Build"],
    [13,"Expansion","2028-2029","North, West","11, 17","East of junction Hwy 582 westerly to Dorion East Loop Rd. including Coldwater Creek and Wolf River Bridges, Dorion","New bridge, Two to four-lane widening","Planned","Not available",null,"12.1","$100 to $250 million","Design underway","Design-Bid-Build"],
    [14,"Rehab","2023","North, East","17","Thessalon to Iron Bridge","Culvert replacement, Resurfacing, Intersection improvements, Culvert rehabilitation","Underway","2026","2023-5001","33.3","$25 to $50 million","Design complete","Design-Build"],
    [15,"Rehab","2024","North, East","11","Birches Rd. overpasses and CNR overheads, south of North Bay","Bridge rehabilitation","Underway","2026","2024-5012","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [16,"Rehab","2024","North, East","11","ONR overhead, Earlton","Bridge replacement","Underway","2026","2024-5009","0","$25 to $50 million","Design complete","Design-Bid-Build"],
    [17,"Rehab","2024","North, East","101","Mattawasaga River Bridge and Ghost River Bridge, east of Matheson","Bridge rehabilitation","Underway","2026","2024-5007","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [18,"Rehab","2024","North, East","11","Kapuskasing easterly to west of Fauquier","Resurfacing, Culvert rehabilitation, Paved shoulders","Underway","2026","2023-5095","24.8","$25 to $50 million","Design complete","Design-Bid-Build"],
    [19,"Rehab","2024","North, East","592","Little East River Bridge, north of Hwy 11, Novar","Bridge replacement","Underway","2026","2024-5014","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [20,"Rehab","2025","North, East","11","Earlton Fire Memorial Rest Area","Rest area","Underway","2026","2025-5007","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [21,"Rehab","2025","North, East","To be assigned","Spanish River Bridge, Massey","Bridge rehabilitation","Underway","2026","2025-5075","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [22,"Rehab","2025","North, East","69","3.2 km south of Hwy 637 to 2.3 km south of Nelson Rd., Sudbury","Resurfacing","Underway","2026","2025-5013","12.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [23,"Rehab","2025","North, East","64","Holdridge Creek Bridge, Martin River","Bridge replacement","Underway","2026","2025-5006","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [24,"Rehab","2025","North, East","17, 17B","Garden River to Echo Bay","Resurfacing","Underway","2027","2023-5007","18","$50 to $100 million","Design complete","Design-Bid-Build"],
    [25,"Rehab","2025","North, East","17","Sault Ste. Marie to Heyden","Culvert rehabilitation, Resurfacing, Paved shoulders, Safety improvements","Underway","2026","2024-5114","14.5","$25 to $50 million","Design complete","Design-Bid-Build"],
    [26,"Rehab","2025","North, East","69","Hwy 400 northerly to north of Hwy 7182, Shawanaga southerly","Bridge rehabilitation, Resurfacing, Intersection improvements","Underway","2027","2025-5014","19.6","$25 to $50 million","Design complete","Design-Bid-Build"],
    [27,"Rehab","2025","North, East","17","Hwy 69 overpass, eastbound and westbound lanes, Sudbury","Bridge rehabilitation","Underway","2026","2025-5010","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [28,"Rehab","2025","North, East","546","Kindiogami River Bridge, Camp 8 Creek Bridge, Skunk Creek Bailey Bridge, Little White River Bridge, north of Elliot Lake","Bridge rehabilitation, Bridge replacement","Underway","2026","2024-5024","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [29,"Rehab","2026","North, East","101","0.3 km west of Lawson Lake Culvert to 2.2 km west of Hwy 651, Chapleau","Resurfacing","Planned","2026","2026-5013","38.6","$0 to $10 million","Design complete","Design-Bid-Build"],
    [30,"Rehab","2026","North, East","17","East Baldhead Bridge and West Baldhead Bridge, south of Wawa","Bridge replacement","Planned","2027","2026-5017","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [31,"Rehab","2026","North, East","144","22.8 km north of Hwy 661 to Kenogamissi Falls Rd., north of Gogama","Resurfacing","Planned","2026","2026-5048","20.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [32,"Rehab","2026","North, East","101","3.1 km east of former ONR crossing to 0.2 km west of Kidd Met Site Rd., Timmins","Resurfacing","Planned","2027","2026-5064","6.6","$0 to $10 million","Design complete","Design-Bid-Build"],
    [33,"Rehab","2026","North, East","67","Main St. to end of highway, Iroquois Falls","Resurfacing","Underway","2026","2026-5020","0.7","$0 to $10 million","Design complete","Design-Bid-Build"],
    [34,"Rehab","2026","North, East","11","9.6 km south of Hwy 534 northerly 4.6 km, Trout Creek","Bridge rehabilitation, Resurfacing, Culvert rehabilitation","Planned","2028-2029","2026-5011","4.6","$10 to $25 million","Design underway","Design-Bid-Build"],
    [35,"Rehab","2026","North, East","592","Little East River Bridges 2, 3 and 4 north of Hwy 11, Novar","Bridge replacement","Planned","2028-2029","2025-5141","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [36,"Rehab","2026","North, East","11","Jacobs Hill Rd. northerly 20.5 km, Nellie Lake","Culvert replacement, Resurfacing, Paved shoulders","Planned","2027","2026-5015","20.5","$10 to $25 million","Design complete","Design-Bid-Build"],
    [37,"Rehab","2026","North, East","17, 548","Stobie Creek Bridge, Richardson Creek Bridge and Walker Creek Culvert, Richards Landing","Bridge replacement, Culvert rehabilitation","Underway","2028","2026-5018","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [38,"Rehab","2026","North, East","17","1 km east of Hwy 548 westerly 16.5 km, Echo Bay","Resurfacing, Bridge rehabilitation, Bridge replacement","Underway","2028","2026-5019","16.5","$25 to $50 million","Design complete","Design-Bid-Build"],
    [39,"Rehab","2026","North, East","559","Hwy 400 westerly to end of hwy, north of Nobel","Resurfacing, Paved shoulders","Underway","2027","2024-5020","17.4","$10 to $25 million","Design complete","Design-Bid-Build"],
    [40,"Rehab","2026","North, East","17","Laronde Creek Bridge to Sturgeon Falls east limits","Resurfacing","Underway","2026","2026-5038","15.2","$0 to $10 million","Design complete","Design-Bid-Build"],
    [41,"Rehab","2026","North, East","652","Lawagamau River Bridge, Floodwood River Bridge and Little Abitibi River Bridge, north of Cochrane","Bridge replacement","Underway","2027","2026-5001","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [42,"Rehab","2026","North, East","575, 64","Sturgeon Falls to Field","Resurfacing, Culvert replacement","Underway","2028","2026-5009","22.1","$10 to $25 million","Design complete","Design-Bid-Build"],
    [43,"Rehab","2026","North, East","124, 520","Whitestone Lake Bridge at Dunchurch and Whitestone River Bridge at Whitestone","Bridge rehabilitation","Planned","2027","2025-5012","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [44,"Rehab","2026","North, East","101","Hwy 547 westerly 9 km, Wawa","Resurfacing","Underway","2026","2023-5096","9","$0 to $10 million","Design complete","Design-Bid-Build"],
    [45,"Rehab","2026","North, East","101","Hwy 144 easterly to Government Rd., Timmins westerly","Resurfacing, Culvert replacement","Underway","2027","2026-5008","16.1","$10 to $25 million","Design complete","Design-Bid-Build"],
    [46,"Rehab","2026","North, East","17","10.2 km east of Hwy 108, easterly 22 km, Spanish","Resurfacing, Culvert replacement, Bridge rehabilitation","Planned","2028-2029","2026-5022","22","$25 to $50 million","Design complete","Design-Bid-Build"],
    [47,"Rehab","2024","North, West","72","Hwy 17 northerly to 3 km north of Kathlyn Lake Rd., south of Sioux Lookout","Resurfacing","Underway","2026","2024-6001","35.5","$25 to $50 million","Design complete","Design-Bid-Build"],
    [48,"Rehab","2024","North, West","11, 17","Polemounted variable message signs, various locations (15), Nipigon to Fort Frances, Dryden to Kenora","Signage rehabilitation","Underway","2026","2023-6067","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [49,"Rehab","2025","North, West","11, 61","Various intersections and locations, east of Balsam St. southerly to Harbour Expressway and Hwy 61 southerly, Thunder Bay","Resurfacing, Intersection improvements","Underway","2027","2023-6007","15.7","$25 to $50 million","Design complete","Design-Bid-Build"],
    [50,"Rehab","2025","North, West","584","Various locations (14), 27 km north of Hwy 11, northerly 11 km, Greenstone","Culvert replacement","Underway","2026","2025-6016","0","$0 to $10 million","Design complete","Single Source"],
    [51,"Rehab","2025","North, West","602","Lyon Creek Culvert No 1, 1.0 km south of Hwy 11, Emo","Culvert replacement","Underway","2026","2023-6036","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [52,"Rehab","2025","North, West","17","New rest area building, Terrace Bay","New facility","Underway","2026","2024-6021","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [53,"Rehab","2025","North, West","582, 589, 591","Hwy 591, from Hwy 589 to end of Hwy and Hwy 589, from Goodman Lake Rd. to Two Islands Lake Rd., north of Thunder Bay","Resurfacing","Underway","2026","2025-6058","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [54,"Rehab","2025","North, West","17, 614, 627","Various locations between Nipigon and White River","Culvert replacement","Underway","2026","2025-6032","0","$0 to $10 million","Design complete","Single Source"],
    [55,"Rehab","2025","North, West","17, 614","Various locations between Nipigon and White River","Culvert replacement","Underway","2026","2025-6033","0","$0 to $10 million","Design complete","Single Source"],
    [56,"Rehab","2025","North, West","61","Pigeon River Bridge at Canada/USA International Border, Neebing","Bridge rehabilitation","Underway","2026","2024-6015","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [57,"Rehab","2025","North, West","11","Angle Creek and Partridge Lake Culverts, 7 km east of Hwy 580 and 32 km west of Hwy 584, Greenstone","Culvert rehabilitation","Underway","2026","2025-6022","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [58,"Rehab","2025","North, West","17","8 km west of Schreiber westerly including Hewitson Creek Culvert","Culvert replacement, Realignment","Underway","2027","2025-6024","3.8","$25 to $50 million","Design complete","Design-Bid-Build"],
    [59,"Rehab","2026","North, West","622","Seine River Bridge, 21 km north of Hwy 11B, north of Atikokan","Bridge rehabilitation","Underway","2027","2025-6002","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [60,"Rehab","2026","North, West","17","West of Schreiber and Terrace Bay municipality limit","Hazard rock removal","Underway","2026","2024-6045","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [61,"Rehab","2026","North, West","61","Slate River Tributary Culvert, 2.0 km south of Hwy 130, Neebing","Culvert replacement","Underway","2026","2025-6065","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [62,"Rehab","2026","North, West","527, 582","Hwy 527 from Kopka River Bridge northerly and Hwy 582 from Hwy 11/17 west junction easterly, north of Shuniah,  east of Dorion","Resurfacing","Planned","2027","2026-6031","43.9","$0 to $10 million","Design complete","Design-Bid-Build"],
    [63,"Rehab","2026","North, West","671","24 km north of Hwy 17A northerly, north of Kenora","Safety improvements, Guide rail improvements, Realignment","Underway","2026","2025-6054","1.5","$0 to $10 million","Design complete","Design-Bid-Build"],
    [64,"Rehab","2026","North, West","17","East of Hwy 631 westerly, White River","Resurfacing, Paved Shoulders","Planned","2028-2029","2025-6003","52.3","$25 to $50 million","Design underway","Design-Bid-Build"],
    [65,"Rehab","2026","North, West","130","Twin City Cross Rd. and Arthur St. intersection, Oliver Paipoonge","Intersection improvements","Planned","2027","2023-6019","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [66,"Rehab","2026","North, West","11","Windy Point Bridge, 11 km west of Hwy 502, east of Fort Frances","Bridge rehabilitation","Underway","2026","2026-6033","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [67,"Rehab","2026","North, West","17","Schreiber to Terrace Bay","Resurfacing","Planned","2026","2026-6020","16.2","$0 to $10 million","Design complete","Design-Bid-Build"],
    [68,"Rehab","2026","North, West","11","Nipigon River Bridge at Nipigon","Bridge rehabilitation","Planned","2026","2026-6014","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [69,"Rehab","2026","North, West","11","Millers Creek Culvert, 9 km west of Hwy 621, Rainy River","Culvert replacement","Underway","2026","2026-6061","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [70,"Rehab","2026","North, West","11","Wild Goose Creek and Blind Creek Culverts - eastbound lane, 6 and 7 km east of Hwy 527, Shuniah","Culvert rehabilitation","Underway","2026","2025-6010","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [71,"Rehab","2026","North, West","599","Medcalf Lake Narrows Bridge, 85 km north of Hwy 516, south of Pickle Lake","Bridge rehabilitation","Underway","2026","2025-6009","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [72,"Rehab","2026","North, West","61","Slate River Bridges, 1.0 and 7.0 km north of Hwy 608, Oliver Paipoonge, Neebing","Bridge rehabilitation","Underway","2026","2023-6010","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [73,"Rehab","2026","North, West","17","CPKC overhead at Martin, 9 km west of English River, east of Ignace","Bridge replacement","Underway","2027","2025-6011","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [74,"Rehab","2026","North, West","17","CPKC overhead, Terrace Bay","Bridge replacement","Planned","2028-2029","2022-6010","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [75,"Rehab","2026","North, West","17","McKellar and Ripple Creek Culverts, 36 and 38 km west of Marathon","Culvert rehabilitation","Underway","2026","2024-6004","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [76,"Rehab","2026","North, West","664, 72","36 km north of Hwy 17 northerly to Sioux Lookout including Ariano Bypass and Hwy 664 westerly to Hudson, Sioux Lookout","Resurfacing","Planned","2028-2029","2024-6005","49.3","$50 to $100 million","Design complete","Design-Bid-Build"],
    [77,"Rehab","2026","North, West","502","47 km north of Hwy 11 northerly, east of Fort Frances","Resurfacing","Planned","2027","2025-6008","19","$10 to $25 million","Design underway","Design-Bid-Build"],
    [78,"Rehab","2026","North, West","Not applicable","Fort Severn Modular Bridge, Fort Severn Remote Northern Airport","Bridge replacement","Underway","2027","2024-6008","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [79,"Rehab","2026","North, West","11, 17, 628","Hwy 628 from Hwy 11/17 easterly, Red Rock, Hwy 11/17 from 2.0 km west of Hwy 11 westerly, Nipigon and Hwy 17 from 48 km east of Hwy 11 easterly, west of Schreiber","Resurfacing, Paved shoulders, Bridge rehabilitation","Planned","2027","2025-6012","10.5","$10 to $25 million","Design underway","Design-Bid-Build"],
    [80,"Rehab","2026","North, West","102","CPKC Kaministiquia and CNR overheads, 4 km east of Hwy 17 at Sistonen's Corners, west of Oliver-Paipoonge","Bridge rehabilitation, Bridge removal","Underway","2028","2024-6017","0","$10 to $25 million","Design complete","Design-Bid-Build"],
    [81,"Rehab","2026","North, West","11","Oliver Rd., Kakabeka to Hwy 11, Shabaqua, Oliver Paipoonge, Conmee, west of Conmee","Resurfacing, Paved shoulders","Planned","2028-2029","2025-6021","38.2","$50 to $100 million","Design underway","Design-Bid-Build"],
    [82,"Rehab","2027","North, East","553, 810","River aux Sables Bridges, Cameron Creek Bridge, north of Hwy 17, north of Massey","Bridge replacement","Planned","2028-2029","2023-5009","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [83,"Rehab","2027","North, East","17","West junction Municipal Rd. 55, west of Sudbury","Intersection improvements","Planned","2028-2029","2022-5036","0.1","$0 to $10 million","Design underway","Design-Bid-Build"],
    [84,"Rehab","2027","North, East","11","Rest area at Hwy 11, Marten River","New facility","Planned","2028-2029","2023-5010","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [85,"Rehab","2027","North, East","560","West of west junction of Hwy 65, west of Elk Lake","Culvert replacement","Planned","2027","2022-5009","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [86,"Rehab","2027","North, East","11","Straight Creek Culvert, south of Latchford","Culvert replacement","Planned","2027","2024-5002","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [87,"Rehab","2027","North, East","69","Richard Lake Creek, Sudbury","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [88,"Rehab","2027","North, East","522","Commanda Creek Bridge, Commanda","Bridge replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [89,"Rehab","2027","North, East","11, 65","Hwy 11, Hwy 11B to Roland Rd., south of New Liskeard northerly and Hwy 65, Armstrong St. northerly to north junction Hwy 11/65 at New Liskeard","Resurfacing","Planned","2028-2029",null,"18.9","$10 to $25 million","Design underway","Design-Bid-Build"],
    [90,"Rehab","2027","North, East","655","Algonquin Blvd. to 11.3 km north of Hwy 101, Timmins","Resurfacing","Planned","2027",null,"11.3","$0 to $10 million","Design underway","Design-Bid-Build"],
    [91,"Rehab","2027","North, East","101, 17","0.1 km east of Watsons Skyways Rd. to 9 km west of Hwy 547,  Catfish Creek Culvert #2 and Wawa Lake Culvert, Wawa","Resurfacing, Culvert rehabilitation","Planned","2028-2029","2027-5002","9","$25 to $50 million","Design underway","Design-Bid-Build"],
    [92,"Rehab","2027","North, East","65","Elk Lake northerly 18.5 km","Resurfacing, Culvert replacement","Planned","2028-2029","2026-5003","18.5","$10 to $25 million","Design underway","Design-Bid-Build"],
    [93,"Rehab","2027","North, East","17","Montreal River Bridge, Montreal River","Bridge replacement","Planned","Not available","2025-5005","0","$10 to $25 million","Design complete","Design-Build"],
    [94,"Rehab","2027","North, East","17","0.7 km north of Frater Rd. northerly 25.3 km, Montreal River","Resurfacing, Culvert replacement, Paved shoulders, Culvert rehabilitation","Planned","2028-2029",null,"25.3","$50 to $100 million","Design underway","Design-Bid-Build"],
    [95,"Rehab","2027","North, East","17","Everett Lake Tributary Culvert, Iron Bridge","Culvert replacement","Planned","2027","2026-5012","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [96,"Rehab","2027","North, East","To be assigned","Root River #1 Culvert and Root River #2 Culvert, Sault Ste. Marie","Culvert replacement","Planned","2027","2026-5072","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [97,"Rehab","2027","North, East","638","Bar River Bridge #1, Bar River Bridge #2 and Bar River Bridge #3, Echo Bay","Bridge replacement","Planned","2028-2029",null,"0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [98,"Rehab","2027","North, East","17","Depew River Bridge, Chain Lake Culvert, CPR overhead, South White River and South White River Bridge, south of White River","Bridge replacement, Culvert rehabilitation","Planned","Not available","2026-5070","0","$25 to $50 million","Design underway","Design-Bid-Build"],
    [99,"Rehab","2027","North, East","17","Spanish River Bridge, 8.2 km east of Hwy 6, east of McKerrow","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [100,"Rehab","2027","North, East","17","White River Rest Area","Rest area","Planned","2027",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [101,"Rehab","2027","North, East","11","Fern Glen Rd. underpass, 4.2 km south of Hwy 518, Emsdale","Bridge rehabilitation","Planned","2027","2027-5001","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [102,"Rehab","2027","North, East","17","Wawa Truck Rest Area","Rest area","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [103,"Rehab","2027","North, East","144","North of Hwy 661 northerly, north of Gogama","Resurfacing, Culvert rehabilitation","Planned","2028-2029","2026-5071","28.1","$50 to $100 million","Design underway","Design-Bid-Build"],
    [104,"Rehab","2027","North, East","60","Opeongo River Bridge, Madawaska River Bridge and Poverty Creek Culvert, Madawaska","Bridge replacement, Culvert replacement","Planned","2028-2029",null,"0","$50 to $100 million","Planning/EA underway","To be determined"],
    [105,"Rehab","2027","North, East","17","South of Hwy 101 southerly, including the Old Woman River Bridge, south of Wawa","Resurfacing, Bridge rehabilitation, Paved shoulders, Culvert replacement","Planned","2028-2029",null,"21.6","$25 to $50 million","Design underway","Design-Bid-Build"],
    [106,"Rehab","2027","North, East","17","West of Markstay easterly to Hagar","Resurfacing, Paved shoulders, Bridge rehabilitation","Planned","2028-2029","2026-5016","20.4","$25 to $50 million","Design underway","Design-Bid-Build"],
    [107,"Rehab","2027","North, East","579","Clute Creek Culverts, north of Cochrane","Culvert replacement","Planned","2027","2024-5019","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [108,"Rehab","2027","North, East","11","0.1 km south of Lakeshore Dr. northerly 0.7 km, Temagami","Resurfacing","Planned","2028-2029","2025-5021","0.7","$0 to $10 million","Design underway","Design-Bid-Build"],
    [109,"Rehab","2027","North, East","519","Magpie River Bridge, Dubreuilville","Bridge rehabilitation","Planned","2027",null,"0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [110,"Rehab","2027","North, East","144","10.2 km south of Hwy 560 to 9.9 km north of Hwy 560, Westree","Resurfacing","Planned","2028-2029",null,"20.1","$25 to $50 million","Design underway","Design-Bid-Build"],
    [111,"Rehab","2027","North, East","129","Mississagi River Bridge, Wharncliffe","Bridge replacement","Planned","2028-2029",null,"0","$25 to $50 million","Design underway","Design-Bid-Build"],
    [112,"Rehab","2027","North, West","11","CNR Rainy Lake overhead, 2 km east of Hwy 502, east of Fort Frances","Bridge rehabilitation","Planned","2027","2023-6016","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [113,"Rehab","2027","North, West","11","Boom Creek Culvert, 14.0 km north of Hwy 17, north of Nipigon","Culvert replacement","Planned","2027","2026-6022","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [114,"Rehab","2027","North, West","17, 17A, 525, 596, 641, 658, 671, To be assigned","Various locations, Hwy 17, 17A, 71, 525, 596, 641, 658, 671 and 7059, Kenora, east/west/north of Kenora, north of Sioux Narrows-Nestor Falls","Culvert replacement","Planned","2027","2026-6023","0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [115,"Rehab","2027","North, West","11, 502, 601, 605, 665","Various locations, Hwy 11, 17, 502, 594, 601, 665 and 605, Machin, east/west/south of Dryden, east of Fort Frances","Culvert replacement","Planned","2027","2025-6018","0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [116,"Rehab","2027","North, West","105, 17, 594","Various locations, Hwy 105, 125, 609, 618, 657, 647, and 804, Machin, north of Machin, Ear Falls, west/north/south of Earfalls, Red Lake","Culvert replacement","Planned","2027","2025-6019","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [117,"Rehab","2027","North, West","11, 600, 602, 611, 613, 615, 617, 619, 621, 71","Various locations, Hwy 11, 71, 600, 602, 611, 613, 615, 617, 619 and 621, Sioux Narrows-Nestor Falls, Lake of the Woods, Dawson, Morley, Chapple, Emo, La Vallee, Alberton","Culvert replacement","Planned","2027","2025-6020","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [118,"Rehab","2027","North, West","17","13 km west of Hwy 11 at Shabaqua Corners westerly, west of Conmee","Resurfacing, Paved shoulders","Planned","2028-2029","2027-6002","26.4","$25 to $50 million","Design in procurement","Design-Bid-Build"],
    [119,"Rehab","2027","North, West","642","Hwy 72 and 516 Junction easterly to Sturgeon River Bridge, Sioux Lookout","Resurfacing","Planned","2028-2029","2026-6032","9.9","$0 to $10 million","Design complete","Design-Bid-Build"],
    [120,"Rehab","2027","North, West","17, 71","West limit of Kenora westerly to Hwy 17A west connection, and 11.0 km east of Hwy 71 westerly to east limit of Kenora including Hwy 71 junction","Resurfacing","Planned","2028-2029","2026-6001","26","$25 to $50 million","Design underway","Design-Bid-Build"],
    [121,"Rehab","2027","North, West","11","Coldwater Creek Bridge, 6 km west of south junction Hwy 582, Dorion","Bridge rehabilitation","Planned","2027",null,"0","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [122,"Rehab","2027","North, West","619","Pinewood River Bridge, 2 km north of Hwy 11, Dawson","Bridge rehabilitation","Planned","2027","2024-6014","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [123,"Rehab","2027","North, West","588","Silver Creek Culvert, 10 km south of Hwy 11/17, O'Connor","Culvert rehabilitation","Planned","2027","2025-6027","0","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [124,"Rehab","2027","North, West","17","Revell River No. 3 Bridge, 1 km east of Hwy 622, west of Ignace","Bridge rehabilitation","Planned","2027","2026-6002","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [125,"Rehab","2027","North, West","11","6.0 km east of Hwy 102 easterly, Thunder Bay, Shuniah","Resurfacing, Paved shoulders","Planned","2028-2029","2026-6003","29.3","$10 to $25 million","Planning/EA underway","Design-Bid-Build"],
    [126,"Rehab","2027","North, West","17","Crocker Lake East Culvert, 8 km west of Hwy 631, west of White River","Culvert replacement","Planned","2027","2027-6003","0","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [127,"Rehab","2027","North, West","597","Moores Creek Modular Bridge, 9 km south of Hwy 608, Neebing","Bridge replacement","Planned","2027","2027-6004","0","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [128,"Rehab","2027","North, West","11","Bullrush Lake Culvert, 30 km north of Hwy 17, south of Greenstone","Culvert replacement","Planned","2027","2027-6005","0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [129,"Rehab","2027","North, West","808","Pineimuta River Modular Bridge, 141 km north of Hwy 599, Central Patricia","Bridge replacement","Planned","2028-2029","2026-6007","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [130,"Rehab","2027","North, West","11","Oskondaga River Bridge, east of Hwy 11/17 west junction at Shabaqua Corners, west of Conmee","Bridge rehabilitation","Planned","2027","2026-6008","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [131,"Rehab","2027","North, West","17","Gulliver River Bridge, 10 km east of Hwy 599, east of Ignace","Bridge rehabilitation","Planned","2027","2026-6009","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [132,"Rehab","2027","North, West","17","Beaver Creek Bridge, 9 km west of Hwy 605, Machin","Bridge rehabilitation","Planned","2027","2026-6011","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [133,"Rehab","2027","North, West","105","English River Bridge, Ear Falls and Perrault Falls Culvert, south of Ear Falls","Bridge rehabilitation, Culvert rehabilitation","Planned","2028-2029","2024-6003","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [134,"Rehab","2027","North, West","17","2 km west of Hwy 614 westerly, east of Marathon","Reconstruction, Paved shoulders, Hazard rock removal, Safety improvements","Planned","2027","2025-6006","20.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [135,"Rehab","2027","North, West","125","Hwy 105 northerly to north limit of Cochenour, Red Lake","Reconstruction","Planned","2027",null,"13.6","$10 to $25 million","Design underway","Design-Bid-Build"],
    [136,"Rehab","2027","North, West","17","Melgund Creek, Osaquan River, Shoshowae Creek East and Sisson Creek Culverts, west of Hwy 603, 11 km west of Hwy 599, 8 km west of Hwy 665 and 66 km east of Hwy 599, east and west of Ignace","Culvert rehabilitation","Planned","2027","2026-6015","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [137,"Rehab","2027","North, West","502","Marguerite St. Bridge, west of Hwy 17, Dryden","Bridge rehabilitation","Planned","2027","2027-6006","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [138,"Rehab","2027","North, West","502","Rattlesnake Creek Culvert, 56 km south of Hwy 594, south of Dryden","Culvert replacement","Planned","2027","2027-6001","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [139,"Rehab","2027","North, West","811","Gull River Culverts, 17 km west of Hwy 527, north of Thunder Bay","Culvert replacement","Planned","2027","2025-6023","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [140,"Rehab","2027","North, West","588","2 km south of Hwy 11/17 westerly, Oliver Paipoonge, O'Connor, Gillies","Reconstruction","Planned","2027","2026-6021","13.4","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [141,"Rehab","2027","North, West","17","Rest Creek Culvert, 24 km west of Raith, west of Conmee","Culvert rehabilitation","Planned","2027",null,"0","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [142,"Rehab","2027","North, West","11","Corbett Creek Culverts and McIntyre Creek Drainage Culverts,  5.0 km west of Hwy 130 and 1.0 km west of Hwy 102, Thunder Bay, Oliver Paipoonge","Culvert rehabilitation","Planned","2027","2027-6008","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [143,"Rehab","2027","North, West","17","Little Pic River Bridge westerly, west of Marathon","Realignment, Truck climbing lane, Paved shoulders","Planned","2028-2029","2027-6009","4.5","$50 to $100 million","Design underway","Design-Bid-Build"],
    [144,"Rehab","2027","North, West","17A","CPKC overhead, 2 km east of Hwy 671, east of Kenora","Bridge rehabilitation","Planned","2027","2025-6007","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [145,"Rehab","2027","North, West","17","Steel River Bridge westerly, east of Terrace Bay","Realignment, Truck climbing lane, Paved shoulders","Planned","2028-2029","2023-6038","4.1","$25 to $50 million","Design underway","Design-Bid-Build"],
    [146,"Rehab","2027","North, West","599","Hwy 642 at Silver Dollar northerly, north of Ignace","Reconstruction","Planned","2028-2029","2025-6026","41","$10 to $25 million","Design in procurement","Design-Bid-Build"],
    [147,"Rehab","2027","North, West","125","Chukuni River Bridge, 4 km east of Hwy 105, south of Balmertown, Red Lake","Bridge replacement","Planned","2028-2029","2027-6010","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [148,"Rehab","2027","North, West","600","Lathe Mill Culvert, west of Hwy 621, Lake of the Woods","Culvert replacement","Planned","2027",null,"0","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [149,"Rehab","2027","North, West","Not applicable","Kasabonika Modular Bridge, Kasabonika Remote Northern Airport","Bridge replacement","Planned","2027","2024-6007","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [150,"Rehab","2027","North, West","808","Otoskwin River Bridge, 60 km north of Hwy 599, north of Pickle Lake","Bridge replacement","Planned","2027","2027-6011","0","$10 to $25 million","Planning/EA upcoming","Design-Bid-Build"],
    [151,"Rehab","2027","North, West","17","Ruby and Fire Hill Creek Culverts, 4 and 10 km east of Hwy 11, east of Nipigon","Culvert rehabilitation","Planned","2027","2027-6012","0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [152,"Rehab","2027","North, West","11","Omer Lake Culvert, 46 km north of Hwy 17, Greenstone","Culvert replacement","Planned","2027","2025-6013","0","$0 to $10 million","Design complete","Design-Bid-Build"],
    [153,"Rehab","2028-2029","North, East","534","Steels Creek Culvert, 11.8 km west of Hwy 654, Nipissing","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [154,"Rehab","2028-2029","North, East","533","11 km north of the junction of Hwy 656, northerly, Mattawa","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [155,"Rehab","2028-2029","North, East","518","Kearney Rd. to Star Lake Rd., Emsdale","Resurfacing","Planned","2028-2029",null,"8.1","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [156,"Rehab","2028-2029","North, East","141, 632","4.4 km west of Rosseau River Bridge westerly, Rosseau","Resurfacing","Planned","2028-2029",null,"19.1","$25 to $50 million","Design in procurement","Design-Bid-Build"],
    [157,"Rehab","2028-2029","North, East","17","Rest area, Agawa Bay","New facility","Planned","2028-2029",null,"0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [158,"Rehab","2028-2029","North, East","124","North junction of Hwy 11 to Goreville Rd., north of South River","Resurfacing","Planned","2028-2029",null,"5.2","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [159,"Rehab","2028-2029","North, East","6","Wakawagami Creek, Manitowaning","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [160,"Rehab","2028-2029","North, East","805","Azen Creek Culvert and Mud Lake Culvert, north of Hwy 539, River Valley","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [161,"Rehab","2028-2029","North, East","522","8.2 km west of Hwy 524 to 26.2 km west of Hwy 524, Commanda","Resurfacing","Planned","2028-2029",null,"18","$10 to $25 million","Design in procurement","Design-Bid-Build"],
    [162,"Rehab","2028-2029","North, East","624, 66","Quebec-Ontario provincial border to 2.3 km west of Hwy 624, Virginiatown","Resurfacing","Planned","2028-2029",null,"21","$10 to $25 million","Design in procurement","Design-Bid-Build"],
    [163,"Rehab","2028-2029","North, East","11","17.2 km north of Hwy 64 to 0.2 km south of Wilson Lake Rd., north of Marten River","Resurfacing","Planned","Not available",null,"10.2","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [164,"Rehab","2028-2029","North, East","17","Junction Creek Bridge, 8.9 km west of Sudbury Municipal Rd. 80 Middle Interchange","Bridge replacement","Planned","Not available","2026-5023","0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [165,"Rehab","2028-2029","North, East","To be assigned","Portage Creek Bridge, north of MacTier","Bridge replacement","Planned","2028-2029",null,"0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [166,"Rehab","2028-2029","North, East","400, To be assigned","Mill Lake Bridge northerly 16.3 km, Parry Sound","Resurfacing","Planned","2028-2029",null,"17.9","$25 to $50 million","Design in procurement","Design-Bid-Build"],
    [167,"Rehab","2028-2029","North, East","637, To be assigned","Wanapitei River Bridge and Mahzenazing River Bridge, Wanup","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [168,"Rehab","2028-2029","North, East","101","Groundhog River and Cripple Creek, east of Foleyet","Bridge replacement, Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [169,"Rehab","2028-2029","North, East","579","Clute Creek Culvert #2 13 km north of Hwy 11 and culvert 3.3 km north of Hwy 11, Cochrane","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [170,"Rehab","2028-2029","North, East","17","Root River Culverts, north of Hwy 7045, Sault Ste. Marie","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design upcoming","To be determined"],
    [171,"Rehab","2028-2029","North, East","11, 520","1 km north of Hwy 520 northerly 8.7 km, Burk's Falls","Resurfacing","Planned","2028-2029",null,"8.7","$10 to $25 million","Design underway","Design-Bid-Build"],
    [172,"Rehab","2028-2029","North, East","535, 64","Hwy 528 northerly 21.7 km and Hwy 535 from Hwy 64 northerly 2.1 km, Noelville","Resurfacing, Paved shoulders","Planned","2028-2029",null,"23.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [173,"Rehab","2028-2029","North, East","631","Nagagamisis Lake Bridge northerly 31.2 km, Hornepayne","Resurfacing","Planned","2028-2029",null,"31.2","$0 to $10 million","Design underway","Design-Bid-Build"],
    [174,"Rehab","2028-2029","North, East","400","CNR Overhead Bridges 0.9 km south of Hwy 141,  Humphrey","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [175,"Rehab","2028-2029","North, East","101","Black River Bridge, 0.7 km north of Hwy 11, Matheson","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [176,"Rehab","2028-2029","North, East","63","North Bay to 16.8 km south of Hwy 533, North Bay","Culvert replacement, Resurfacing","Planned","2028-2029",null,"18.7","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [177,"Rehab","2028-2029","North, East","17","Mattawa to 7.9 km east of Hwy 630, Mattawa","Resurfacing","Planned","2028-2029",null,"12.2","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [178,"Rehab","2028-2029","North, East","11","Hwy 66 to 3.5 km south of Hwy 570, Kenogami Lake","Resurfacing","Planned","2028-2029",null,"11.4","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [179,"Rehab","2028-2029","North, East","11","Sand Dam Rd. northerly to Ellsmere Rd., North Bay","Safety improvements, Resurfacing, Passing lane, Paved shoulders, New bridge, New culvert","Planned","Not available",null,"13.8","$100 to $250 million","Design underway","Design-Bid-Build"],
    [180,"Rehab","2028-2029","North, East","101","East of north junction Hwy 101 easterly, east of Chapleau","Resurfacing","Planned","2028-2029",null,"21.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [181,"Rehab","2028-2029","North, East","520","North Creek Bridge, 3 km west of Hwy 11, Magnetawan","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [182,"Rehab","2028-2029","North, East","11, To be assigned","1 km north of Stirling Creek Rd. to Muskoka Rd. overpass, Sundridge","Resurfacing","Planned","2028-2029",null,"9","$0 to $10 million","Design underway","Design-Bid-Build"],
    [183,"Rehab","2028-2029","North, East","124","West junction of Hwy 520 to McKellar","Resurfacing","Planned","2028-2029",null,"17.8","$25 to $50 million","Design upcoming","Design-Bid-Build"],
    [184,"Rehab","2028-2029","North, East","518, 592","Star Lake Rd. to the junction of Hwy 11/518 and Deer Lake Rd. to the north junction of Hwy 11, Emsdale","Resurfacing","Planned","2028-2029",null,"4.3","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [185,"Rehab","2028-2029","North, East","To be assigned","Pickeral River Bridge, Bigwood","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [186,"Rehab","2028-2029","North, East","17, To be assigned","East junction of Regional Rd. 55 to Hwy 69, Sudbury","Resurfacing","Planned","Not available",null,"12.5","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [187,"Rehab","2028-2029","North, East","6","South Baymouth northerly 23.8 km","Resurfacing","Planned","2028-2029",null,"23.8","$10 to $25 million","Design underway","Design-Bid-Build"],
    [188,"Rehab","2028-2029","North, East","101","Salve (Painkiller) Creek Bridge, Matheson","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [189,"Rehab","2028-2029","North, East","101","ONR crossing easterly, Timmins","Resurfacing","Planned","2028-2029",null,"17.3","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [190,"Rehab","2028-2029","North, East","112","Murdock Creek and unnamed culvert, 5.8 km south of Hwy 66, Kirkland Lake","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA in procurement","To be determined"],
    [191,"Rehab","2028-2029","North, East","11","Unnamed culvert, 3.4 km north of Hwy 560, Englehart","Culvert rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [192,"Rehab","2028-2029","North, East","569","Moose Creek Culvert, Couttsville","Culvert rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design underway","Design-Bid-Build"],
    [193,"Rehab","2028-2029","North, East","101, 129","Hwy 129 from north junction of Hwy 101 northerly to Chapleau and Hwy 101 from the south junction of Hwy 129 easterly and Poulin Creek Culvert, Chapleau","Culvert replacement, Resurfacing","Planned","2028-2029",null,"35.1","$25 to $50 million","Design underway","Design-Bid-Build"],
    [194,"Rehab","2028-2029","North, East","11","Net Lake Bridge, Temagami","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [195,"Rehab","2028-2029","North, East","655","14 km south of Hwy 11 to Hwy 11, Driftwood","Resurfacing","Planned","Not available",null,"14","$10 to $25 million","Design underway","Design-Bid-Build"],
    [196,"Rehab","2028-2029","North, East","11","6.5 km to 18.3 km north of Hwy 570, Sesekinika","Resurfacing","Planned","2028-2029",null,"11.8","$10 to $25 million","Design upcoming","To be determined"],
    [197,"Rehab","2028-2029","North, East","11","Driftwood to 2.9 km north of Hwy 634, Smooth Rock Falls","Resurfacing, Paved shoulders","Planned","Not available",null,"25.9","$25 to $50 million","Design underway","Design-Bid-Build"],
    [198,"Rehab","2028-2029","North, East","11","Hwy 663 to 7.7 km east of Hwy 631, Calstock","Resurfacing, Paved shoulders","Planned","2028-2029",null,"21.1","$10 to $25 million","Design underway","Design-Bid-Build"],
    [199,"Rehab","2028-2029","North, East","69","North junction of Hwy 529 to 3.4 km north of Hwy 522, Still River","Resurfacing, Intersection improvements","Planned","Not available",null,"18","$25 to $50 million","Design underway","Design-Bid-Build"],
    [200,"Rehab","2028-2029","North, East","60","Renfrew-Nipissing boundary to Hwy 523, Madawaska","Resurfacing, Paved shoulders","Planned","Not available",null,"13.5","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [201,"Rehab","2028-2029","North, East","6","CPR Swing Bridge (North Channel), north of Little Current","Bridge replacement","Planned","Not available",null,"0","$100 to $250 million","Design underway","Construction Manager General Contractor"],
    [202,"Rehab","2028-2029","North, East","63","16.7 km south of Hwy 533 northerly, Balsam Creek","Resurfacing","Planned","2028-2029",null,"17.8","$0 to $10 million","Design upcoming","Design-Bid-Build"],
    [203,"Rehab","2028-2029","North, East","562","Unknown creek culvert, 4.9 km west of Hwy 11, Earlton","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [204,"Rehab","2028-2029","North, East","11","Poplar Rapids River Bridge, 13.5 km west of Hwy 634, Smooth Rock Falls","Bridge replacement","Planned","2028-2029","2024-5008","0","$10 to $25 million","Design underway","Design-Build"],
    [205,"Rehab","2028-2029","North, East","17","Garden River Bridge, Root River Bridge, Echo Bay Bridge, Garden River","Bridge rehabilitation","Planned","2028-2029",null,"0","$10 to $25 million","Design underway","Design-Bid-Build"],
    [206,"Rehab","2028-2029","North, East","101, 129","South junction of Hwy 129 westerly to Lawson Lake, Chapleau","Resurfacing, Culvert replacement","Planned","2028-2029",null,"27","$25 to $50 million","Design underway","Design-Bid-Build"],
    [207,"Rehab","2028-2029","North, West","71","10 km south of Hwy 17 southerly, Sioux Narrows - Nestor Falls","Reconstruction, Paved shoulders","Planned","2028-2029","2025-6001","27.9","$10 to $25 million","Design underway","Design-Bid-Build"],
    [208,"Rehab","2028-2029","North, West","502","Hwy 17 southerly to Hwy 594, Dryden","Reconstruction","Planned","2028-2029",null,"3","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [209,"Rehab","2028-2029","North, West","17","West of Peninsula Rd. easterly, Marathon","Resurfacing, Paved shoulders","Planned","2028-2029",null,"17.8","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [210,"Rehab","2028-2029","North, West","71","Nestor Falls Bridge, 36.0 km north of Hwys 600 and 615, Sioux Narrows - Nestor Falls","Bridge replacement","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [211,"Rehab","2028-2029","North, West","17","5.0 km west of Little Pic River Bridge westerly, east of Terrace Bay","Resurfacing, Truck climbing lane, Paved shoulders","Planned","Not available",null,"25.9","$10 to $25 million","Planning/EA upcoming","To be determined"],
    [212,"Rehab","2028-2029","North, West","11","Postagoni River Culvert, 26 km west of Hwy 580, Greenstone","New bridge","Planned","2028-2029",null,"0","$10 to $25 million","Planning/EA underway","To be determined"],
    [213,"Rehab","2028-2029","North, West","17","Hwy 17, from 1.0 km east of Hwy 72 at Dinorwic westerly, Dryden","Resurfacing","Planned","2028-2029","2026-6004","30","$10 to $25 million","Planning/EA underway","Design-Bid-Build"],
    [214,"Rehab","2028-2029","North, West","11, 17, 595, 614","Hawk Lake Subway, Sitch Creek Culvert # 3, Maki Creek Culvert, Little Ozone Creek Culvert, Barbara Creek Culvert, east of Kenora, Gillies, north and east of Nipigon, south of Manitouwadge","Bridge rehabilitation, Culvert rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [215,"Rehab","2028-2029","North, West","11","Noden Causeway structures, 20, 21 and 22 km west of Hwy 502, east of Fort Frances","Bridge rehabilitation","Planned","2028-2029",null,"0","$10 to $25 million","Planning/EA upcoming","Design-Bid-Build"],
    [216,"Rehab","2028-2029","North, West","11, 11B, 622","West of Hwy 11B easterly, Hwy 11B and Hwy 622 northerly, Atikokan","Resurfacing, Paved shoulders","Planned","2028-2029",null,"28.4","$10 to $25 million","Planning/EA upcoming","Design-Bid-Build"],
    [217,"Rehab","2028-2029","North, West","582","Bruner Creek Culvert, 5 km south of Hwy 11/17 east junction, north of Dorion","Culvert replacement","Planned","2028-2029","2026-6010","0","$0 to $10 million","Planning/EA underway","To be determined"],
    [218,"Rehab","2028-2029","North, West","105","26 km north of Hwy 657 northerly, Ear Falls, north of Ear Falls","Resurfacing","Planned","2028-2029",null,"25.9","$10 to $25 million","Planning/EA underway","Design-Bid-Build"],
    [219,"Rehab","2028-2029","North, West","17","Little Firesteel River Bridge, 13 km west of Upsala, east of Ignace","Bridge replacement","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [220,"Rehab","2028-2029","North, West","17","Gravel River Bridge, 24 km west of Rossport, east of Nipigon","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [221,"Rehab","2028-2029","North, West","11","Blackwater River Bridge westerly, Greentstone","Paved shoulders, Resurfacing","Planned","2028-2029",null,"29","$10 to $25 million","Planning/EA upcoming","Design-Bid-Build"],
    [222,"Rehab","2028-2029","North, West","11","West of Hwy 613 westerly, La Vallee, Emo, Chapple","Resurfacing, Paved shoulders","Planned","2028-2029","2026-6012","24","$10 to $25 million","Design upcoming","Design-Bid-Build"],
    [223,"Rehab","2028-2029","North, West","17","Hwy 622 westerly to 3 km east of Hwy 603, west of Ignace","Resurfacing","Planned","2028-2029",null,"19.2","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [224,"Rehab","2028-2029","North, West","17","East of Hwy 105 at Vermilion Bay westerly, Machin","Resurfacing","Planned","2028-2029","2026-6013","35.1","$50 to $100 million","Design upcoming","Design-Bid-Build"],
    [225,"Rehab","2028-2029","North, West","61","Kaministiquia River Bridge, 7 km south of Hwy 11/17, Thunder Bay","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [226,"Rehab","2028-2029","North, West","102, 11","West of Hwy 589 westerly to Hwy 11/17, Thunder Bay, Oliver Paipoonge, north of Conmee","Resurfacing","Planned","2028-2029",null,"26.1","$0 to $10 million","Planning/EA underway","To be determined"],
    [227,"Rehab","2028-2029","North, West","11","Wolf River Bridge, 4.0 km west of Hwy 582 south junction, Dorion","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [228,"Rehab","2028-2029","North, West","71","Nestor Falls southerly, Sioux Narrows - Nestor Falls, Chapple","Resurfacing, Paved shoulders","Planned","2028-2029",null,"28.6","$10 to $25 million","Planning/EA upcoming","To be determined"],
    [229,"Rehab","2028-2029","North, West","17","CPKC and Hwy 641 overhead, west of Kenora","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [230,"Rehab","2028-2029","North, West","17","26 km east of Hwy 11 easterly including Dublin Creek Culvert, east of Nipigon","Realignment, Culvert replacement, Safety improvements","Planned","2028-2029",null,"1.6","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [231,"Rehab","2028-2029","North, West","593","Little Whitefish River Modular and Arrow River Bridges, 16 and 19 km south of Hwy 588, west of Neebing","Bridge rehabilitation, Bridge replacement","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [232,"Rehab","2028-2029","North, West","17","West junction of 17/17A westerly to Rush Bay Rd., west of Kenora","Resurfacing","Planned","2028-2029",null,"24","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [233,"Rehab","2028-2029","North, West","582","Morrow Creek Culvert, 3.0 km east of Hwy 11/17 & 582 west junction, north of Dorion","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [234,"Rehab","2028-2029","North, West","525","Pistol Lake Culvert, north of Hwy 596, northwest of Kenora","Culvert replacement","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [235,"Rehab","2028-2029","North, West","11","Cochrane/Thunder Bay District Boundary westerly, east of Greenstone","Resurfacing, Paved shoulders","Planned","2028-2029",null,"45.3","$10 to $25 million","Planning/EA upcoming","Design-Bid-Build"],
    [236,"Rehab","2028-2029","North, West","595","Pine River Bridge, west of Hwy 597, Neebing","Bridge rehabilitation","Planned","2028-2029","2027-6007","0","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [237,"Rehab","2028-2029","North, West","11","23 km east of Hwy 580 at Beardmore easterly, Greenstone","Resurfacing, Paved shoulders","Planned","2028-2029",null,"27.4","$10 to $25 million","Planning/EA upcoming","To be determined"],
    [238,"Rehab","2028-2029","North, West","11","12 km west Hwy 802 westerly, east of Atikokan","Resurfacing, Paved shoulders","Planned","2028-2029",null,"29.8","$10 to $25 million","Planning/EA upcoming","To be determined"],
    [239,"Rehab","2028-2029","North, West","11","Mine Centre westerly to Hwy 502, east of Fort Frances","Resurfacing, Paved shoulders","Planned","2028-2029",null,"36.4","$10 to $25 million","Planning/EA upcoming","Design-Bid-Build"],
    [240,"Rehab","2028-2029","North, West","17","Baker Creek and English River Culverts, 26 and 30 km west of Upsala, east of Ignace","Culvert rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [241,"Rehab","2028-2029","North, West","105","Hwy 618 southerly, Red Lake","Reconstruction","Planned","2028-2029","2025-6025","17","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [242,"Rehab","2028-2029","North, West","599","Hwy 17 at Ignace northerly to English River Bridge, north of Ignace","Reconstruction","Planned","2028-2029",null,"32.5","$0 to $10 million","Planning/EA underway","Design-Bid-Build"],
    [243,"Rehab","2028-2029","North, West","599","Savant Lake CNR crossing northerly, north of Ignace","Reconstruction","Planned","2028-2029",null,"38","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"],
    [244,"Rehab","2028-2029","North, West","599","North limit of Mishkeegogamang First Nation northerly to Pickle Lake","Reconstruction","Planned","2028-2029",null,"24","$0 to $10 million","Design in procurement","Design-Bid-Build"],
    [245,"Rehab","2028-2029","North, West","584","10 km north of Geraldton northerly, Greenstone","Reconstruction","Planned","2028-2029",null,"27","$10 to $25 million","Planning/EA underway","Design-Bid-Build"],
    [246,"Rehab","2028-2029","North, West","614","Manitouwadge southerly","Resurfacing","Planned","2028-2029",null,"25.8","$0 to $10 million","Planning/EA upcoming","To be determined"],
    [247,"Rehab","2028-2029","North, West","17","13 km west of Upsala westerly, east of Ignace","Resurfacing, Paved shoulders","Planned","2028-2029",null,"35.3","$10 to $25 million","Planning/EA upcoming","To be determined"],
    [248,"Rehab","2028-2029","North, West","811","Mooseland River Bridge, 31 km west of Hwy 527, north of Thunder Bay","Bridge rehabilitation","Planned","2028-2029",null,"0","$0 to $10 million","Planning/EA upcoming","Design-Bid-Build"]
]}